How to price electrical jobs in the UK

Build your price from the whole job, including testing, certification and the time around the visit. Follow a worked quote in pounds.

3D electrician planning a UK quotation with socket faceplates, light switches and a clipboard

Before you start

  • Build your rate from costs, overhead and realistic chargeable hours.
  • Price testing, certification and shared visit time with the replacement work.
  • Show the customer a clear total, including VAT where it applies.

To price electrical jobs in the UK, start with your materials and labour costs, allow for overhead, then add your markup. Show the customer a clear price with VAT included where it applies. Below is one small domestic job priced that way, followed by the decisions that change the number.

A worked example: four double sockets and two light switches

The job is to replace four double sockets and two light switches at their existing positions in a home. You're supplying the work directly to the homeowner.

The quote follows an assessment confirming that the existing circuits, back boxes and connections are suitable for the specified replacements. It leaves out new circuits, consumer unit work, rewiring, plastering, decoration and any unpriced fault finding.

You've allowed six person-hours: four for preparation and replacement, one for testing and appropriate certification, and one for collection, travel and cleanup. Adjust those hours for the work you have assessed, including any extra visits.

These are sample prices in GBP, before VAT. Use your own costs for your job.

What does the job cost you?

Start with materials, the cost of your working time and direct job expenses, then add the job’s share of your business overhead.

Cost item Working Cost (£)
Double sockets 4 × 6 24
Light switches 2 × 4 8
Consumables 12
Materials 44
Direct labour 6 hours × 30 180
Travel and parking expenses 16
Disposal fee 4
Direct cost 244
Allocated overhead 60
Cost base 304

The example business is VAT registered, so these material costs exclude recoverable VAT. The £30 hourly direct labour cost includes the cost of your own working time and related employment costs, but excludes overhead and profit. The £60 of overhead is a share of your running costs, which works out at £10 for each of the six hours.

Keep travel in two parts. The one hour allowed for collection, travel and cleanup sits in your labour. The £16 for parking and other cash costs is a separate expense. If you've already counted the same vehicle cost directly on the job, leave it out of your overhead so it isn't charged twice.

How do you turn that cost into your price?

Add your markup. Markup is a percentage added on top of your costs. In this sample it's 25% of the £304 cost base, which is £76. That gives a price of £380 before VAT.

Margin is a different number. It's the share of the final price that is profit. Here £76 out of £380 is 20%, so a 25% markup gives a 20% margin on this cost base. Neither figure is a recommended industry percentage. Check which one you mean before you compare your numbers with anyone else's. Our contractor markup calculator can help you check the sums.

Your customer doesn't need to see your cost lines. Here's the same £380 as the rows you'd put in front of them:

Item Quantity Rate (£) Total (£)
Sockets 4 7.50 30
Switches 2 5.00 10
Consumables 1 15.00 15
Preparation and replacement 4 hours 50 200
Testing and certification 1 hour 50 50
Collection, travel and cleanup 1 hour 50 50
Travel and parking expenses 1 20.00 20
Disposal fee 1 5.00 5
Subtotal before VAT 380

The labour rate of £50 an hour already includes overhead and profit. Add £180 of labour costs to £60 of overhead, divide by six hours to get £40, then add 25%. The other rows are your costs multiplied by 1.25. Don't add another markup on top of the finished rows, or you'll charge for it twice.

Keeping the cost table and the customer table consistent is the fiddly part by hand, because a changed socket price or an extra hour means reworking both. Construction Job Estimator puts materials, labour and other job costs in one estimate, and it pulls real-time material prices from local suppliers, so items like sockets and consumables start from current prices. You can see the quantities, prices and labour behind each figure and adjust them to your own rates and overhead, then check the total before it goes to your customer.

How do you build your own hourly rate?

Work backwards from the hours you can realistically charge, not every hour you work. Quoting, ordering and general paperwork can take hours you do not charge to a particular job. Include job-specific time you do charge, such as the sample’s collection and travel hour, in your billable hours. Divide your yearly overheads by the billable hours you expect to sell, and you get an overhead cost for each hour.

Your direct labour cost includes your own working time. If you price travel time as its own line, don't hide it in the hourly rate as well. The same goes for expenses such as parking.

Use the contractor hourly rate calculator to check what your rate needs to cover. Its result is a selling rate with overhead and your target margin built in. Don't type that figure back in as your direct labour cost and then apply markup again.

How should VAT appear on the quote?

VAT is separate from your markup, even when the numbers look alike. In this sample both happen to be £76, but the markup is part of your price and the VAT is a tax added to it.

The sample business is VAT registered. The work is for a homeowner, and all eight rows are standard-rated, so 20% VAT on £380 is £76. The customer’s total is £456 including VAT. That's a deliberate treatment for this example, not a default for every job. GOV.UK says you must be registered before you charge VAT, and that the standard rate is currently 20%. Its VAT guidance for builders says most work on existing houses and flats is standard-rated, with some exceptions. Check the rate for your actual job.

If you're not VAT registered, you don't add VAT to your quote. You still pay VAT on your own purchases, and you can't reclaim it. Put those VAT-inclusive costs into your cost base.

Our electrical quote template is a quotation worksheet, not a VAT invoice. You enter the VAT rate yourself, and the completed sample shows 20%.

What about testing, certification and the UK nations?

Allow time for the testing and certification appropriate to your work. A separate line, as in the sample, makes that time easy to check. If you include it within a wider labour allowance, make sure those hours are still covered.

Building regulation requirements differ between the UK nations. Before you quote, check what applies to the actual work at the actual address, including any notification and any fees. Confirm the requirements for that job before agreeing the price, rather than assuming one rule applies throughout the UK.

Fixed quote or diagnostic visit?

A defined replacement, like the sample, suits a fixed quote. Once you have assessed the existing installation, you can count the accessories, specify the replacements and agree the price before you start.

A fault suits a diagnostic visit instead. Agree your hourly terms up front and say what the visit covers. Finding a problem doesn't automatically authorise extra work. Tell the customer what you've found, what it would cost to put right and whether they want you to go ahead.

What goes on the quote?

The £456 is only useful if your customer can see what it buys. Put these on the quote:

  • The accessory model and finish, how many, and where they go.
  • Anything the customer is supplying, and whether it suits the job.
  • The existing conditions you have assessed and the limits of the replacement work.
  • When you'll need access, and whether the power will be off at any point.
  • The testing and documentation you'll provide.
  • What you'll do with the removed material, and any disposal fee.
  • The price with any applicable VAT included, how long it stays valid, and when you expect to do the work.
  • Payment terms and how you'll agree any extras.

Put your own numbers into a quote

To start a quote like this from the job itself, describe the work to Construction Job Estimator by voice or text and add photos of the existing sockets and switches. It turns those details into a working estimate, and you can get to a professional quote in minutes. Review it against your assessment and the scope you've agreed before you send it. If your customer accepts, you can convert the estimate into an invoice. You can read more on the electrical estimating app page.

← Back to all guides

Construction Job Estimator

Your next estimate.
Ready in minutes.

Tell us what needs doing. Get real-time material prices from local suppliers, bring your labour and other costs together, and send your customer a professional estimate.

Take the next job from description to estimate.

★★★★★ Used by 10k+ contractors