Turn a mixed construction job into a clear, itemised estimate. Download the free worksheet, see a finished example, or build the estimate in our mobile app.

PDF & Excel · No signup for templates · By Daniel

CONTRACTOR ESTIMATEEST-001

Your contracting business

Prepared for: Sample customer

Utility room refreshFlooring and shelving · One room
Site protection2 hours × $60
$120
Floor removal4 hours × $60
$240
Flooring materials132 sq ft × $4
$528
Floor installation8 hours × $60
$480
Shelving supply and fitting2 shelves × $140
$280
Disposal and cleanup1 job × $150
$150
Subtotal Before applicable tax$1,798USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your contractor estimate include?

A renovation estimate should show who is doing each task, what materials are included and where the price depends on a choice still to be made.

Project and revision

Record the customer, address, document date and reference. Keep revisions identifiable when the scope changes.

Work stages

Describe preparation, removal, installation and completion as separate tasks with an observable result.

Materials and selections

Name the selected product and quantity. Label any unresolved selection as an allowance with a stated basis.

Trade responsibilities

Show what you supply, what subcontractors cover and what the customer is providing.

Site assumptions and exclusions

Record access, working hours and existing conditions. List repairs or services that are outside the price.

Price and acceptance

Show the subtotal, applicable tax, validity and proposed payment arrangements. Explain how to approve the work.

From site visit to a clear figure

How to write your contractor estimate in five steps.

  1. Confirm the scope on site

    Walk through each work area with the customer. Record measurements and the finish expected, then separate essential work from optional additions.

  2. Measure each work package

    Use the unit that fits the task: area for flooring, count for fixtures, and person-hours for labour. Check delivery and purchase quantities separately.

  3. Collect material and trade prices

    Use current supplier quotations and the agreed subcontractor scope. Note which prices include installation so you do not add the same labour twice.

  4. Build the selling price

    Add the work stages and recover overhead and profit through your selected rates or a clear separate calculation. Apply your established tax treatment.

  5. Review the complete document

    Check that every inclusion appears in the price. List exclusions, unresolved choices and the process for agreeing changes, then save the issued version.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Contractor estimate, worked through.

This utility room example combines measured flooring, task-based labour and two all-in shelving items. It assumes the subfloor is ready for installation after the old covering is removed.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Utility room refresh with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Site protectionProtect access and adjacent finishes2 hours × $602 hours$60$120
Floor removalRemove existing covering from 120 sq ft4 hours × $604 hours$60$240
Flooring materials120 sq ft plus an illustrative 10% cutting allowance132 sq ft × $4132 sq ft$4$528
Floor installationLay the selected flooring on the assumed sound subfloor8 hours × $608 hours$60$480
Shelving supply and fittingAll-in supply and installation price per shelf2 shelves × $1402 shelves$140$280
Disposal and cleanupOrdinary removed flooring and site tidying1 job × $1501 job$150$150
Subtotal before applicable tax (USD)$1,798

Separate the pricing bases. The shelving price includes its materials and fitting. The flooring materials and installation are separate lines, so shelf labour must not be added again.

Price what you inspect. The 132 sq ft purchase quantity illustrates a 10% allowance on 120 sq ft. Check pack sizes, layout and subfloor condition before setting the actual quantity and price.

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

An allowance with no description

Name the product or work still to be confirmed and state what quantity and amount you have included.

02

Counting subcontracted work twice

If a trade quotation includes supply and installation, do not duplicate those materials in your own takeoff.

03

Missing the small stages

Protection, delivery handling, waste removal and making good can be real work even on a short job.

04

Treating optional work as agreed

Keep optional additions out of the accepted scope until the customer has selected them and you have updated the price.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Contractor estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Can I use this for a renovation with several trades?

Yes. Group the work into clearly named stages and identify the scope supplied by each trade. The Excel file has eight line-item slots; the browser editor lets you add more lines.

Should I show my internal cost or selling price?

Enter the amount you intend to charge. Work out your costs, overhead and profit first, then ensure the document does not add an allowance already included in a selling rate.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5

Your entries stay in this page. Download a copy before closing; refreshing clears them.