How to price carpentry jobs without missing site time

Build your price from the whole job, including measuring, collection and cleanup. Follow a door-and-trim example and see how to charge for your time.

3D carpenter checking an interior doorway with a timber trim sample and tape measure

Before you start

  • Define what you supply, fit and finish before putting a price on the work.
  • Check stock lengths against the cuts and count time beyond installation.
  • Separate your job costs from the price you charge, including overhead and profit.

To price a carpentry job, define the finish and scope, measure and plan your materials, count every hour you'll spend, add site costs, then add markup for overhead and profit. Send the price with the scope written beside it. The example below walks through that method on a two-door job with sample numbers.

Agree the scope before you price

Before choosing a price, agree where your work starts and ends. Settle these points first:

  • Supply-and-fit or labor-only. Who buys the doors, hardware and trim?
  • Slab or prehung. A slab is just the door. A prehung door comes with its frame and attached hinges, so you're pricing frame work too.
  • New frame or retained frame. If you keep the existing frame, check that it's sound and suitable for the new door’s fitting requirements.
  • Product and profile. Pin down the exact door, the hardware and the trim profile.
  • Hardware and floor. Note any hinge or latch changes, floor levels and clearance.
  • Finish. Decide who paints, and who seals cut edges.
  • Site. Think about access, occupied rooms, and who removes the waste.

If the customer supplies the goods, you still need to check that the size, hardware preparation and condition suit the opening.

Check the maker's instructions for the door you're fitting. One example is JELD-WEN's interior slab sheet, which covers trimming, fitting and finishing requirements for that product. Your door may differ, so don't carry one door's limits over to another.

For trim, price from the longest cuts and the stock lengths you can buy, not just the total installed length.

The example below covers ordinary non-fire-rated interior doors. Price fire-rated door work against its specific requirements separately.

Worked example: two internal doors and new trim

The job. Replace two ordinary internal door slabs in sound, compatible existing frames. You supply new hinges and handle/latch sets. You replace casing on both faces of both openings, fill nail holes and joints for the painter, and seal cut edges as specified. You haul away the old doors and trim and clean up.

The customer's painter does the finish painting. That painter needs to follow the chosen door maker's finish requirements, and the timing should be arranged before you start. If the finishing sequence needs another visit, include that time in your cost plan before quoting.

Left out: frame replacement, structural work, wall repairs, final decoration and rated door work. The price assumes you've inspected the site and the frames and access suit the work.

These are sample prices in USD, before applicable tax. Use your own costs and rates for your job.

Trim takeoff

Each opening has two faces, so you have four trimmed faces. Each face takes two legs and one head, which makes 8 legs and 4 heads.

Say your checked rough-cut lengths are 84 in for legs and 42 in for heads. That leaves room to trim the final mitres from the rough blanks.

  • 8 legs × 7 ft = 56 ft
  • 4 heads × 3.5 ft = 14 ft
  • Total rough pieces = 70 ft

Dividing 70 by 16 can hide a bad cut layout, so check how the pieces fit. Buy five 16 ft lengths: 80 ft at $32 each, or $160. Four lengths each give you two 7 ft legs, using 14 ft and leaving about 2 ft less saw kerfs. The fifth length gives you all four 3.5 ft heads, also 14 ft. Every length has room for its cuts.

Confirm the real opening sizes, the profile and any defects in the stock before you order. Those 70 ft are rough pieces for cutting, rather than the finished length of trim around the openings. For help with packs and supplier costs, see pricing material quantities for an estimate.

The $32 per length is a sample, and trim prices move. On a real job, Construction Job Estimator can bring real-time material prices from local suppliers, including shops you already use, into your estimate. You can edit any figure, and you still check the cut layout against your own measurements, as above.

Your own hours

Count every person-hour on the job, not only the time with a tool in your hand. Person-hours are the hours each worker spends, which isn't the same as elapsed days on the calendar.

Task Person-hours
Measuring and specification 1
Collecting materials 1.5
Protection and removal 1.5
Machining and hanging two doors, plus hardware 5
Cutting and fitting casings 3
Filling, prep and cut-edge sealing 2
Cleanup and handover 1
Job coordination 1
Total 16

Include any workshop preparation as well as site fitting. The five-hour line above includes machining; if you split that work between the workshop and site, keep the same hours from appearing twice.

The $45 an hour in this example is a labor cost rate, meaning what an hour of your time costs the business. It includes employment costs but leaves out company overhead and profit. Replace it with your own cost rate. If you work alone, your own pay still belongs in it.

Elapsed time works differently. If paint or sealer needs drying time and you aren't working, that's elapsed time, not automatically labor. Travel for a return visit adds time. So does waiting on site if you must keep someone there. Allow for the time the business actually has to cover.

Cost table

Item Calculation Amount (USD)
Door slabs 2 × $125 250
Handle/latch sets 2 × $45 90
Hinges 2 sets × $18 36
Casings 5 × $32 160
Fixings, filler, cut-edge sealer 44
Protective materials 16
Labor 16 h × $45 720
Job vehicle cost 18
Haul and disposal fee 36
Direct job costs 1,370
Markup at 25% $1,370 × 0.25 342.50
Price to customer, before tax 1,712.50

A few lines need care. The $18 vehicle cost doesn't include the time you spend collecting materials, because that's already in the labor hours. The $36 haul fee doesn't include the time you spend carrying waste out on site, for the same reason. The $16 of protection material is separate from the time you spend laying it.

The 25% markup is added on top of your job costs to cover company overhead and profit. It isn't net profit, and it isn't a 25% margin. Gross margin is the share left after direct job costs, before company overhead. Here $342.50 out of $1,712.50 is 20%, a gross margin before overhead. The 25% is a sample figure, not an industry norm.

If you already charge a labor rate that includes overhead and profit, don't add them again with this markup. You can test your own figures in the contractor markup calculator.

How much should you charge to hang a door?

The $1,712.50 above isn't a standalone door-hanging price. It covers two doors, new trim, materials and other work. Dividing it by two would give a price per supplied-and-fitted doorway, including the trim. It would not give a labor-only hanging rate.

For a smaller job, here's a separate sample. The customer supplies a compatible door and hardware. The frame is sound, and there's no casing, decorating, frame repair or haul-away. You plan 4 person-hours in total for the visit, protection, fitting, adjustment and cleanup.

  • Labor: 4 h × $45 = $180
  • Job vehicle and consumables: $18
  • Direct costs: $198
  • Markup at 25%: $49.50
  • Price, before tax: $247.50

Use your own task times for the four-hour allowance; awkward access or extra fitting will change it. Before you fix this price, confirm who is responsible for the finish and check the supplied goods against the opening. A door that arrives the wrong size changes the job.

How long does it take to hang an internal door?

In the main example, the 5 hours for machining, fitting and hardware on two doors works out to 2.5 hours per door for the fitting part. The whole job is still 16 hours because it includes trim, prep, cleanup and other tasks.

Your plan can change with existing hinge positions, how much the door needs trimming, floor clearance, frame condition, hardware and workspace. Shared setup also means the time doesn't scale in a straight line from one door to three.

Daily capacity follows from your own plan. Take an 8-hour day and set aside 2 hours for other job tasks, which leaves 6. At 2.5 hours each, two fully fitted doors take 5 hours, with 1 hour spare. A third door would need 7.5 hours of fitting before any other task, so it doesn't fit under these assumptions.

Use that calculation to test your schedule, rather than treating two doors as a daily quota. The full 16-person-hour job above still needs time for its additional work.

How much should a self-employed carpenter charge per day?

Build a day rate from a budget, not from a number you heard on site. The formula:

(annual owner pay budget + annual business overhead) ÷ realistic billable days, then add your profit.

Here's a separate sample in USD. It isn't a national day rate.

  • Owner pay budget: $54,000
  • Business overhead: $18,000
  • Total: $72,000
  • Billable days: 160
  • Cost coverage per day: $72,000 ÷ 160 = $450

For this illustration, choose a 20% margin after those budgeted costs. Divide by 0.80 to allow for it:

$450 ÷ (1 − 0.20) = $562.50 per day, before tax.

Your owner pay budget should include the employment-equivalent costs your business needs, which you can set up with your accountant. Your billable days aren't all the weekdays in the year. Allow for holidays, admin, quoting, training and gaps between jobs. In this budget, materials and other direct job costs are outside the annual overhead. Price those separately and check that each cost appears once.

This $562.50 already includes overhead and profit. Don't put the 25% markup from the main example on top of it.

Use the rate to build a fixed price when you can inspect and define the work. For repairs you can’t fully scope yet, agree an hourly or daily basis, what it includes and when you’ll review the cost with the customer.

What to put on the customer's quote

Use the free carpentry estimate template to put your price into a customer document. It includes a blank PDF, an Excel workbook and the completed two-door example above, with markup already included in the selling rates.

Your quote should show clear products and quantities, which frames you're retaining, who handles the finish, removal and disposal, and what's excluded. Add the price and tax, how long the price is valid, your payment terms and schedule, and a line saying you'll agree changes before doing extra work. A fixed-price document needs the scope, the total and the assumptions. Keep internal rates on your worksheet unless your agreement calls for that breakdown.

Here's a scope sentence for the example job that you can adapt:

Supply and fit two new internal door slabs in existing frames with new hinges and handle/latch sets; replace casing on both faces of both openings; fill and prepare for painting and seal cut edges as specified; remove and dispose of old doors and trim. Excludes frame replacement, wall repairs, painting and fire-rated door work. Painting by others, following the door manufacturer's finish requirements.

For a longer finished document, see this construction estimate example. To count the hours behind your own labor line, use how to estimate labor costs in construction.

If assembling a quote like this for every enquiry slows you down, Construction Job Estimator is built to get you to a professional estimate or quote in minutes. Describe the job by voice or text, add site photos, and review the quantities, prices and labor behind each figure before you send it. Materials, labor and other job costs sit in the same estimate, and when the customer accepts you can convert it into an invoice. See how it fits carpentry estimates.

← Back to all guides

Construction Job Estimator

Your next estimate.
Ready in minutes.

Tell us what needs doing. Get real-time material prices from local suppliers, bring your labour and other costs together, and send your customer a professional estimate.

Take the next job from description to estimate.

★★★★★ Used by 10k+ contractors