How to Quote Custom Cabinets
Quote custom cabinets from the design, material purchases, shop labor, finishing and installation. See a worked price and what to include in your customer quote.

Before you start
- Agree the cabinet specification before giving a firm quote.
- Price fabrication, bought-in components and installation without overlap.
- Keep overhead and markup separate and count each once.
Write the cabinet schedule first. Then price materials, hardware, shop labor, finishing and delivery or install as separate lines. Add overhead and markup once, and send a quote that matches a specification the customer has approved.
This guide is for quoting design and fabrication, plus delivery and install if you're doing them. If you're only installing cabinets someone else built, use how to price cabinet installation jobs instead. The example further down builds a hypothetical $6,500 quote for a small fitted commission, so you can see where each number comes from.
Settle the cabinet schedule before you price anything
Your price depends on a list of decisions, so get them on paper first:
- Dimensions and run layout
- Carcass material and thickness
- Doors and drawers
- Hardware
- Finish
- End panels and fillers
- Interiors
- Countertops and appliances
Next to every item, write who supplies it. If the customer buys the appliances or the countertop, that changes your fit-up and scribing, and it changes who is responsible if something arrives wrong. An unassigned item can become an unpriced extra.
Be clear about which kind of number you're giving. A budget allowance before design is a rough figure so the customer can decide whether to continue. Label it that way. A firm quote is based on a specification the customer has approved. Mixing the two causes trouble, because a rough number the customer remembers can turn into a price you're held to.
Documenting the design before you build is standard practice in the cabinet trade. AWI's QCP guidance on cabinet shop drawings covers dimensions, construction, materials and finishes, and reviewing and approving them before manufacture. That principle works on a home kitchen job too. It doesn't mean every domestic project needs AWI certification or follows its program requirements. It means the customer signs off on drawings you can build from and price from.
Price materials from a cut list, not from square footage
Square footage of wall tells you little about what you'll buy. Build a cut list from the schedule and turn it into purchasing quantities. For sheet goods, that means laying the parts out with grain direction, offcuts and finish requirements in mind. For solid stock, it means the lengths and thicknesses you'll actually order.
Don't add waste twice. If your layout already shows the offcuts you'll lose, a blanket waste percentage on top pays for the same scrap again. Pick one method and use it. I won't give you a standard percentage, because it changes with the parts, the material and the layout.
Price hardware by the actual model and count. A generic hardware allowance hides real differences. A drawer stack needs more slides than a run of doors, and a tall unit needs more hinges. Then give each of these its own line:
- Bought-in doors and drawer fronts
- Outsourced finishing
- Freight
Each comes from a supplier quote, and each can change on its own.
This is where Construction Job Estimator can help. You describe the job by voice or text, including the measurements you've taken, and it builds a working estimate with real-time material prices from local suppliers. You can see the quantities, pack sizes and prices behind each figure and edit them. If you already have a price for a specific hinge, slide or specialty panel, you can enter it yourself. The cut list and the measurements come from you. The app organizes the costs and gives you a professional quote to send.
Count shop labor by task, and keep drying time out of it
"Shop labor" is too broad to price well. Break it into the tasks that make it up:
- Measuring and design
- Setup and machining
- Edge work
- Assembly
- Finishing prep and handling
- Quality check
When you can see each task, you can see which one you keep underpricing.
Keep person-hours separate from elapsed time. Finish that has to dry or cure affects your calendar and your delivery date, but you aren't working on it the whole time. Price the hands-on finishing work, such as prep, spraying or wiping, and handling between coats. Plan the waiting on the calendar. Whether and how you charge for other kinds of waiting depends on the job, so price what the work involves.
Make sure the labor rate matches how you're using it. In the example below, $40 is the employment cost of one person for one hour. That's a cost input, not a billing rate, so overhead and profit still have to be added. If you work from a shop hourly rate that already contains overhead, don't add shop overhead again.
Keep delivery, install, access and return work on their own lines
Fabrication happens in your shop, where you control the conditions. Delivery, installation, scribing, adjustment and return visits happen in someone else's house. Giving them their own lines lets the customer see what's fabrication and what's on-site work. It also means a change to the install scope doesn't distort your shop number.
On-site work is hard to judge from a drawing. Access, walls that aren't plumb and final door and drawer adjustments all depend on the site. Write down what you've assumed, such as a clear route in, and what the quote doesn't cover.
Also be clear about the difference between an exclusion and an allowance in the quote. An exclusion is an item you haven't priced. An allowance is a stated amount for something not yet chosen, such as a pull the customer hasn't picked. If installation is a big part of your package, the installation pricing guide covers it in more detail.
Add overhead once, then markup, and know the difference from margin
Overhead is the cost of running the shop and business that isn't tied to one job, such as rent, insurance and software. Count it once. You can allocate it as its own line, like the $600 in the example, or you can have it inside your shop hourly rate. Using both charges the customer twice for the same costs.
Markup is a percentage you add on top of your cost. Margin is the share of the final price that is profit. They're different numbers. In the example, your full cost is $5,200 and a 25% markup adds $1,300, so the quote is $6,500. That $1,300 is 20% of the $6,500 price, so the margin is 20%, not 25%. If you want a 25% margin, you need a higher markup than 25%.
The contractor markup calculator will check your numbers if you want to work from a target margin. In Construction Job Estimator you can adjust markup and individual line items as you review the final price.
Example: a small fitted cabinet commission quoted at $6,500
These are hypothetical prices in USD. Use your own costs and hours for your job.
| Line | USD |
|---|---|
| Sheet goods and solid stock | 1,200 |
| Bought-in doors and drawer fronts | 600 |
| Hardware | 450 |
| Finish and consumables | 150 |
| Materials | 2,400 |
| Design and measuring (6 h) | 240 |
| Fabrication and assembly (24 h) | 960 |
| Finishing, active work (10 h) | 400 |
| Delivery and install (10 h) | 400 |
| Labor (50 person-hours at $40) | 2,000 |
| Vehicle and freight | 200 |
| Allocated shop and business overhead | 600 |
| Full cost | 5,200 |
| Markup, 25% of cost | 1,300 |
| Quote before tax | 6,500 |
A few choices keep this honest. The doors are bought in, so the labor covers building carcasses and drawer boxes and fitting the fronts, not making those doors a second time. Finish is a materials line, not outsourced labor, because the shop does the finishing. The $200 for vehicle and freight is a cash cost. The $600 is a share of shop and business costs, and no other overhead is added anywhere else.
Use price per linear foot only as a sanity check
Divide your finished price by the linear feet in the run and compare the result with your own past jobs of a similar specification. If this quote covered a 10-foot run, $6,500 would come to $650 per linear foot. That's an illustration, not a going rate.
The number has limits. Tall units, drawer stacks, hardware-heavy designs, finish and end panels can all move it a lot. Use it to catch an obvious miss, such as a total that looks far too low next to a past job. It can't replace the full schedule and cost build-up.
What to put in the quote before you send it
A custom cabinet quote should name the approved specification and the drawings it's based on. It should also say how many design revisions are included and how finish samples get approved. Then list the allowances and exclusions, the expected delivery timing, the payment terms you've agreed with the customer, and how changes get approved before you do the work.
Finish sample approval and change approval matter more with custom work than with off-the-shelf units. The customer is buying something that doesn't exist yet, and disagreements can come from details nobody wrote down, like a stain that looked different in the showroom or a drawer layout that shifted after sign-off. If deposits or contract wording are regulated where you work, check the local rules.
Your next step is to build the schedule, price each line from your cut list and supplier quotes, and send a quote that matches what the customer approved. When you're ready to turn those costs into a professional estimate or quote, Construction Job Estimator can pull your materials, labor, delivery and other job costs into one estimate you can review and adjust.