How to price small construction jobs without missing your costs

Build a price for the whole visit, with a worked example and a clear approach to minimum charges.

Contractor reviewing a phone beside a small toolbox and a wall shelf at a short residential repair visit

Before you start

  • Price the whole visit, including travel, preparation, fitting and cleanup.
  • Count shared costs once when combining several tasks in one booking.
  • Use your own costs and keep markup separate from margin.

A price for a small job should cover everything from leaving for site to finishing the paperwork, plus your real costs and a markup. The usual mistake is quoting only the repair or fitting time. Travel, setup and cleanup still take your day, so they need to be in the price.

Here's one short visit worked through from cost to price.

A worked example: one short visit from cost to price

These are sample prices in USD; use your own costs for your job. The $180 below is the result for this one job, not a minimum charge for anyone else.

Start with person-hours, meaning one person working for one hour. Count every stage of the visit:

Stage Person-hours
Travel and collecting materials 0.75
Protection and setup 0.25
Fitting 1.00
Cleanup and admin 0.50
Total 2.5

Now turn those hours and your other costs into a price:

Item Amount (USD)
Labour: 2.5 hours × $40 loaded labour cost 100
Consumables 15
Vehicle cost 12
Allocated business overhead 23
Total cost 150
Markup at 20% of cost 30
Price before tax 180

In this article, loaded labour cost means the wage plus the employment costs that come with it, but not overhead or profit. Overhead gets its own line, and profit comes from the markup. If you define your labour cost differently, adjust the lines so nothing is missing and nothing is counted twice.

The fitting is only 1 of the 2.5 hours. If you priced just the fitting, 1.5 hours of the visit would go unpaid before you'd covered a single material or vehicle cost.

Putting the estimate together faster

If you spend longer building the estimate than you expect to spend fitting the item, it helps to have the job costs brought together for you.

Construction Job Estimator lets you describe the job by voice or text, including the measurements you've taken, and add site photos. It turns those details into a working estimate that brings materials, labour and other costs like delivery, equipment hire and disposal into one place. You can see the quantities, prices and labour behind each figure, and adjust labour time, rates, markup and individual line items.

Check that setup and cleanup time are in the visit and that overhead appears once. When you're happy with the figures, prepare a professional estimate or quote, then convert it to an invoice when you're ready to bill. There's a seven-day free trial if you want to try it on your next short job.

Is your minimum charge the same as a callout fee?

They're related but not the same. A minimum booking is the least you'll take to turn up and do a short job. A callout is a separate charge for making the trip.

The risk is counting the trip twice. If your minimum booking already covers travel, collection and setup, adding a callout on top charges for those costs twice. If you bill a separate callout, keep travel out of the minimum and build the minimum from the work and setup only.

Either way works. Pick one, apply it to every short job, and base it on your own visit costs rather than a figure you've heard somewhere.

Combining several small tasks in one visit

When a customer wants three small things done in one trip, travel and collection happen once. So does most of your protection and setup. Price each task's own working time and materials, then add one shared block for the visit.

Quoting each task as if it were a separate visit inflates the total, and the customer may go elsewhere. Don't swing the other way and drop setup altogether, though. If a second task is in a different room or needs different protection, it needs its own setup time.

Count overhead once and distinguish markup from margin

Overhead counts once. In the example, the $40 loaded labour cost excludes overhead, which is why $23 of allocated overhead is a separate line. If your hourly rate already includes overhead, adding an overhead line on top charges for it twice.

Markup isn't margin. A 20% markup on a $150 cost adds $30, so the price is $180. But $30 out of $180 is about 16.7%, so that's your margin on price, not 20%. To end up with a 20% margin on price, you'd divide cost by 0.8: $150 ÷ 0.8 = $187.50. That's a 25% markup on cost. Decide which number you're targeting, and use the matching calculation.

Check your price before you send it

Run through these questions with your own numbers:

  • Have I counted every person-hour, from leaving for site to finishing the admin?
  • Is travel inside my minimum or in a separate callout, but not both?
  • Is overhead inside my hourly rate or added as its own line, but not both?
  • Is my markup on cost giving me the margin on price I think it is?

Then build the price for your next short job from your own costs, using the same structure as the table above. If the total feels high next to the time on the tools, look at which lines make it up. Those are costs you'll carry whether you count them or not.

← Back to all guides

Construction Job Estimator

Your next estimate.
Ready in minutes.

Tell us what needs doing. Get real-time material prices from local suppliers, bring your labour and other costs together, and send your customer a professional estimate.

Take the next job from description to estimate.

★★★★★ Used by 10k+ contractors