Get a blank gutter replacement estimate to print and fill in, a completed sample PDF, or an Excel file you can edit. The sample covers a single-story job with 80 linear ft of gutter and 20 linear ft of downspout. Amounts are sample selling prices in USD; use your own costs and measurements.

PDF & Excel · No signup for templates · By Daniel

GUTTER REPLACEMENT ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Single-story gutter and downspout replacement80 linear ft gutters · 20 linear ft downspouts
Old system removal80 linear ft × $1.25
$100
Gutter materials80 linear ft × $4
$320
Downspout materials20 linear ft × $3
$60
Fittings and supports1 package × $145
$145
Access equipment allowance1 allowance × $180
$180
Installation labor10 hours × $65
$650
Check and cleanup2 hours × $65
$130
Waste disposal fees1 job × $75
$75
Subtotal Before applicable tax$1,660USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your gutter replacement estimate include?

A gutter estimate has to tell your customer what you're replacing, where the water connects, what's priced and what isn't. The Excel file has eight rows, matching the sample, with editable descriptions. The browser editor helps you customize the document. Add tax separately, only where it applies.

Measured runs, kept separate from downspouts

Write down each gutter run you measured and each downspout length as separate quantities. In the sample, 80 ft of gutter and 20 ft of downspout are priced on different lines, so neither purchase quantity gets inflated by the other.

The selected gutter system

Name the system you're pricing before you list fittings. Your outlets, elbows, end caps, unions and supports must follow that system. The sample's 145 fittings package only makes sense for its chosen system, so don't copy it as is.

Access method and cost

Decide how you'll reach the eaves and what that costs. If you can't confirm it yet, show it as a provisional allowance, like the 180 line in the sample. Explain what still needs confirming and how you will agree any change to that amount.

Removal and disposal, listed apart

Keep old-system removal, including loading, apart from the waste disposal fee. The sample shows removal at 100 and the disposal fee at 75. Separate lines let your customer see what each covers.

Discharge points, sizing and drainage

Confirm that the discharge points are existing and agreed. Check system sizing and drainage requirements for the property itself. A sample quantity can't answer these for you. Our gutter calculator can help with measured quantities.

Written exclusions and tax

List what you're not pricing: fascia or roof repairs, underground drainage, new soakaways, gutter guards and hydraulic redesign. Add applicable tax after the subtotal, as its own figure, so the scope and the total both stay clear.

From site visit to a clear figure

How to write your gutter replacement estimate.

  1. Pick your format

    Print the blank PDF if you want to fill it in by hand. Open the Excel file if you want to edit the eight rows and descriptions. The completed PDF is there to show how the sample reads once it's finished.

  2. Replace the job details

    Swap in your own business name, customer, reference and scope sentence. Rewrite the exclusions to match what you are actually leaving out. Keep the scope specific about which eaves and runs you're replacing and where the water connects.

  3. Enter your measurements and rates

    Put your measured quantities in the quantity column. Enter your own selling-price rates, with overhead and profit counted once inside each rate. In Excel, the line totals and subtotal recalculate from those entries.

  4. Match fittings and access to the site

    Write the fittings package for the system you chose, and describe what's in it. Set the access line to the method you've confirmed, or label it a provisional allowance. Rows can be reworded or repurposed where your job needs different items.

  5. Check the total and send it

    Review the subtotal, then add applicable tax separately. If you'd rather build the estimate from your own job details, Construction Job Estimator lets you describe the job by voice or text with your measurements, adjust quantities, rates, labor time and markup line by line, and send a professional estimate or quote. You can convert it to an invoice later. It runs on iOS and Android at 19.99 USD per month.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked gutter replacement estimate example.

This sample replaces two straight 40 ft gutter runs and two 10 ft downspouts at single-story eaves. It includes the selected system, scheduled fittings, an access allowance and connection to existing agreed discharge points. The subtotal is 1,660 USD before applicable tax.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Single-story gutter and downspout replacement with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Old system removalRemove 80 ft gutters and associated two downspouts; loading included.80 linear ft × $1.2580 linear ft$1.25$100
Gutter materialsSelected gutter sections for two straight runs.80 linear ft × $480 linear ft$4$320
Downspout materialsTwo 10 ft downspouts; elbows and fittings below.20 linear ft × $320 linear ft$3$60
Fittings and supportsScheduled outlets, elbows, end caps, unions and supports; quantities specified for chosen system.1 package × $1451 package$145$145
Access equipment allowanceProvisional equipment hire; confirm access method and cost.1 allowance × $1801 allowance$180$180
Installation laborFit specified system and connect agreed discharge points.10 hours × $6510 hours$65$650
Check and cleanupCheck joints/discharge and clean the work area.2 hours × $652 hours$65$130
Waste disposal feesOrdinary waste fee; removal/loading already included.1 job × $751 job$75$75
Subtotal before applicable tax (USD)$1,660

Downspouts are priced on their own line The 20 ft of downspout is its own line at 3 per ft, which gives 60. It isn't added to the 80 ft of gutter purchased. Gutter is 80 x 4 = 320, and removal is 80 x 1.25 = 100.

Rates already include overhead and profit These are illustrative selling prices, so don't add markup on top. Labor is person-hours at an hourly rate: 10 hours x 65 = 650 for installation, and 2 hours x 65 = 130 for check and cleanup. The sample makes no promise about how long the job takes on site.

The access line is provisional, not a rule The 180 access equipment allowance is part of this sample's 1,660 subtotal. Confirm the access method and cost on every real job. Fittings (145) and disposal (75) complete the total. The sample quantities don't prove the drainage is adequate.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Adding downspout length to the gutter quantity

If you buy 80 ft of gutter and 20 ft of downspout, those are two quantities. Adding them gives 100 ft of gutter and overstates the gutter line. Keep each run and downspout in its own row.

02

Using a fittings package that doesn't fit the system

Outlets, elbows, end caps, unions and supports depend on the system you picked. A package copied from another job can leave gaps or extras. Write the package after you've chosen the system.

03

Leaving access vague

If the access method or cost isn't confirmed, don't bury it in labor. Label it as a provisional allowance and check it on the real job. That keeps your customer and your numbers honest.

04

Marking up twice or blurring scope

Selling-price rates already carry overhead and profit, so adding markup again inflates the price. Don't count labor twice when a package already includes it. Leave out the exclusions and fascia, roof repair, soakaways and guards can turn into arguments later.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Gutter replacement estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Are the sample prices what I should charge?

No. They're illustrative selling prices in USD. Replace every rate with your own costs, overhead and profit, and every quantity with your own measurements. The sample shows how the estimate is built, not what a gutter job should cost.

Why are labor and cleanup both priced at 65 an hour?

Both lines are person-hours priced at an hourly rate: 10 hours for installation and 2 hours for check and cleanup. They're separate lines so the work stays visible. The sample doesn't promise how long the job will take on site.

Does the 1,660 subtotal include tax or prove the drainage works?

No to both. Tax is added separately where it applies. The sample quantities don't show the drainage is adequate, so confirm system sizing, access and discharge requirements for the property before you send your estimate.

Can I change the rows in the Excel file?

Yes. Edit the eight priced rows and the scope notes in Excel. Use the separate browser editor if you need more line items. Check the subtotal and any applicable tax after making your changes.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7
Line 8

Your entries stay in this page. Download a copy before closing; refreshing clears them.