A clear price. A professional first impression.

Free drywall estimate templateMake the next job
look this good.

Make board supply, hanging and finishing easy to understand. Download the free drywall template, review a completed example, or build your next estimate in the app.

PDF & Excel · No signup for templates · By Daniel

DRYWALL ESTIMATEEST-001

Your drywall business

Prepared for: Sample customer

Small room wall lining320 sq ft of walls · Single board layer
Drywall board supply11 sheets × $18
$198
Joint treatment materials1 lot × $85
$85
Board installation8 hours × $55
$440
Joint finishing and sanding12 hours × $55
$660
Access and protection1 job × $90
$90
Waste and cleanup1 job × $100
$100
Subtotal Before applicable tax$1,573USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your drywall estimate include?

A drywall estimate should name the surfaces, board specification and finish, then show the materials and labour needed to deliver them.

Rooms and measured surfaces

List wall and ceiling areas separately. Identify openings and the number of board layers.

Board specification

Record sheet size, type and thickness selected for the work. Do not leave performance requirements implicit.

Installation scope

State who supplies framing, fixings and access equipment and what condition you expect the substrate to be in.

Finishing requirement

Describe the agreed joint treatment and finished surface. Clarify whether decoration is included.

Protection and waste

Price floor protection, dust management, offcut handling and cleanup for the actual site.

Price and exclusions

Show materials, labour, tax and excluded work. Record the schedule assumptions for multiple visits.

From site visit to a clear figure

How to write your drywall estimate in five steps.

  1. Inspect the substrate and surfaces

    Check measurements and whether framing or repairs are outside the agreed scope. Record access restrictions and ceiling work separately.

  2. Check board quantities

    Choose the specified sheet dimensions and layer count, then review an actual cutting layout before setting the purchase quantity.

  3. Separate hanging and finishing

    Allow person-hours for installation, joint treatment and sanding. Plan visits around the selected products and site conditions.

  4. Add supporting job costs

    Include fixings, finishing materials, delivery, protection and disposal. Make sure all-in rates do not duplicate separate labour lines.

  5. Confirm the finish and exclusions

    Review the expected finished surface with the customer. State whether painting and any specialist assemblies are included before issuing the estimate.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Drywall estimate, worked through.

This example lines 320 sq ft of wall surface with one board layer. It uses eleven 4 × 8 ft sheets as an illustrative purchase quantity, with installation and joint finishing priced separately.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Small room wall lining with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Drywall board supply4 x 8 ft sheets; illustrative purchase allowance11 sheets × $1811 sheets$18$198
Joint treatment materialsCompound, tape and agreed finishing supplies1 lot × $851 lot$85$85
Board installationHang and fix the specified wall boards8 hours × $558 hours$55$440
Joint finishing and sandingWorking time across required finishing visits12 hours × $5512 hours$55$660
Access and protectionProtect floors and keep access clear1 job × $901 job$90$90
Waste and cleanupOffcut disposal and final tidying1 job × $1001 job$100$100
Subtotal before applicable tax (USD)$1,573

Check the cutting layout. Ten sheets have 320 sq ft of nominal area; the example buys eleven. That extra sheet is an allowance, not a guarantee that every opening, joint and offcut will fit.

Separate work from drying. The example includes 20 person-hours of installation and finishing. Drying intervals affect visits and programme; they are not automatically continuous labour hours.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Using floor area as wall area

Measure the surfaces being lined instead of applying a room floor measurement to the wall quantity.

02

Treating an area count as a cutting plan

Check openings, sheet orientation and joints. An area-based allowance alone does not optimise the order.

03

Leaving the finish unspecified

The customer and installer need the same understanding of the surface that will be handed over.

04

Forgetting repeat visits

Allow for setup and cleanup over the working visits without charging drying time as continuous labour.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Drywall estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Does the example include painting?

No. It includes board supply, installation and joint finishing only. Add decoration as a clearly described scope if it is part of your job.

Can I use this for ceilings too?

Yes, but use separate lines for ceiling measurements, board specification, access and handling. Replace the wall-only example with the quantities and working method for your job.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6

Your entries stay in this page. Download a copy before closing; refreshing clears them.