Free gravel calculator

How much aggregate should you order?

Turn measured area and depth into a purchase allowance, then add your own product price and delivery.

Free to use · No signup · By Daniel

Start with the job details.

Use your own figures or try the example.

Your entries stay in this page. Refreshing clears them.

Your calculation.

Calculated from the figures you enter.

A clear starting point
for the job ahead.

Fill in your measurements or costs to see the result and its breakdown here.

Construction Job Estimator app

Ready for the whole job?

Bring base material, delivery and labour into one estimate.

Keep the scope, materials and labour together in Construction Job Estimator.

Create an estimate in the app

Know what goes into the number.

How the calculation works

Area × depth gives volume. Apply the entered allowance, then multiply by supplier density for weight or divide by bag volume for a bag count.

1

Measure the work.

A compacted layer and a loose delivery can occupy different volumes. Account for that once in your allowance.

2

Apply the calculation.

Area × depth gives volume. Apply the entered allowance, then multiply by supplier density for weight or divide by bag volume for a bag count.

3

Review the result.

Density and allowance are user inputs. Compacted depth and delivered loose volume may differ; confirm the conversion with your supplier. Imperial weight is US short tons, metric weight is tonnes.

Worked example

See the calculation
come together.

240 sq ft at 3 in gives 60 cu ft before allowance. With 10% added, that is 66 cu ft or 2.444 cu yd. Use the supplier’s density or bag volume to finish the order.

Illustrative inputs. Replace them with the figures for your job.

The example breakdown

Material mass
3.667 US tons
Volume including allowance
2.444 cu yd
Material plus delivery
243.33 USD

Check the details before you quote.

Match the volume basis.

A compacted layer and a loose delivery can occupy different volumes. Account for that once in your allowance.

Confirm the material.

Different grading, moisture and products can change density. The example is not a specification.

Separate site work.

Removal, edging, base preparation, machinery and labour are outside the material result.

What the result covers

Density and allowance are user inputs. Compacted depth and delivered loose volume may differ; confirm the conversion with your supplier. Imperial weight is US short tons, metric weight is tonnes.

Common questions

Are the example costs current market prices?

No. The worked example uses illustrative inputs. Enter current supplier quotes and your own labour and business costs.

Can I use this in the USA, Canada or the UK?

Use the measurement units shown beside each field and keep all prices in one currency. Currency selection labels amounts; it does not convert them.

What is outside this calculation?

Density and allowance are user inputs. Compacted depth and delivered loose volume may differ; confirm the conversion with your supplier. Imperial weight is US short tons, metric weight is tonnes.

Can I save the calculation?

Yes. Once your inputs are complete, download a CSV or use Print / save PDF. Your copy includes the inputs and calculation limits. Refreshing this page clears your entries.