Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Give your customer a clear flooring breakdown. Start with the free PDF or Excel file, review the worked example and adapt the scope to the job.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
A flooring price is easier to review when the measured work, selected products and responsibilities are stated together.
Record the measured condition, selected specification and who supplies or completes this part of the work.
Record the measured condition, selected specification and who supplies or completes this part of the work.
Record the measured condition, selected specification and who supplies or completes this part of the work.
Use the purchasing unit for materials and a clearly stated basis for labour. Show what any all-in package includes.
Major subfloor repairs, moisture remediation, hazardous material removal and furniture storage are excluded.
Include customer and site, reference, date, validity, currency, applicable tax treatment and the agreed payment and acceptance process.
From site visit to a clear figure
Remove the existing covering, prepare the assumed sound substrate and install the selected flooring, underlay and transitions.
200 sq ft room · Selected floating floor. Use the project measurements rather than the example quantities. Check deductions and purchase rounding.
Installed area and purchase coverage; Subfloor condition and product compatibility; Transitions, thresholds and trim responsibility. Obtain supplier or subcontractor quotes for the selected scope.
Calculate materials and labour without overlap. Recover overhead and profit through your selling rates, then apply the applicable tax treatment.
Check the scope, exclusions, validity and schedule with the customer. Save the accepted version and record any later change separately.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
Remove the existing covering, prepare the assumed sound substrate and install the selected flooring, underlay and transitions.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Existing floor removalRemove the agreed covering200 sq ft × $1 | 200 sq ft | $1 | $200 |
| Flooring packs20 sq ft per pack; 220 sq ft purchased11 packs × $65 | 11 packs | $65 | $715 |
| Underlay and transitionsCompatible system and doorway transitions1 lot × $160 | 1 lot | $160 | $160 |
| Substrate preparationMinor preparation only4 hours × $55 | 4 hours | $55 | $220 |
| Floor installationLabour on installed area, not waste quantity200 sq ft × $3 | 200 sq ft | $3 | $600 |
| Disposal and cleanupOrdinary removed covering1 job × $130 | 1 job | $130 | $130 |
| Subtotal before applicable tax (USD) | $2,025 | ||
Read the scope. Major subfloor repairs, moisture remediation, hazardous material removal and furniture storage are excluded.
Keep cost and selling price separate. The example uses illustrative selling rates. Replace them with prices that recover the costs and overhead of your business without adding the same allowance twice.
Before you send it
A little clarity here can save a difficult conversation later.
Keep the installed area separate from the material quantity purchased for cuts and spares.
Check this explicitly during the flooring walkthrough. State what is included, what is excluded and which unresolved detail could change the price.
Check this explicitly during the flooring walkthrough. State what is included, what is excluded and which unresolved detail could change the price.
Check this explicitly during the flooring walkthrough. State what is included, what is excluded and which unresolved detail could change the price.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Installed area and purchase coverage, Subfloor condition and product compatibility, Transitions, thresholds and trim responsibility. The prewritten line items give you a starting structure; edit them to match your scope.
Yes. Replace descriptions, quantities, units and prices in Excel, or use the browser editor. Keep one task per line when its pricing basis differs.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.