How to Bid on Plumbing for New Construction
Build a plumbing bid that covers the whole project, from underfloor work and rough-in to final connections and handover.

Before you start
- Confirm pipework, fixture supply and responsibilities before pricing.
- Allow for every construction stage and the return visits between them.
- Use a measured takeoff and your costs, rather than a flat price per fixture.
Collect the current documents, settle scope with the builder or GC, take off the specified work, price it by stage, add overhead and profit once, and submit with your assumptions written down. That means pricing the whole job, including the visits between rough-in and the final connections.
Get the right documents before you price
Start with the current drawings, the plumbing specification, the fixture and equipment schedules, and any revisions or addenda. Check the bid deadline and whether the builder wants a specific bid form. Note the revision you priced from, because it goes on the bid.
Then compare the drawings against the specification. If they disagree on a pipe material, a fixture count or a piece of equipment, ask the builder or design team before you set a fixed price. Keep the answer in writing. A fixed price built on a guess about which document wins is where many losses start.
When you're ready to lay out the finished bid, the plumbing estimate template gives you a layout to work from.
Settle scope boundaries with the builder or GC
New-build plumbing has several places where each trade assumes someone else is pricing the work. Ask about each of these:
- Building plumbing versus incoming water and sewer connections
- Excavation and backfill
- Gas
- Fire sprinklers
- Heating
- Electrical connections to equipment you install
- Waterproofing
- Penetrations and firestopping
Treat these as questions to answer, not blanket exclusions. If the project requires the work, don't quietly leave it out of your price. Resolve it and write down who does it. For example, you might confirm that the builder handles excavation and backfill while you handle the building plumbing.
If the bid allows a provisional allowance or a qualification, label it clearly and ask for agreement. It doesn't replace scope the project requires.
Take off the pipe, fittings and fixtures
Take off the specified pipe by system, material and diameter, following the actual route. Include the vertical runs. Don't scale a price from floor area. Then count the fittings, valves, supports, insulation and connection accessories that go with that pipe.
List every fixture and piece of equipment with its model, who supplies it and who installs it. Two houses with the same floor area or fixture count can have very different routes and very different work. Per-fixture and per-square-foot figures are useful as a sanity check after you've costed the job in full, not as the way you build the price. Uponor makes a similar distinction on its construction services page: a material takeoff, a square-foot budget estimate and design tasks like sizing are different jobs.
If you want to spend less time assembling that list and turning it into a price, Construction Job Estimator can help. Describe the job by voice or text, include the measurements you've taken, and add site photos. The app pulls real-time material prices from local suppliers, including shops you already use, into one working estimate. You can review the materials, labor and other costs together, adjust the details, and prepare a professional estimate or quote in minutes. Check the quantities against your plans and use the specified products; you can also enter a supplier price you already have.
Price each stage, not just the total
Break the labor into the stages of a new build:
- Underground or underfloor work, where it applies
- Above-floor rough-in
- Fixture fit-off and final connections
- Testing and handover
Use person-hours for each stage. A two-person crew working eight hours is 16 person-hours, not 8. Keep that separate from elapsed job time, since the crew might spread those hours across several days.
Put the small tasks inside the stage hours so they don't get forgotten: setting out, handling materials, coordination, attending inspections, cleanup, travel and repeated setup when you return to the same area. Pricing by stage also lets you check your payment milestones against material purchases and project progress. Stages are pricing units here, not calendar days or a promised schedule.
Allow for tests and return visits
Build testing and inspection into the bid so they happen before the relevant work is covered or backfilled. What's required comes from the project, the local authority and the manufacturer. Charlotte Pipe's current technical manual covers testing and inspection before its plastic piping is concealed or backfilled. Confirm the required inspection points with the builder so your crew can attend before other trades cover the work.
Carry an allowance for attendance and return visits as hours of work. Keep that separate from calendar waiting. A day of waiting is not automatically a full day of crew labor. Include actual paid standby, extra hire charges or return trips where they apply, and agree how schedule changes will be handled. Keep company overhead separate if it is not already included in your rates.
Lock down supplier quotes, fixtures and allowances
Check that each supplier quote matches the specified products, quantities and pack lengths. Confirm how long the price holds, what delivery costs and whether the quote includes tax.
When the client supplies the fixtures, you still need to price the compatible concealed parts and the labor to install them. Record the exact approved models before rough-in. Agree in advance who's responsible for missing, wrong or late parts, and how a price change gets handled.
If a fixture hasn't been selected, an allowance has to say what the amount covers and how the final selection adjusts your price. It isn't a fixed, fully specified item.
Add overhead and profit once
Build the price in this order: materials, labor and other direct costs, then company overhead, then markup. Each gets counted one time.
This is a hypothetical two-bathroom new house. The client supplies the sanitary fixtures and taps. You supply the specified pipe, fittings, valves and the electric water heater, and you connect the water heater's plumbing only. The electrician handles the electrical. The builder handles excavation, backfill and external utility connections. Those boundaries belong to this example only. All costs and hours below are hypothetical teaching inputs, not market rates or a measured takeoff for your project.
The materials allowance is $6,800. Labor is 184 person-hours at $42 per hour. Other direct costs total $900: $300 for equipment, $150 for delivery and $450 for project fees.
| Cost item | USD |
|---|---|
| Materials | 6,800 |
| Labor | 7,728 |
| Other direct costs | 900 |
| Direct cost | 15,428 |
| Company overhead | 1,200 |
| Total cost | 16,628 |
| Markup (25%) | 4,157 |
| Bid before tax | 20,785 |
Use your own supplier quotes, crew costs and project requirements.
The 184 hours split into 40 underfloor, 88 rough-in, 40 fit-off, and 16 for testing, coordination and handover. Travel, setup and handling are inside those stage hours. The $42 per hour covers wages and employment costs only, and overhead is separate.
A 25% markup is not a 25% margin. Here the $4,157 markup is 20% of the $20,785 bid. This markup is an example choice, not a recommended rate. If you want to test different markups, the contractor markup calculator does it quickly, and how to price plumbing jobs covers pricing more broadly. Don't turn this example into a per-fixture or per-square-foot rate.
Submit a bid the builder can compare
State the scope and the drawing and specification revisions you priced. List your responsibilities, inclusions and assumptions, including how you've treated each boundary you confirmed. If something is required, resolve it rather than excluding it.
Add any separately priced options the bid allows, the price validity period, your schedule information and the builder's required bid form. Check that your payment milestones fit your material purchases and the project stages.
Before you send it, run through this list:
- You've priced from the current documents and revisions.
- Scope questions are resolved, with any permitted allowances or qualifications clearly stated.
- Supplier quotes are confirmed.
- Stage hours are complete.
- Overhead and profit are counted once.