A clear price. A professional first impression.

Free carpentry
estimate templateMake the next job
look this good.

Download a free carpentry estimate template in PDF or Excel. Start with a blank copy, or use the completed two-door example to see how your materials, fitting time and price come together.

PDF & Excel · No signup for templates · By Daniel

CARPENTRY ESTIMATEEST-001

Your carpentry business

Prepared for: Sample customer

Two interior doors and new trimTwo doors · Casing on four faces
Interior door slabs2 doors × $156.25
$312.50
Handle and latch sets2 sets × $56.25
$112.50
Hinge sets2 sets × $22.50
$45
Casing / architrave5 lengths × $40
$200
Fixings, sealer and protection1 lot × $75
$75
Carpentry labour16 hours × $56.25
$900
Job vehicle cost1 job × $22.50
$22.50
Haul and disposal1 job × $45
$45
Subtotal Before applicable tax$1,712.50USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your carpentry estimate include?

Give your customer a clear picture of what you will supply, fit and finish. Keep the agreed scope beside the price so a change of door, trim or finish is easy to spot.

Customer, site and revision

Add your business details, the customer, job address, estimate date and reference. When the scope or price changes, issue a new revision so your customer knows which version to approve.

Selected doors, trim and hardware

Name the door slabs, hinge sets, handles, latches and casing profile you are pricing. A slab is the door panel without a new frame. Casing, also called architrave, is the trim around the opening. Say who supplies each item.

Work and finish

List the removal, fitting, filling, cut-edge sealing and cleanup you include. Agree who does the final painting and when, following the chosen door manufacturer’s instructions.

Quantities and stock lengths

Show the counts and lengths you will buy, not just the finished footage. Check the actual cuts against available stock lengths before putting a material quantity into the estimate.

Site assumptions and exclusions

If the existing frames stay, inspect their condition and compatibility first. State whether frame replacement, wall repairs, decorating or further visits are outside your price.

Total and agreed terms

Show the subtotal, applicable tax and total. Add price validity, payment terms, schedule assumptions and a place for acceptance. Make the scope changes that need a revised price clear.

From site visit to a clear figure

How to write your carpentry estimate in five steps.

  1. Inspect and define the job

    Check each opening, the retained frames, access and the finish you will hand over. Write down the selected products and exclusions before you start pricing.

  2. Count the pieces you will buy

    List each trim piece and its cut length, then fit the pieces onto stock lengths. Allow for mitres, saw cuts and defects. Price the full lengths you need to purchase.

  3. Plan all your working time

    Include measuring, collection, protection, removal, fitting, prep, cleanup and coordination. Count person-hours: two people working four hours use eight person-hours. Keep the same time out of other cost lines.

  4. Enter your selling rates

    Build overhead and profit into your rates before entering them. Excel calculates each line, the subtotal, tax on marked lines and the total. Choosing USD, CAD or GBP changes the label; it does not convert prices. Work out your markup and selling price.

  5. Review and send

    Check the quantities, hours, total and scope together. Print the blank PDF to fill in by hand, use Excel, or open the browser editor below. Add your terms and review the version you send to your customer.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Carpentry estimate, worked through.

This sample prices two interior door slabs in sound, compatible existing frames, with new hardware and casing on both faces of both openings. The total is $1,712.50 before applicable tax. These are illustrative USD selling rates, not current supplier quotes or recommended charges.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Two interior doors and new trim with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Interior door slabsSelected non-fire-rated slabs; retain frames2 doors × $156.252 doors$156.25$312.50
Handle and latch setsCompatible hardware for both doors2 sets × $56.252 sets$56.25$112.50
Hinge setsOne selected set per door2 sets × $22.502 sets$22.50$45
Casing / architrave16 ft stock; trim both faces of both openings5 lengths × $405 lengths$40$200
Fixings, sealer and protectionIncludes filler and protective materials1 lot × $751 lot$75$75
Carpentry labourMeasuring, collection, prep, fitting and cleanup16 hours × $56.2516 hours$56.25$900
Job vehicle costVehicle cost; collection time in labour1 job × $22.501 job$22.50$22.50
Haul and disposalFee only; handling time in labour1 job × $451 job$45$45
Subtotal before applicable tax (USD)$1,712.50

The selling rates already include markup. The guide’s sample has $1,370 of direct costs. A 25% markup adds $342.50 for overhead and profit, giving $1,712.50. Each rate above includes that markup. Do not add it again. Zero tax is only the example setting; check which lines need tax for your own job.

Check the cuts and the hours. Eight rough legs at 84 inches and four heads at 42 inches need 70 feet of pieces. The sample buys five 16-foot lengths: four each yield two legs, and the fifth yields four heads, leaving room for saw cuts. Check your actual cuts, profile and stock condition. The 16 person-hours include collection, prep, fitting, cleanup and coordination; the vehicle and disposal lines exclude that labour.

Read the carpentry pricing guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Entering costs without markup

The template has no automatic markup calculation. Use selling rates that cover your costs, overhead and profit. If your rates already include markup, do not add it again.

02

Missing time away from the saw

Material collection, protecting floors, cleanup and customer coordination still take time. Include them in your labour allowance, whether you show one combined row or separate tasks.

03

Pricing only the fitted footage

You buy full lengths. Seventy feet of finished pieces may need eighty feet of stock, depending on the cuts. Check the cutting layout instead of relying on the total length alone.

04

Leaving the finish unclear

“Ready for paint” can mean different things to different customers. Describe the filling, preparation and sealing you include, and agree who completes the final finish and when.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Carpentry estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Can I use this for trim, baseboards and door jobs?

Yes. Replace the sample rows with your own materials and tasks for the job. For cabinet work, include the separate fitting, fillers and hardware it needs rather than reusing the door quantities.

Does it work for supply and fit or labour only?

Both. For labour-only work, remove material supply lines you are not charging for. Still allow time to check customer-supplied items, and say who is responsible for missing or unsuitable parts.

Does the carpentry template calculate markup?

No. It multiplies each quantity by your selling rate. Work out the rate you need before entering it. The completed example already includes a 25% markup in every rate; that is a sample assumption, not an industry standard.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7
Line 8

Your entries stay in this page. Download a copy before closing; refreshing clears them.