Free contractor hourly rate calculator

What must each billable hour recover?

Build a rate from paid time, employment costs, overhead and the portion of your hours you can actually bill.

Free to use · No signup · By Daniel

Start with the job details.

Use your own figures or try the example.

Your entries stay in this page. Refreshing clears them.

Your calculation.

Calculated from the figures you enter.

A clear starting point
for the job ahead.

Fill in your measurements or costs to see the result and its breakdown here.

Construction Job Estimator app

Ready for the whole job?

Turn your billable rate into a clear customer estimate.

Keep the scope, materials and labour together in Construction Job Estimator.

Create an estimate in the app

Know what goes into the number.

How the calculation works

Load the paid-hour cost with employment costs. Add overhead per paid hour, divide by the billable share, then divide by (1 − target margin).

1

Measure the work.

Travel, admin, training and gaps in work can reduce the paid hours available for billing.

2

Apply the calculation.

Load the paid-hour cost with employment costs. Add overhead per paid hour, divide by the billable share, then divide by (1 − target margin).

3

Review the result.

Enter your own costs. This is not a wage survey or a recommended trade rate. Do not include an expense in both burden and overhead.

Worked example

See the calculation
come together.

25 per paid hour plus 20% employment costs gives 30. Overhead of 14,000 across 2,000 hours adds 7. At 70% billable and 20% margin, the rate is 66.07 per billable hour.

Illustrative inputs. Replace them with the figures for your job.

The example breakdown

Billable hourly rate before tax
66.07 USD
Loaded cost per paid hour
30 USD
Overhead per paid hour
7 USD
Cost per billable hour
52.86 USD
Billable hours annually
1,400 hours

Check the details before you quote.

Allow for non-billable time.

Travel, admin, training and gaps in work can reduce the paid hours available for billing.

Allocate overhead once.

Use the share attributable to the person or crew being modelled.

Check actual results.

Compare the assumed billable share with recorded time after jobs finish.

What the result covers

Enter your own costs. This is not a wage survey or a recommended trade rate. Do not include an expense in both burden and overhead.

Common questions

Are the example costs current market prices?

No. The worked example uses illustrative inputs. Enter current supplier quotes and your own labour and business costs.

Can I use this in the USA, Canada or the UK?

Use the measurement units shown beside each field and keep all prices in one currency. Currency selection labels amounts; it does not convert them.

What is outside this calculation?

Enter your own costs. This is not a wage survey or a recommended trade rate. Do not include an expense in both burden and overhead.

Can I save the calculation?

Yes. Once your inputs are complete, download a CSV or use Print / save PDF. Your copy includes the inputs and calculation limits. Refreshing this page clears your entries.