A clear price. A professional first impression.

Free roofing estimate templateMake the next job
look this good.

Give your customer a clear price for the roof you have measured. Download the free PDF or Excel template, see a completed roofing estimate and make the scope and figures your own.

PDF & Excel · No signup for templates · By Daniel

ROOFING ESTIMATEEST-001

Your roofing business

Prepared for: Sample customer

Small outbuilding re-roof600 sq ft sloped roof area · One existing layer
Tear-off and disposal6 squares × $90
$540
Shingle materials20 bundles × $45
$900
Underlayment and accessories1 lot × $280
$280
Installation labor16 hours × $60
$960
Access and protection1 job × $180
$180
Cleanup and handover2 hours × $60
$120
Subtotal Before applicable tax$2,980USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your roofing estimate include?

Show what comes off, what goes back on and what your price covers. These details help your customer compare the work and help you avoid unpriced extras.

Roof area and existing covering

Record whether the area is measured on the slope, the number of existing layers and what you could inspect of the deck. Include the roof planes, edges, ridges, valleys and penetrations that affect your quantities.

Products and accessories

Name the shingle range and color, underlayment and accessory specification. State a clear product allowance if a selection is still open, and explain how a different choice affects the price.

Removal, access and disposal

Show the covering to be removed, how waste leaves the site, and what access equipment and protection your price includes. Check delivery and loading space before pricing.

Deck condition and excluded work

Say what you assumed about the deck and list any repairs, gutters or ventilation changes outside the price. Explain how hidden damage will be assessed, priced and approved.

Customer details and price

Add your business and customer details, site address, reference, date, currency, subtotal and applicable tax. Use selling rates that already recover overhead and profit.

Timing, payment and changes

State the quote validity, proposed start window, payment arrangements and how changes are approved. Discuss weather and access constraints before promising dates.

From site visit to a clear figure

How to write your roofing estimate in five steps.

  1. Confirm what the roof area figure means

    Check whether your number is the horizontal footprint or the area already measured along the slope. The sample uses 600 sq ft of sloped area with overhangs included. If you measured footprint, apply your pitch factor once. If you measured on the slope, don't apply it again. Check the roof pitch calculation

  2. Turn area into squares and bundles

    A roofing square is 100 sq ft, so 600 sq ft is 6 squares for tear-off and disposal. For shingles, add your waste allowance first. The sample uses 10%, so 600 becomes 660 sq ft. Then divide by the coverage on your chosen product's label, assumed here at 33.3 sq ft per bundle. That gives 19.82, which rounds up to 20 bundles. Both the 10% and the 33.3 are example inputs, so use your own allowance and the real label. Calculate roof area and material quantities

  3. Price accessories from the roof spec

    Starter and ridge pieces are not in the 20 field bundles. In the sample they sit in the accessory lot with underlayment, edge details, flashing and fasteners. That lot suits this simple job only. Build yours from your roof spec or supplier quote, and measure ridges, edges, valleys and penetrations separately. Round pack purchases up to whole packs.

  4. Estimate person-hours, not elapsed days

    Estimate person-hours for each stage: two people working eight hours contribute 16 person-hours. This example includes removal time in the tear-off package, then prices 16 installation hours and two cleanup hours separately. Allow for the working time, return visits and equipment costs in your actual weather plan.

  5. Fix the scope and send it

    Add your exclusions, the customer's product choices, access details, tax, validity, timing, payment terms and change approval. Check each line against the measured work. Then send the quote with the subtotal and tax shown clearly.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Roofing estimate, worked through.

This small detached outbuilding has a simple gable roof: 600 sq ft already measured along the slope, including overhangs, with no valleys or penetrations. The example removes one covering and assumes a sound deck, subject to inspection. The selling prices below include overhead and profit.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Small outbuilding re-roof with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Tear-off and disposalOne layer; removal labor, loading, haulage and disposal fees6 squares × $906 squares$90$540
Shingle materials600 sq ft + 10% allowance; example coverage 33.3 sq ft/bundle, rounded up20 bundles × $4520 bundles$45$900
Underlayment and accessoriesUnderlayment, starter/ridge material, flashing and fasteners; supply only1 lot × $2801 lot$280$280
Installation labor16 person-hours for covering and accessory installation16 hours × $6016 hours$60$960
Access and protectionAgreed access arrangement1 job × $1801 job$180$180
Cleanup and handoverFinal site tidying and handover; disposal already included above2 hours × $602 hours$60$120
Subtotal before applicable tax (USD)$2,980

Every line is a selling price These are selling rates, with overhead and profit included. The tear-off row covers removal labor, loading, haulage and disposal fees. Keep those costs out of installation and final cleanup, and avoid adding markup a second time.

Check the accessory package. The 20 bundles are field shingles only. The accessory lot separately includes underlayment, starter and ridge material, edge details, flashing and fasteners for this simple roof. Build your own list from the specification and supplier quote.

Hidden damage needs its own agreement Listing hidden damage as an exclusion doesn't mean you'll absorb it, and it isn't permission to carry on when you find it. If damage turns up, assess it, price it separately and get your customer's agreement before any extra work starts. Put that approval step in the customer document so it's agreed before the job begins.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Applying the pitch factor twice

If the 600 sq ft already follows the slope, multiplying by pitch again inflates every quantity that depends on area. Note on the quote which type of measurement you used so you can check it later.

02

Charging disposal twice

Tear-off and disposal in the sample already includes removal labor and the loading, haulage and disposal fees. A separate dump fee or removal labor row on top would double count. If you want to show disposal separately on a real job, split that row so each cost appears once.

03

Marking up a selling price again

The sample rates already include overhead and profit. If you start with supplier costs or direct labor costs instead, calculate your selling rates first. Recover each allowance once.

04

Treating the example quantities as universal

The 33.3 sq ft per bundle, the 10% allowance and the accessory lot belong to this one sample roof. A different product has a different label, and a roof with valleys or penetrations needs more accessory material. Pull your quantities from the actual spec and supplier quote.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Roofing estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

How does the sample get to 20 bundles?

It adds a 10% allowance to 600 sq ft, which makes 660 sq ft. It divides that by an assumed 33.3 sq ft of coverage per bundle and rounds 19.82 up to 20. Starter and ridge material is counted in the accessory lot, not in those bundles. Change the allowance and coverage to match your product and roof.

What if the deck is damaged?

The sample assumes a sound deck, pending inspection. If you find damage, price the repair as its own line and get your customer's agreement before you do the work. Don't fold it into the original price unless you've already agreed that scope.

Can I use it for repairs or metal roofs?

Yes. Replace the shingle rows with the materials, installation and accessories needed for your repair or metal-roof scope. The example quantities and prices are specific to this shingle job.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6

Your entries stay in this page. Download a copy before closing; refreshing clears them.