Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Turn a mixed construction job into a clear, itemised estimate. Download the free worksheet, see a finished example, or build the estimate in our mobile app.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
A renovation estimate should show who is doing each task, what materials are included and where the price depends on a choice still to be made.
Record the customer, address, document date and reference. Keep revisions identifiable when the scope changes.
Describe preparation, removal, installation and completion as separate tasks with an observable result.
Name the selected product and quantity. Label any unresolved selection as an allowance with a stated basis.
Show what you supply, what subcontractors cover and what the customer is providing.
Record access, working hours and existing conditions. List repairs or services that are outside the price.
Show the subtotal, applicable tax, validity and proposed payment arrangements. Explain how to approve the work.
From site visit to a clear figure
Walk through each work area with the customer. Record measurements and the finish expected, then separate essential work from optional additions.
Use the unit that fits the task: area for flooring, count for fixtures, and person-hours for labour. Check delivery and purchase quantities separately.
Use current supplier quotations and the agreed subcontractor scope. Note which prices include installation so you do not add the same labour twice.
Add the work stages and recover overhead and profit through your selected rates or a clear separate calculation. Apply your established tax treatment.
Check that every inclusion appears in the price. List exclusions, unresolved choices and the process for agreeing changes, then save the issued version.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This utility room example combines measured flooring, task-based labour and two all-in shelving items. It assumes the subfloor is ready for installation after the old covering is removed.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Site protectionProtect access and adjacent finishes2 hours × $60 | 2 hours | $60 | $120 |
| Floor removalRemove existing covering from 120 sq ft4 hours × $60 | 4 hours | $60 | $240 |
| Flooring materials120 sq ft plus an illustrative 10% cutting allowance132 sq ft × $4 | 132 sq ft | $4 | $528 |
| Floor installationLay the selected flooring on the assumed sound subfloor8 hours × $60 | 8 hours | $60 | $480 |
| Shelving supply and fittingAll-in supply and installation price per shelf2 shelves × $140 | 2 shelves | $140 | $280 |
| Disposal and cleanupOrdinary removed flooring and site tidying1 job × $150 | 1 job | $150 | $150 |
| Subtotal before applicable tax (USD) | $1,798 | ||
Separate the pricing bases. The shelving price includes its materials and fitting. The flooring materials and installation are separate lines, so shelf labour must not be added again.
Price what you inspect. The 132 sq ft purchase quantity illustrates a 10% allowance on 120 sq ft. Check pack sizes, layout and subfloor condition before setting the actual quantity and price.
Before you send it
A little clarity here can save a difficult conversation later.
Name the product or work still to be confirmed and state what quantity and amount you have included.
If a trade quotation includes supply and installation, do not duplicate those materials in your own takeoff.
Protection, delivery handling, waste removal and making good can be real work even on a short job.
Keep optional additions out of the accepted scope until the customer has selected them and you have updated the price.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Yes. Group the work into clearly named stages and identify the scope supplied by each trade. The Excel file has eight line-item slots; the browser editor lets you add more lines.
Enter the amount you intend to charge. Work out your costs, overhead and profit first, then ensure the document does not add an allowance already included in a selling rate.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.