A clear price. A professional first impression.

Free drywall repair estimate templateMake the next job
look this good.

Download the blank PDF, the completed PDF or the editable Excel file for patch-by-patch drywall repair. The sample prices three wall repairs totaling 8 sq ft at 1,030 USD before applicable tax. It's built for repair work, not whole-room board installation.

PDF & Excel · No signup for templates · By Daniel

DRYWALL REPAIR ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Three localized wall repairsOne 2 × 3 ft opening · two 1 × 1 ft patches
Protection and setup2 hours × $65
$130
Board and repair materials1 package × $95
$95
Backing and patch fitting3 hours × $65
$195
Finishing and sanding5 hours × $65
$325
Texture blend and spot primer1 package × $130
$130
Travel for return visits2 visits × $40
$80
Cleanup and waste1 job × $75
$75
Subtotal Before applicable tax$1,030USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your drywall repair estimate include?

Each file has the same layout: scope, exclusions, labor in person-hours, material and finish packages, travel, cleanup and a subtotal. The PDF is printed and filled in by hand. The Excel file is editable and totals with formulas. It has eight rows, and the sample uses seven. Row descriptions can be changed, and the browser editor supports customization.

Each opening and the total area

List every opening with its size, then add them up. The sample records 2 × 3 ft, 1 × 1 ft and 1 × 1 ft, for 8 sq ft. A written list of patches keeps the customer and you looking at the same repair.

A scope sentence

State what's included: backing, board, tape, compound, sanding, an agreed texture blend and spot primer. A short sentence like this tells the customer what the price buys and where the work stops.

Labor in person-hours by task

Break labor into protection, fitting and finishing, each with hours and a rate. Hours worked are different from the number of planned visits, so keep them in separate places on the page.

Materials and package lines

Show the board and repair materials as a line, and note how much of the purchased sheet is actually used. A short description on each package line shows the customer what's inside it.

Travel and cleanup

Give return-visit travel its own line, apart from finishing labor. Add cleanup and ordinary repair waste as a separate line so the customer sees where those costs sit.

Exclusions, assessment and tax

List what's left out and note that existing damage must be assessed before work. Add a line saying applicable tax is added separately to the subtotal, so the number you quote isn't mistaken for the final total.

From site visit to a clear figure

How to write your drywall repair estimate.

  1. Record the openings and total the area

    Measure each opening and write its size on the sheet. Add the areas to get the repair total. For the sample, that's 8 sq ft. This number drives your fitting hours and your materials line.

  2. Write the scope and exclusions first

    Before any prices, describe what you'll do and what you won't. Put leak correction, mold remediation, structural work, rated assembly restoration and full-wall finish paint under exclusions if they apply. It's easier to price a job once its edges are clear.

  3. Price labor, then packages

    Enter person-hours for each task at your rate. Then add materials and any all-in package such as texture blend and spot primer. A package that already includes its labor shouldn't get another labor line on top.

  4. Add travel, cleanup and the subtotal

    Enter return-visit travel and cleanup, then total the lines. Your rates should already carry overhead and profit, so don't mark up the subtotal again. Add applicable tax separately underneath.

  5. Print it, edit it, or build it on your phone

    Print the blank PDF to fill in by hand, or edit the Excel rows and let the formulas total them. If you'd rather build the estimate from a described job, Construction Job Estimator turns voice or text details, including measurements you've taken, into a professional estimate or quote. You can adjust quantities, labor time, rates, markup and line items. It runs on iOS and Android at $19.99 per month.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked drywall repair estimate example.

This sample covers one 2 × 3 ft opening and two 1 × 1 ft patches, which add up to 8 sq ft. Amounts are illustrative customer selling prices in USD, with overhead and profit included once. Use your own costs and rates for your job.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Three localized wall repairs with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and setupProtect the three work locations and adjacent surfaces.2 hours × $652 hours$65$130
Board and repair materialsOne 4 × 8 ft sheet, backing, fasteners, tape and compound.1 package × $951 package$95$95
Backing and patch fittingFit the three patches; 8 sq ft installed in total.3 hours × $653 hours$65$195
Finishing and sandingHands-on finishing across planned visits; no drying hours charged.5 hours × $655 hours$65$325
Texture blend and spot primerLabor and materials on repaired areas; exact texture match not promised.1 package × $1301 package$130$130
Travel for return visitsTwo return trips after the first setup; travel only.2 visits × $402 visits$40$80
Cleanup and wasteFinal cleanup labor and ordinary repair waste disposal.1 job × $751 job$75$75
Subtotal before applicable tax (USD)$1,030

How the subtotal adds up Protection and setup is 130, board and repair materials 95, backing and patch fitting 195, finishing and sanding 325, texture blend and spot primer 130, travel 80 and cleanup and waste 75. That totals 1,030 USD before applicable tax, which is added separately. The three hourly labor lines total 10 person-hours at $65. Other labor is included in the texture/primer and cleanup packages.

Installed area versus the sheet you buy The patches total 8 sq ft (6 + 1 + 1), but one purchased 4 × 8 ft sheet covers 32 sq ft. Fitting labor is tied to the 8 sq ft installed, not the leftover board. The 95 materials line is a sample allowance for the sheet, backing, fasteners, tape and compound.

What the price does and doesn't promise Three planned visits are a scheduling allowance, not a guaranteed finish date, and no drying time is charged as labor. Travel covers two return trips only. The texture blend isn't promised as an exact match, and spot primer isn't full-wall repainting. Leak correction, mold remediation, structural work, rated assembly restoration and full-wall finish paint are excluded.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Billing installation on the whole sheet

A purchased 32 sq ft sheet does not mean 32 sq ft of repair work. Price the actual patches, preparation and finishing effort. This sample uses a fixed allowance of three fitting hours for the 8 sq ft repair; the materials package covers the sheet purchased.

02

Charging drying time or promising visit counts

Setting and drying depend on the product and conditions, so don't bill them as hands-on hours. Treat the planned visits as an allowance, and write finishing labor as the hours you actually work.

03

Stacking labor or markup on a package

If a package already includes labor, adding labor hours again counts it twice. The same goes for a second markup on prices that already include overhead and profit. Add each cost once.

04

Leaving out the exclusions

If the page doesn't say leaks, mold, structural work, rated assemblies or full-wall paint are excluded, the customer may assume they're covered. Don't promise an exact texture match either. Say you'll blend it.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Drywall repair estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Why charge for two return trips when finishing is already in hours?

Hours pay for hands-on work. Travel covers getting back to the site, so it's a separate line. In the sample, two return trips after setup are priced at 40 each and aren't counted as finishing labor.

Can I change the number of visits?

Yes. Three visits is a sample allowance, not a rule. Change your hours and travel lines to match your plan, and avoid promising a completion date, since drying and setting depend on the product and conditions.

What if I don't know what caused the damage?

Assess the existing damage before work starts. Keep leak correction and mold remediation out of this scope, and say so under exclusions. If the cause turns up something bigger, that's a separate conversation and a separate price.

What if I need more than seven lines?

The Excel file has eight rows, so the sample leaves one open for an extra item. You can also edit any description to fit your job. Tax goes on top of the subtotal, not in a row.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7

Your entries stay in this page. Download a copy before closing; refreshing clears them.