Measure the work.
Mixed-size patterns may need a manufacturer’s pack coverage instead of a single piece.
Free paver and base calculator
Enter the area, coverage of one installed paver and the specified layer depths.
Free to use · No signup · By Daniel
Use your own figures or try the example.
Calculated from the figures you enter.
Fill in your measurements or costs to see the result and its breakdown here.
Ready for the whole job?
Keep the scope, materials and labour together in Construction Job Estimator.
Create an estimate in the appKnow what goes into the number.
Divide the area plus waste by coverage per paver and round up. Base and bedding volumes each use the net paved area × specified depth.
Mixed-size patterns may need a manufacturer’s pack coverage instead of a single piece.
Divide the area plus waste by coverage per paver and round up. Base and bedding volumes each use the net paved area × specified depth.
Does not design the pavement or account for loose-to-compacted conversion. Base and bedding depths must suit the specified system. Jointing sand, restraints and excavation are separate.
Worked example
200 sq ft at 0.5 sq ft per paver needs 440 pavers with 10% allowance. A 4 in base is 2.469 cu yd; 1 in bedding is 0.617 cu yd before delivery allowances.
Illustrative inputs. Replace them with the figures for your job.
The example breakdown
Mixed-size patterns may need a manufacturer’s pack coverage instead of a single piece.
Geometric compacted volume is not automatically the loose quantity to order.
Include access, spoil removal, edge restraints, falls and labour in your estimate.
Does not design the pavement or account for loose-to-compacted conversion. Base and bedding depths must suit the specified system. Jointing sand, restraints and excavation are separate.
No. The worked example uses illustrative inputs. Enter current supplier quotes and your own labour and business costs.
Use the measurement units shown beside each field and keep all prices in one currency. Currency selection labels amounts; it does not convert them.
Does not design the pavement or account for loose-to-compacted conversion. Base and bedding depths must suit the specified system. Jointing sand, restraints and excavation are separate.
Yes. Once your inputs are complete, download a CSV or use Print / save PDF. Your copy includes the inputs and calculation limits. Refreshing this page clears your entries.