Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a bathroom tile installation estimate template as a blank PDF to print, a completed PDF, or an editable Excel file. The sample prices 40 sq ft of floor and 120 sq ft of shower walls at 4,232 USD before applicable tax.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Download a blank PDF to print and fill in, a completed example PDF, or an Excel workbook with formulas and eight editable line rows. Add your business and customer details, describe the scope and exclusions, then enter descriptions, quantities, units and rates. The separate browser editor on this page is another way to prepare your estimate.
Write the floor and shower-wall areas in square feet and state the backing condition you're pricing over. Name what's included: substrate preparation, waterproofing system, tile, setting materials, grout and trims. Your customer should see exactly what the price covers.
List what isn't in the price: demolition, plumbing, fixtures, base replacement, structural repairs, major leveling and concealed damage. If any of these are your work on this job, price them as their own rows.
Confirm the selected system, junctions, penetrations and compatibility with a retained shower base before you price. Choose backing and waterproofing details suited to the tile assembly. No single prescription fits every assembly.
Figure floor and wall tile separately, apply your planning allowance to each, then round up to whole boxes. The sample uses 10% and 10 sq ft boxes. Use your own waste figure and pack size.
Split installation labor by area, as the sample does at 12 per sq ft on the floor and 14 on the walls. Keep grouting, finish joints and cleanup in their own row if your setting rate leaves them out.
Build overhead and profit into your rates once. Don't add another markup on the subtotal. Put applicable tax on its own line after the subtotal so the customer sees both figures.
From site visit to a clear figure
Replace the sample scope and exclusions text first, because it defines what every number means. Describe your areas, backing, retained or replaced base, and anything you're leaving out.
Enter your floor and wall areas, then your tile box counts. Change units where needed. Rows can be sq ft, boxes or packages, so each line matches how you buy or price the work.
Enter your customer selling rate for each unit. For hourly work, use hours as the unit, person-hours as the quantity and your hourly rate as the rate. Include overhead and profit once; do not add another markup to a finished selling price.
The sample waterproofing package includes its own labor and materials, so the tile installation rows don't repeat it. Group related items to fit the Excel template's eight rows, or split a package if your job calls for it.
Add applicable tax below the subtotal. Print the blank PDF to fill in on site, or edit the Excel file so the formulas total the rows. Keep the scope and exclusions on the same page as the price.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
The sample tiles 40 sq ft of floor and 120 sq ft of shower walls on prepared, assessed backing. It includes the specified substrate preparation and waterproofing system, tile, setting materials, grout and trims. The existing shower base stays.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Substrate and waterproofing packageSpecified preparation, waterproofing materials and labor for agreed areas and junctions.1 package × $850 | 1 package | $850 | $850 |
| Floor tileTen sq ft per box: 50 sq ft bought for 40 sq ft floor.5 boxes × $42 | 5 boxes | $42 | $210 |
| Wall tileTen sq ft per box: 140 sq ft bought for 120 sq ft walls.14 boxes × $38 | 14 boxes | $38 | $532 |
| Setting and grout materialsSpecified compatible adhesives and grout; no waterproofing double count.1 package × $165 | 1 package | $165 | $165 |
| Trims and sealing materialsScheduled edge trim and compatible finish-joint materials.1 package × $95 | 1 package | $95 | $95 |
| Floor tile installationFloor fitting labor; grout/finish labor separate.40 sq ft × $12 | 40 sq ft | $12 | $480 |
| Wall tile installationWall fitting labor; grout/finish labor separate.120 sq ft × $14 | 120 sq ft | $14 | $1,680 |
| Grouting and handoverGrouting, finish joints and cleanup labor; materials above.1 package × $220 | 1 package | $220 | $220 |
| Subtotal before applicable tax (USD) | $4,232 | ||
Sample prices, your costs These are illustrative customer selling prices in USD, with overhead and profit included once. Use your own costs and rates for a real job. Add applicable tax as a separate line after the 4,232 USD subtotal.
What the subtotal leaves out The sample excludes demolition, plumbing, fixtures, shower-base replacement, structural repairs, major leveling and concealed damage. It's a tile job, not a full bathroom remodel, and the exclusions are written on the estimate.
Why 190 sq ft is bought Floor tile is 5 boxes (50 sq ft) and wall tile is 14 boxes (140 sq ft), against 160 sq ft installed. That leaves 30 sq ft extra, or 18.75% of installed area, because each area rounds up to whole boxes.
Before you send it
A little clarity here can save a difficult conversation later.
If the price covers tile but your customer expects demolition, plumbing or a new base, the gap shows up later. Put the exclusions on the estimate in plain words, right next to the scope.
Corners, floor-to-wall joints and penetrations can slip out of a package description. Check them, and the compatibility of a retained shower base, before you price. Then write down what the package covers.
An all-in waterproofing package already includes its labor. Adding it again in the tile rows inflates the price. The same goes for markup: if your rates already carry overhead and profit, leave the subtotal alone.
A 10% allowance isn't the whole story once each area rounds up to whole boxes. The sample works out to 18.75% extra overall. Check your actual box counts before you tell the customer how much extra is on site.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
The example subtotal is before applicable tax. In the Excel workbook or browser editor, mark the taxable lines and enter the rate that applies to your job. Check the resulting tax and final total before sending.
Yes. Excel has eight editable line rows with formulas. The separate browser editor on this page lets you add more lines when the job needs them. Keep each package clear about its materials and labor.
Not necessarily. The sample prices it as one package, with its own labor and materials, because it was scoped that way. If your job needs separate lines for junctions or penetrations, split it, and keep labor out of the other rows.
If you'd rather not rebuild an estimate each time, Construction Job Estimator lets you describe the job by voice or text, add your measurements and site photos, and review supplier material prices, labor and other costs in one estimate. You still check the scope and figures.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.