Free materials and labour cost calculator

What will the materials and labour cost?

Bring material quantities, person-hours and rates together. Add overhead and markup to see a clear price before tax.

Free to use · No signup · By Daniel

Build the job cost.

Use your own figures or try the example.

Your entries stay in this page. Refreshing clears them.

Your cost breakdown.

Calculated from the figures you enter.

A clear starting point
for the job ahead.

Fill in your measurements or costs to see the result and its breakdown here.

Construction Job Estimator app

Ready for the whole job?

Turn your material and labour costs into a customer estimate.

Keep the scope, materials and labour together in Construction Job Estimator.

Create an estimate in the app

Know what goes into the number.

Build a transparent cost basis

Multiply the material quantity by its unit cost and person-hours by hourly cost. Add other direct costs, then apply the entered overhead percentage to that direct subtotal. Finally apply markup to the combined cost. This is a small worksheet, not a supplier pricing service.

1

Price the materials.

Multiply the material quantity by the cost per unit. Use a consistent unit and include other direct costs separately.

2

Count person-hours.

Multiply the total hours worked by all people by the cost per person-hour. Two people working four hours is eight person-hours.

3

Add overhead and markup.

The overhead percentage applies to direct costs. Markup then applies to the combined cost basis. Review each amount before using the price.

Worked example

See the calculation
come together.

10 material units at 30 cost 300. Labour of 22 person-hours at 35 costs 770. Other direct costs of 80 bring the subtotal to 1,150. An illustrative 10% overhead adds 115. Applying 20% markup to 1,265 gives a selling price of 1,518 before tax.

Illustrative inputs. Replace them with the figures for your job.

The example breakdown

Materials
300 USD
Labour
770 USD
Other direct costs
80 USD
Overhead allowance
115 USD
Total cost basis
1,265 USD
Selling price before tax
1,518 USD

Check the details before you quote.

Match units to supplier rates.

If a supplier prices a pack, use a pack quantity. If you enter individual items, use the corresponding cost per item.

Separate different labour rates.

Use a checked weighted rate or calculate tasks separately when the people or work have different hourly costs.

Avoid double-counting costs.

Know what your hourly rate includes. Do not add the same employment or operating costs again as overhead.

Keep time and rates consistent

Enter person-hours, not elapsed site time. If tasks have different rates, use a separate worksheet for each or enter a checked weighted rate. Your hourly cost is not automatically the wage paid: decide which employment and operating costs it includes so you neither omit nor double count them.

Common questions

Can I enter several types of material?

This worksheet has one quantity and rate. Calculate different materials separately, or enter quantity 1 with your checked total material cost. The app helps bring the full job breakdown together.

What is a person-hour?

One person working one hour. For example, three people working five hours each use 15 person-hours.

Does the hourly cost mean the wage paid?

Not necessarily. Use the cost basis appropriate to your calculation and be clear about which employment and operating costs it includes.

Does this use local prices or include tax?

No. You supply all costs and rates. The result is before tax, and currency selection changes labels without converting amounts.

Can I save the calculation?

Yes. Once your inputs are complete, download a CSV or use Print / save PDF. Your copy includes the inputs and calculation limits. Refreshing this page clears your entries.