Download a free blank bathroom remodel estimate, or copy a completed one. Both come as PDFs, and the Excel version calculates totals from your quantities and rates. The sample is in USD, so enter your own local costs. Your customer gets a scope they can follow line by line.

PDF & Excel · No signup for templates · By Daniel

BATHROOM REMODEL ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Bathroom refresh — layout retained40 sq ft floor · 120 sq ft tiled walls
Protection and removal1 job × $1,200
$1,200
Fixture fitting package1 package × $1,200
$1,200
Electrical work package1 package × $650
$650
Backing and waterproofing1 package × $1,200
$1,200
Tile supply18 boxes × $40
$720
Tile installation160 sq ft × $12
$1,920
Painting and finish details1 package × $700
$700
Disposal and final clean1 job × $350
$350
Subtotal Before applicable tax$7,940USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your bathroom remodel estimate include?

A bathroom job mixes removal, trade work, materials and finishes. Give each a clear line, with quantities and selling rates where they apply. Include your scope, customer-supplied items and exclusions. The sample selling prices already include overhead and profit; calculate any applicable tax separately.

Scope sentence

Start with one or two sentences on what stays and what changes. In the sample, fixtures go back in existing positions and finishes are replaced. This gives your customer clear boundaries before they read a single price, and it gives you something to point to if the job drifts.

Removal kept apart from disposal

Price protection and removal as one line and disposal and final clean as another. The sample's removal line covers labor, and the disposal line covers haul fees and cleaning. Splitting them keeps you from counting the same work twice and shows the customer where each dollar goes.

Owner-supplied items by name

List each item the customer supplies: tub, vanity, basin, toilet, taps, fan and light in the sample. Then price only your fitting package, including connections and testing. Naming each item prevents the argument about who was buying the toilet.

Trade packages with their assumptions

Show electrical work as its own package and state what you assumed. The sample says a qualified trade replaces the fan and light using assessed existing connections and duct route. If the assumption turns out wrong, your estimate already says what was priced.

Materials, bought and installed

Show the quantity you buy and the quantity you install, and say which one each line prices. Then note what the labor rate covers. In the sample, installation includes adhesive, grout and edge trims but excludes tile and backing.

Exclusions and the before-tax note

Name what's not included: structural work, concealed damage, service relocation, new circuits or duct routes, shower glazing and permit fees. Keeping the layout doesn't guarantee that no permits or upgrades are needed. Confirm who handles approvals before the customer accepts.

From site visit to a clear figure

How to write your bathroom remodel estimate in five steps.

  1. Download the template and open the example

    Get the blank PDF to print and fill in, or the Excel file if you want totals calculated from your quantities and rates. Keep the completed example open beside it. Seeing a finished page first makes it easier to decide which lines your own bathroom needs.

  2. Write the scope and exclusions first

    Before you price anything, write what you're doing and what you're not. These two blocks decide which lines belong on the page. If the customer supplies fixtures, or the walls might hide damage, say so now and not after the job starts.

  3. Fill in each line with your own costs

    Enter quantity, unit and rate for every line, using your own supplier prices and labor costs. Build your overhead and profit into the price once. Don't add a second markup at the bottom. The sample figures only show the layout and aren't rates to copy.

  4. Enter material quantities both ways

    For tile and similar materials, record what you buy and what you install, and say which one each line prices. Your allowance depends on the job, the tile and the layout. The 12.5% in the sample is only an example of how to show the gap.

  5. Check the subtotal and send it

    Check the subtotal, complete the applicable tax treatment and read the estimate once the way your customer would. If you'd rather not build this by hand, Construction Job Estimator lets you describe the job by voice or text with your measurements. It brings materials, labor, delivery, equipment hire and disposal into one estimate. You can adjust quantities, rates and markup, then send a professional estimate. Download Construction Job Estimator.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Bathroom remodel estimate, worked through.

This sample is a bathroom refresh with the layout retained: 40 sq ft of floor tile, 120 sq ft of tiled walls, and fixtures going back in their existing positions. The customer supplies the tub, vanity, basin, toilet, taps, fan and light. That means the $7,940 subtotal is not a full supply-and-install budget. These are sample prices in USD, so use your own costs.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Bathroom refresh — layout retained with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and removalProtect access; remove old fixtures and agreed finishes; load waste.1 job × $1,2001 job$1,200$1,200
Fixture fitting packageFit owner-supplied tub, vanity, basin, toilet and taps in existing positions; connections and testing included.1 package × $1,2001 package$1,200$1,200
Electrical work packageQualified trade replaces owner-supplied fan and light using assessed existing connections and duct route.1 package × $6501 package$650$650
Backing and waterproofingSpecified substrate and waterproofing system; materials and installation included.1 package × $1,2001 package$1,200$1,200
Tile supply10 sq ft per box: 180 sq ft purchased for 160 sq ft installed.18 boxes × $4018 boxes$40$720
Tile installationLabor, adhesive, grout and edge trims included; excludes tile and backing/waterproofing above.160 sq ft × $12160 sq ft$12$1,920
Painting and finish detailsPaint ceiling and untiled walls; refit retained accessories; labor and consumables included.1 package × $7001 package$700$700
Disposal and final cleanWaste haul and disposal fees, final cleaning and handover; removal labor is above.1 job × $3501 job$350$350
Subtotal before applicable tax (USD)$7,940

Bought tile versus installed tile You buy 18 boxes at 10 sq ft each, which is 180 sq ft. You install 160 sq ft: 40 on the floor and 120 on the walls. The 20 sq ft difference is 12.5% of the installed area. That is an illustrative allowance, not a rule for your jobs. Tile supply is 18 × $40 = $720, and installation is 160 × $12 = $1,920.

Waterproofing has its own line The $1,200 backing and waterproofing package covers the specified substrate and waterproofing system. In wet areas, tile alone does not provide the waterproofing. The tile installation package excludes this work and tile supply, so those costs are not counted twice.

The subtotal is before tax The $7,940 subtotal is before applicable tax, and the sample assumes no tax rate. Each package is a selling price with overhead and profit already included. Don't add extra labor or a blanket markup on top, or you'll charge for the same thing twice.

Read the remodeling estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Leaving waterproofing out

A tiled wet area needs the appropriate waterproofing scope as well as tile and installation. Name the selected system and who supplies and installs it. Leaving that work unpriced can mean absorbing the cost later or revising the estimate with your customer.

02

Mixing owner-supplied fixtures into the total

If the customer buys the tub, vanity and toilet, those items don't belong in your subtotal. List them by name as customer-supplied and price only your fitting. Otherwise the total reads like a full budget, and the customer may expect you to cover fixture problems.

03

Buying the installed square footage

Installed area is the tile on the wall and floor, but the order has to cover what you'll actually buy. In the sample, 160 sq ft is installed and 180 sq ft is bought. Order only the installed amount and you may come up short.

04

Writing vague exclusions

A line like 'extra work extra' invites disputes. Name concealed damage, service relocation, new circuits or duct routes, shower glazing and permit fees. A retained layout doesn't mean no permits or upgrades are needed, so confirm approval responsibilities in writing before the customer accepts.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Bathroom remodel estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Should I use the PDF or the Excel version?

Use the PDF if you want a page to print and fill in or a finished example to read. Use the Excel version if you want totals to calculate from your quantities and rates. Both follow the same layout, so you can read the PDF example and then build your own in Excel.

How do I handle owner-supplied fixtures?

Name each one in the scope and exclusions, then price only your fitting package. In the sample, the fitting line covers connections and testing, while the fixtures themselves stay out of the total. That keeps the number honest about what you're supplying.

Do I show tax on the estimate?

Show your subtotal as before applicable tax. The sample assumes no tax rate, and you shouldn't copy one from it. Follow your local rules for adding a tax line, and keep that line separate from your priced work so the customer can see both.

Can I use this for a full gut remodel?

Treat the sample as a refresh with the layout retained, because that's what it prices. A gut remodel will need different lines, such as relocated services or structural work, which the sample excludes. The remodeling estimate template and tile calculator on this site can help with the rest.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7
Line 8

Your entries stay in this page. Download a copy before closing; refreshing clears them.