How to price plumbing jobs: from scope to customer estimate
Allow for access, fittings, purchasing and testing, then turn your job costs into a clear price for your customer.

Before you start
- Separate diagnostic attendance from a defined replacement job.
- Include fittings, access, purchasing and testing in your costs.
- Build overhead and profit into your selling rates once.
To price plumbing jobs, define the work, add up materials and labour, then include overhead and profit. Allow for the time around the replacement too: collecting parts, travel, testing and cleanup. Before you offer a fixed price, separate the work you can scope from any fault you still need to diagnose.
Decide whether it's a defined job or a diagnostic visit
A defined job has a scope you can describe in a sentence and check at the property. An open-ended callout doesn't. "Replace two approved bathroom faucets at the existing positions" is defined. "Find out why the vanity is leaking" is not, because the answer decides the work.
Keep the two apart on paper. If the customer needs a fault found, price the attendance on its own, say what it covers, and make any repair a separate approval. Don't tuck a guess about unseen work into a flat price. If you can't see enough to fix the scope, narrow it or investigate first.
The sample below is a defined job: two customer-approved bathroom basin faucets, replaced at the existing positions in one home. You've confirmed at assessment that the cabinets are accessible and the isolation valves are suitable. The basins, traps, drains and pipe routes stay. Compatible supply connections are replaced as specified.
Not included: diagnostic call-outs, emergency attendance, valve replacement, concealed repairs and cabinet repairs.
Worked example: your costs for two faucet replacements
These are sample prices in USD; use your own costs for your job. If you work in Canada, build the same table from your own CAD supplier prices and labour costs rather than simply relabelling these USD figures.
| Cost line | Basis | Your cost (USD) |
|---|---|---|
| Faucets | 2 × $180 | 360 |
| Supply connections and fittings | Allowance | 80 |
| Consumables | Allowance | 20 |
| Disposal fee | Allowance | 20 |
| Labour | 6 person-hours × $45 | 270 |
| Direct costs | 750 | |
| Allocated overhead | Your share for this job | 90 |
| Cost base | 840 | |
| Markup | 25% of $840 | 210 |
| Price before applicable tax | 1,050 |
The $45 is a fully loaded direct labour cost. It includes wages and employer costs but leaves out overhead and profit, which is why overhead gets its own line. For a separate check on your charge-out rate, use the contractor hourly rate calculator. Its result includes overhead, non-billable time and your target margin; don’t enter that selling rate as a direct labour cost here.
The six hours break down like this:
- Four hours: preparation, removal and replacement.
- One hour: checking, testing and handover.
- One hour: supplier collection, travel, cleanup and handling.
These are estimating allowances, not a work sequence. Your hours will change with the job.
Markup is not margin. A $210 markup on an $840 cost base is 25% markup, but it's only 20% of the $1,050 price ($210 ÷ $1,050). If you want a 25% margin, you'd need a different multiplier. The contractor markup calculator lets you check both.
What your customer sees: the selling table
Give your customer a breakdown of the work at the rates you charge. In this example, multiply materials and disposal costs by 1.25 once. For labour, include the allocated overhead before applying markup:
($270 + $90) ÷ 6 hours × 1.25 = $75 an hour
| Item | Quantity | Rate (USD) | Amount (USD) |
|---|---|---|---|
| Faucets | 2 | 225 | 450 |
| Supply connections and fittings | 1 | 100 | 100 |
| Consumables | 1 | 25 | 25 |
| Preparation and replacement | 4 hours | 75 | 300 |
| Testing and handover | 1 hour | 75 | 75 |
| Collection, travel and cleanup | 1 hour | 75 | 75 |
| Disposal fee | 1 | 25 | 25 |
| Total before applicable tax | 1,050 |
Overhead is already inside the $75 labour rate here. Don't add an overhead line or a profit line at the bottom, or you'll charge for them twice. The plumbing estimate template works from selling rates like these. It doesn't add markup for you, so enter the rates you've already marked up.
Fix the scope before you price the parts
A loose scope makes it hard to know what your price covers. Write down the actual faucet model and finish, and note which parts you're supplying. Spell out what you're replacing, what stays and what would need a new approval.
The faucet has to fit the sink it's going on. Mounting configuration matters, and Moen's lavatory faucet guide explains how it affects the choice. Check the existing sink against the faucet your customer picked before you order. A mismatch means a return trip and a change to the job.
Price the chosen products from a supplier quote, not memory. Look at what's in the box before you add separate connections or drain parts. The selected model may already include some of those parts. Check its contents so you don’t pay for or price them twice. The sample keeps the existing drains, so none are priced.
Construction Job Estimator can speed up the price side of this step. It shows real-time material prices from local suppliers, including shops you already use, so the faucets and fittings in your estimate start from current prices. They are material prices rather than a supplier's quote, so you still confirm the model and what's in the box yourself.
If your customer supplies the faucets, you drop the purchase from your costs. You pick up some risk, though. Check the model, that the parts are complete and when they'll arrive. Agree beforehand who is responsible if something's wrong and what an extra visit costs. Put that in writing.
Where labour hours move
The six hours in the sample assume everything you confirmed at assessment is true. Several things can push the number up or down:
- Access: a cramped or cluttered vanity slows the work.
- Existing valves and connections: their condition affects how smoothly the swap goes. The sample assumes suitable isolation valves. If they're defective, price valve replacement separately once you've assessed the scope.
- Water shutdown: coordinating it with the household takes time.
- Purchasing and return trips: a missed part costs travel and handling.
- Testing and handover: this takes real time, so it gets its own allowance.
Change the allowances to match the conditions. Six person-hours means the combined time everyone spends on the job. That could be one person working six hours; adding a second person won’t necessarily halve the visit. Your own working time has a cost too, so include it even if you pay yourself differently from an employee.
An allowance is different from an exclusion. The connections have an $80 cost allowance in your notes and a $100 selling allowance in the estimate. Specify which connections that covers before you send it. Defective valves are excluded and unpriced. Say so plainly on the estimate. Don't hide unknown work inside a vague allowance.
How to set your markup on plumbing parts
There isn’t a single parts markup that will suit every plumbing business. A published average would still need checking against your purchasing and handling costs. Start with what a part costs you beyond the supplier's invoice:
- Time spent ordering and collecting it
- Returns and restocking when a part is wrong or unused
- Handling warranty claims on parts you supplied
- Stock you carry in the van or shop
Check your own records for how often these happen and what they cost. Then watch for double counting. In the $1,050 example, supplier collection and travel already sit in the labour hours, and overhead has its own line. Don't load those costs into your parts markup a second time.
Markup is not margin. A $100 part marked up 25% sells for $125, and that $25 is 20% of the $125 price. It's the same relationship as the $210 on $840 earlier. Label your figure as markup or margin in your notes so nobody mixes them up.
Example: a minimum charge for a two-hour service visit
This is a separate job from the faucet replacement: a short service visit priced as a minimum charge. These are sample prices in USD; use your own costs for your job. They're not a market rate or a recommended charge.
Say you expect two hours on site plus one paid hour for travel and collection. That's three paid person-hours to cost. It doesn't automatically mean three hours billed to your customer.
| Cost line | Basis | Your cost (USD) |
|---|---|---|
| Labour | 3 person-hours × $45 | 135 |
| Vehicle and disposal | Cash cost | 15 |
| Allocated overhead | Your share for this visit | 30 |
| Cost base | 180 | |
| Markup | 25% of $180 | 45 |
| Minimum charge before parts and tax | 225 |
As in the first example, the $45 is employment cost only, and overhead has its own line. The $45 markup is 20% of the $225 price.
A customer who asks what two hours costs is really asking about the whole visit. Show them what the charge covers so they can see where the money goes. You can show a service fee plus time, or a stated minimum that covers travel, the vehicle and the first two hours on site. If you list two billed hours instead, your rate has to recover the travel and collection hour too, or you'll absorb it.
Say what's excluded and unpriced: parts, tax, and any work beyond the covered time, which needs your customer's approval first. The same method works for any minimum charge. Swap in your own hours, vehicle and disposal costs, and allocated overhead.
Cost, margin and net profit are not the same thing
These four terms get mixed up, so keep them apart:
- Cost: what the job costs you, for the lines you've chosen to count.
- Markup: the amount you add to cost, shown as a percentage of cost.
- Gross margin: revenue minus cost of sales, divided by revenue. Keep your cost-of-sales classification consistent.
- Net profit: what's left after every company expense is paid.
For this example, treating the $750 direct job costs as cost of sales leaves $300 gross profit, or about 28.6% of the $1,050 price. After the $90 allocated business overhead, $210 remains: 20% of the price. That second figure is after allocated overhead; it should not also be labelled gross margin.
Net profit comes only after everything else is paid. That includes costs you haven't allocated to jobs and time you can't bill. One job's margin can't tell you your annual net profit. It doesn't show how many jobs you win, how much of your time is billable or what you spend outside the job.
Set your own profit target from the business’s costs, capacity and income needs. Track your job margins and your company-wide results separately, and read each one for what it actually measures.
Flat price or hourly
The costing underneath is the same either way. With a defined scope like the faucet swap, you can give a flat price built from the table above. For work you can't scope yet, such as diagnosing a fault, agree your rates and the boundaries instead. Say what the first visit includes, and when you'll stop and ask for approval before going further.
Neither method is always better, and there's no standard rate to copy. Pick the one that matches how much you actually know about the job.
Get approval on the right terms
Before you send the price, confirm whether the actual job needs any permits or inspections, and add those costs if it does. Don't assume it's exempt because the last one was.
Put the scope, exclusions, supplied-part responsibilities and price on the estimate. Add how long the price holds and when payment is due, using your own terms. Once your customer approves that version, any extra work goes through a new approval.
Build the estimate in Construction Job Estimator
After a site visit, you can describe the job to Construction Job Estimator by voice or text and add photos of the work area. It turns your notes into a working estimate with materials, labour and other job costs in one place. You can see the quantities, prices and hours behind each figure, then change them to match your own costs, the faucet model you've confirmed and the hours you expect. When the numbers look right, you can prepare a professional estimate or quote for your customer in minutes, and convert it to an invoice once the work is approved.
Bidding on a new house rather than a replacement visit? See how to bid on plumbing for new construction for staged labor, fixture supply and responsibilities between trades.