Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a free handyman estimate template in PDF or Excel. Give your customer a clear price for the tasks, materials and time your visit includes.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Keep the task list, your selling rates and the limits of the visit together, so your customer can see what the price covers.
Ask your customer to send the task list and a few photos before you attend. You can then check the tasks, spot a missing part and decide whether the visit is realistic before you price it.
Describe the finished task: which shelves you will fit, which latch you will replace and what you will adjust on the door. Name the parts and finishes your customer has approved.
Note which items you buy and which the customer provides. Confirm that a replacement part is compatible and that products will be ready on arrival. A customer-supplied item removes your purchase cost, but you still need time to check it and fit it.
Think about parking, carrying distance, rooms involved and any trip to collect materials. These all feed the shared setup row, so look at them before you set the hours.
List the work the price doesn't cover, such as wall or frame repairs, painting, extra visits, and electrical or plumbing work. Only price work you're qualified and allowed to do.
Agree that anything new gets a confirmed price, or hourly approval, before you start it. A quick favour on the day can change the scope, so decide how you'll handle it before you arrive.
From site visit to a clear figure
Write each task as its own line, with the finish you intend. Confirm the scope and parts before you set a fixed price. If you need to investigate first, agree what that visit covers.
Estimate the hours for each task, then add one shared row for collection, travel, setup and cleanup. Price materials from your supplier costs. In the sample, that's five hours and $100 of materials.
Start with what the work costs you: your labour cost, including your own working time, plus a fair share of overhead such as rent and insurance. Then add your markup. Use your own numbers, in your own currency (USD or CAD), not someone else's rates. Check your markup and selling price.
Put your selling rates into the template and look at the subtotal. The sample comes to $437.50 before any tax that applies. Check that the total still covers your costs, overhead and the profit you want.
Confirm fixed or hourly terms, any time allowance and when you will ask for approval for extra work. Check applicable tax, add your business and customer details, then save the version your customer approves.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This sample prices two shelves, a latch replacement and a door adjustment at $437.50 before applicable tax. It allows five person-hours, including shared visit time. These are sample prices in USD; use your own costs for your job.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Selected shelvesApproved size and finish2 shelves × $30 | 2 shelves | $30 | $60 |
| Brackets and fixingsSelected for the assessed wall and shelf specification1 lot × $25 | 1 lot | $25 | $25 |
| Compatible interior latchRetain existing handles and door1 latch × $27.50 | 1 latch | $27.50 | $27.50 |
| ConsumablesSupplies for the agreed tasks1 lot × $12.50 | 1 lot | $12.50 | $12.50 |
| Shelf fittingFit both shelves at agreed positions2 hours × $62.50 | 2 hours | $62.50 | $125 |
| Latch replacementReplace the specified latch1 hour × $62.50 | 1 hour | $62.50 | $62.50 |
| Second-door adjustmentAdjust at existing hinges; no frame repair1 hour × $62.50 | 1 hour | $62.50 | $62.50 |
| Collection, travel, setup and cleanupShared time counted once for the visit1 hour × $62.50 | 1 hour | $62.50 | $62.50 |
| Subtotal before applicable tax (USD) | $437.50 | ||
Enter selling rates, not costs. Your costs: $100 of materials, plus 5 labour hours at $40, which is $200. That makes $300 of direct costs. The $50 of overhead is spread across the 5 labour hours, which is $10 an hour. The selling prices are $125 for materials ($100 × 1.25) and $62.50 an hour for labour (($40 + $10) × 1.25). Five hours at $62.50 is $312.50, so the total price is $437.50. Overhead is recovered through the labour rate only. The 25% markup is already in these selling prices, so the template doesn't add it again.
Count shared visit time once. Allow two hours for shelves, one for the latch, one for the door adjustment and one for collection, travel, setup and cleanup. These five person-hours include off-site work; they are not a promise to spend five hours at the customer’s home.
Before you send it
A little clarity here can save a difficult conversation later.
If your rows already carry overhead and profit, a percentage added at the bottom charges for them again. Decide where markup goes and keep it in one place.
Count the shared trip and setup once across the visit. You can show it on one row or allocate it across tasks, but the same hour should not appear in each task’s costs.
If you cannot assess a repair yet, arrange to investigate or state a clear limit on the work included. Explain when you will stop and agree the price of further work.
Use your minimum visit charge as a price floor, based on your costs and agreed before booking. Do not simply add it to a price that already covers the same attendance time.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Go fixed when you've seen the work, confirmed the parts and can name what's excluded. Go hourly, with an agreed time allowance and a point where you check in, when the list could change or you can't see what's behind a surface. Whichever you pick, put it in writing before you start.
Agree the extra task, finish and price, or hourly terms, before starting it. Include any extra materials, time or return visit it needs. Avoid counting setup already covered by the original list again.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.