How to price landscaping jobs: materials, labour and profit
Work through a planting-bed job from shrubs and mulch to crew time, overhead and the price you send your customer.

Before you start
- Measure each part of the job and convert it into the units you buy.
- Price person-hours, delivery and disposal alongside materials.
- Recover overhead and profit once in the selling price you send.
To price a landscaping job, measure the site, convert those measurements into the units you buy, estimate person-hours, add your job costs and overhead, then apply markup. On the sample 20 x 10 ft planting-bed refresh below, that gives a $1,110 cost base and a $1,332 price before tax.
What the sample job covers
You're refreshing an existing rectangular bed that measures 20 x 10 ft, or 200 sq ft. The work is eight customer-approved shrubs, edging around the full 60 ft perimeter, and bulk mulch. The job doesn't include lawn maintenance, paving, irrigation, grading, soil amendments or major root removal.
These are illustrative USD inputs, not market rates. Replace them with your supplier quotes and labour costs. The $30 hourly labour cost includes wages and employer costs; it is not the rate charged to the customer. If you'd rather not look up every material price by hand, Construction Job Estimator can bring in real-time material prices from local suppliers, and you can edit any figure to match your own costs.
| Item | Quantity | Your cost (USD) | Total (USD) |
|---|---|---|---|
| Shrubs | 8 | $25 each | $200 |
| Mulch | 2 cu yd | $45 per cu yd | $90 |
| Edging, fixings included | 60 ft | $2 per ft | $120 |
| Labour | 16 person-hours | $30 per hour | $480 |
| Delivery | 1 | $75 | $75 |
| Disposal fees | 1 | $45 | $45 |
| Direct cost | $1,010 | ||
| Allocated overhead | $100 | ||
| Cost base | $1,110 |
Measure the bed and convert to purchase units
Walk the bed before you price it. Measure the length and width, then measure the perimeter for edging. Check how the truck will reach the bed, because delivery assumes a drop point you can actually get to. Note what's already there, since old mulch or debris changes both your labour and your disposal fees.
Bulk mulch is often sold by the cubic yard, while your bed measurements give you an area. Convert it with the depth you've agreed for this site:
- 200 sq ft x (3 in ÷ 12) = 50 cu ft
- 50 cu ft ÷ 27 = 1.85 cu yd
- Order 2 cu yd, which leaves about 0.148 cu yd of rounding allowance
Three inches is the depth in this example, not a rule for every bed. Agree the depth and product with your customer. If existing mulch will stay, deduct it from what you order. Iowa State University Extension explains this area-and-depth method. Use our mulch calculator to check the volume or bag quantity.
Also record the plant species and container size with your customer. Eight shrubs is a sample plan, not a spacing recommendation, so confirm the count against what the bed needs.
Estimate labour in person-hours
A person-hour is one person working for one hour. Two people working eight hours is 16 person-hours. Add up each person's time on site rather than the clock time of the job.
| Task | Person-hours |
|---|---|
| Bed clearing and preparation | 4 |
| Planting | 4 |
| Edging | 4 |
| Spreading mulch | 2 |
| Unloading and cleanup | 2 |
| Total | 16 |
This split isn't a productivity benchmark or a promised duration. On a real job, add time for loading, extra trips and awkward access. Keep disposal fees as their own cost line. The hours spent hauling debris belong in labour, and the dump or hauling fee belongs under disposal.
Add overhead and markup
Overhead is the cost of running your business that no single job pays directly. This can include insurance, office costs and vehicle costs that you have not already charged to the job. The sample assigns $100 to this project. For your own allowance, divide your overhead budget by realistic billable hours, then apply that hourly amount to the job. Avoid counting costs already included in your labour rate.
Markup is a percentage added on top of your cost. Here it's 20%:
- $1,110 x 20% = $222
- $1,110 + $222 = $1,332
Markup isn't the same as margin. Margin is profit as a share of the price you send. Here, $222 ÷ $1,332 is 16.67%, so a 20% markup gives a 16.67% margin. If you want a true 20% margin, you need a higher markup. The contractor markup calculator can check that for your own numbers.
Build the customer estimate lines
You don't have to show your costs, but each line should add up to the total. In this sample, the labour rate carries the overhead:
($480 direct labour + $100 overhead) ÷ 16 hours x 1.20 = $43.50 per hour
Every other direct cost is multiplied by 1.20.
| Line | Quantity | Rate (USD) | Total (USD) |
|---|---|---|---|
| Shrubs | 8 | $30 each | $240 |
| Mulch | 2 cu yd | $54 per cu yd | $108 |
| Edging | 60 ft | $2.40 per ft | $144 |
| Installation and preparation labour | 16 hours | $43.50 per hour | $696 |
| Delivery | 1 | $90 | $90 |
| Disposal | 1 | $54 | $54 |
| Total before tax | $1,332 |
These rates already recover your overhead and profit, so don't add them again at the bottom. Add applicable tax after checking which lines it applies to.
If you work in Canada, the method is the same, but use real CAD quotes from your suppliers. Don't swap in the USD amounts above.
Check the scope before you send the price
Write down the plant species and container sizes, mulch product, edging type and area included. Add your business and customer details, job address, estimate reference, validity and payment arrangements. Describe any uncertain work as a separate allowance or exclusion so your customer can see what could change the price.
A narrow side gate, a long carry from the drop point or roots found during preparation can change the work. Check access during your site visit and price any known extra handling. If the customer changes the planting list or adds a bed, agree the revised scope and price before doing that work.
Keep installation separate from maintenance
This estimate covers a one-time installation. It doesn't include ongoing maintenance or watering visits. Agree handover care with your customer before the job ends, so they know what to do after you leave. If they want you to return, price that as a separate service.
For a ready-made layout of these lines, download the free PDF or Excel landscaping estimate template.
Turn your own job into a priced estimate
A real bed needs the same pieces you've just worked through: quantities, person-hours, delivery, disposal, overhead and markup on one estimate. In Construction Job Estimator, you describe the job by voice or text and add site photos, and it builds a working estimate with materials, labour and other job costs together. You can see the quantities, prices and labour behind each figure and adjust them, including your own labour cost and overhead, before you send a professional estimate to your customer. It can also create a before-and-after render so your customer can picture the planting plan, and you can convert an accepted estimate into an invoice.