Measure the work.
If drawings state clear cover to the bar surface, add half the bar diameter before using this field.
Free rebar quantity calculator
Use the slab dimensions, designed spacing, cover and lap length to estimate a rectangular reinforcing grid.
Free to use · No signup · By Daniel
Use your own figures or try the example.
Calculated from the figures you enter.
Fill in your measurements or costs to see the result and its breakdown here.
Ready for the whole job?
Keep the scope, materials and labour together in Construction Job Estimator.
Create an estimate in the appKnow what goes into the number.
Subtract cover at both ends. Across each direction, round clear span ÷ spacing up and add one bar. Split long runs into stock bars allowing for each lap, then apply waste.
If drawings state clear cover to the bar surface, add half the bar diameter before using this field.
Subtract cover at both ends. Across each direction, round clear span ÷ spacing up and add one bar. Split long runs into stock bars allowing for each lap, then apply waste.
Quantity only. Spacing, cover, bar size, development and lap lengths must come from the project design. No offcut reuse is assumed; chairs, ties, bends and reinforcement weight are separate.
Worked example
For a 20 × 10 ft slab with 2 in centreline cover and 12 in spacing, the grid has 11 long runs and 21 cross runs. At 20 ft stock lengths each run fits one bar; 10% waste gives 36 bars.
Illustrative inputs. Replace them with the figures for your job.
The example breakdown
If drawings state clear cover to the bar surface, add half the bar diameter before using this field.
Use this combined count only when the mats have the same spacing and geometry.
Conservative stock counts may reduce after a reviewed cutting schedule. Do not shorten specified laps to save bars.
Quantity only. Spacing, cover, bar size, development and lap lengths must come from the project design. No offcut reuse is assumed; chairs, ties, bends and reinforcement weight are separate.
No. The worked example uses illustrative inputs. Enter current supplier quotes and your own labour and business costs.
Use the measurement units shown beside each field and keep all prices in one currency. Currency selection labels amounts; it does not convert them.
Quantity only. Spacing, cover, bar size, development and lap lengths must come from the project design. No offcut reuse is assumed; chairs, ties, bends and reinforcement weight are separate.
Yes. Once your inputs are complete, download a CSV or use Print / save PDF. Your copy includes the inputs and calculation limits. Refreshing this page clears your entries.