Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a blank printable PDF, a completed PDF sample and a formula-based Excel file for a rotten exterior trim replacement estimate. The sample, EST-001, fits 48 linear ft, buys 56 linear ft and totals 1546 USD before applicable tax.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Print the blank PDF and fill it in by hand, open the completed EST-001 PDF to see a finished customer estimate, or use the Excel file when you want formulas. The Excel template has eight editable rows and editable descriptions, and the browser editor lets you rename or change lines for your own job. Every file has fields for reference, business, customer, scope, exclusions and line items.
Say which trim you're replacing and where. EST-001 covers identified exterior wood trim at accessible, inspected locations, with sound surrounding components kept. If you haven't inspected a location, don't put it in the scope. Add it later once you've seen it.
Record the linear feet you'll actually fit, and keep that number apart from what you'll buy. In the sample, 48 linear ft is the fitted amount. Removal pricing and fitting person-hours both come from that figure, so measure it before you price.
The sample adds a 10 percent planning allowance: 48 × 1.10 = 52.8 ft. Divided by 8 ft lengths, that's 6.6, so 7 lengths, or 56 ft. The allowance is specific to this sample. Use your own allowance and your own stock lengths.
The fitting allowance is eight person-hours for 48 ft of installed trim. The 56 ft purchase allows for cuts and whole stock lengths. Estimate handling and fitting effort from the actual job rather than scaling hours automatically from purchased length.
Name structural timber, sheathing, concealed decay, roof repairs and unresolved water-entry repairs if they're outside your scope. Say plainly that the moisture source needs to be established and addressed separately, so the estimate isn't read as a fix for hidden damage.
Check for protection, access setup, equipment hire, cleanup and disposal, and give each its own line if it applies. Then note that applicable tax is added separately. The subtotal in EST-001 is 1546 before tax.
From site visit to a clear figure
Before you enter any numbers, put the scope and exclusions in writing. Describe the trim, the locations and what's retained, then list what the price doesn't cover. Numbers are easier to defend when the customer has already read what they apply to.
Put in the linear feet you measured. Then apply your own allowance and stock length to get the purchase quantity. The sample goes from 48 ft fitted to 52.8 ft planned to 7 eight-foot lengths, which is 56 ft. Your numbers will differ.
Price setup and fitting in person-hours, and removal by the linear ft. Keep finish and cleanup as single package lines. If a package already includes its labor, don't add that labor again on another row. Hours should show person-hours worked, not how long the job runs.
Add the rows and confirm the subtotal includes overhead and profit once, with tax shown separately. If you'd rather not build every line by hand, Construction Job Estimator lets you describe the job by voice or text, including your measurements, and add site photos. It puts materials, labor, equipment hire and disposal in one estimate you can adjust, then send. It's on iOS and Android at $19.99 a month. You still do the site assessment.
State how you will agree extra work and its price if concealed damage extends the scope. Edit the scope notes and eight priced rows in Excel. The separate browser editor supports additional line items when needed.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
EST-001 replaces 48 linear ft of identified exterior wood trim at accessible, inspected locations. It supplies compatible stock, fits, prepares and finishes it, and keeps sound surrounding components. These are sample selling prices in USD, with overhead and profit counted once. Use your own costs for your job and add applicable tax separately.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and access setupProtect surroundings and set up agreed access; equipment hire below.2 hours × $65 | 2 hours | $65 | $130 |
| Damaged trim removalRemove identified trim and handle waste; no assumed sheathing repair.48 linear ft × $1.50 | 48 linear ft | $1.50 | $72 |
| Replacement trim materialsSeven 8 ft lengths=56 linear ft of selected stock.7 lengths × $32 | 7 lengths | $32 | $224 |
| Fixings and sealing materialsCompatible fixings, sealants and preparation materials.1 package × $60 | 1 package | $60 | $60 |
| Trim fitting laborCut and fit 48 linear ft to inspected details.8 hours × $65 | 8 hours | $65 | $520 |
| Preparation and finish packageSpecified finish materials and labor for replacement trim.1 package × $310 | 1 package | $310 | $310 |
| Access equipment hireAgreed equipment hire; setup labor separately listed.1 job × $150 | 1 job | $150 | $150 |
| Cleanup and disposalFinal cleanup and disposal fees; no repeat removal labor.1 job × $80 | 1 job | $80 | $80 |
| Subtotal before applicable tax (USD) | $1,546 | ||
What the $1,546 subtotal covers The example includes removal, selected replacement stock, fitting, finishing, access and disposal. Its two hourly rows cover 10 person-hours, while removal and finishing carry labor in their own prices. All figures are illustrative selling prices with overhead and profit included once.
Units show what drives each price Removal is priced per linear ft and setup in person-hours, so your customer can see why each figure is what it is. Equipment hire sits on its own line, apart from setup labor. Cleanup and disposal fees are separate from removal, so nobody is charged for the same work twice.
Exclusions sit beside the total The sample excludes structural timber, sheathing, concealed decay, roof repairs and unresolved water-entry repairs. New trim isn't a repair to hidden damage. The moisture source has to be established and addressed separately. Keeping this on the same page as the subtotal stops the customer from assuming it's covered.
Before you send it
A little clarity here can save a difficult conversation later.
The sample buys 56 ft and fits 48 ft. Its labor allowance is based on the inspected installation, including the work needed to cut and fit the trim. More stock purchased does not automatically mean the same increase in fitting time.
Replacing or finishing trim isn't a repair to rot, leaks or structural problems behind it. If the estimate reads that way, the customer may expect it. Say the moisture source must be established and addressed separately.
The sample's amounts are selling prices with overhead and profit already included once. Applying another markup to the package lines inflates the total and makes your own numbers hard to follow. Decide where margin lives and count it one time.
If these aren't on the page, your customer can assume they're included. In EST-001, equipment hire is 150 and cleanup and disposal is 80, and the exclusions sit beside the total. Show each one so the price matches what you plan to do.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
No. It's an illustrative selling price for the EST-001 scope only. Replace every quantity, rate and package with your own costs and prices, and use the footage you measured. Your total will follow your scope, not this sample.
It applies a 10 percent planning allowance, which gives 52.8 ft, then rounds up to 7 eight-foot lengths. That's a sample-specific choice. Use your own allowance and stock lengths, and keep labor tied to the fitted footage.
Stop and tell the customer. Agree the extra work and its price before you continue. The sample excludes concealed decay, structural timber and sheathing, so any of those would be added work, not part of the subtotal.
Tax isn't included. Add applicable tax separately to the subtotal. The Excel template has eight editable rows and editable descriptions, and the browser editor lets you customize rows and descriptions for your own job.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.