Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Give your customer a clear price for the roof you have measured. Download the free PDF or Excel template, see a completed roofing estimate and make the scope and figures your own.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Show what comes off, what goes back on and what your price covers. These details help your customer compare the work and help you avoid unpriced extras.
Record whether the area is measured on the slope, the number of existing layers and what you could inspect of the deck. Include the roof planes, edges, ridges, valleys and penetrations that affect your quantities.
Name the shingle range and color, underlayment and accessory specification. State a clear product allowance if a selection is still open, and explain how a different choice affects the price.
Show the covering to be removed, how waste leaves the site, and what access equipment and protection your price includes. Check delivery and loading space before pricing.
Say what you assumed about the deck and list any repairs, gutters or ventilation changes outside the price. Explain how hidden damage will be assessed, priced and approved.
Add your business and customer details, site address, reference, date, currency, subtotal and applicable tax. Use selling rates that already recover overhead and profit.
State the quote validity, proposed start window, payment arrangements and how changes are approved. Discuss weather and access constraints before promising dates.
From site visit to a clear figure
Check whether your number is the horizontal footprint or the area already measured along the slope. The sample uses 600 sq ft of sloped area with overhangs included. If you measured footprint, apply your pitch factor once. If you measured on the slope, don't apply it again. Check the roof pitch calculation
A roofing square is 100 sq ft, so 600 sq ft is 6 squares for tear-off and disposal. For shingles, add your waste allowance first. The sample uses 10%, so 600 becomes 660 sq ft. Then divide by the coverage on your chosen product's label, assumed here at 33.3 sq ft per bundle. That gives 19.82, which rounds up to 20 bundles. Both the 10% and the 33.3 are example inputs, so use your own allowance and the real label. Calculate roof area and material quantities
Starter and ridge pieces are not in the 20 field bundles. In the sample they sit in the accessory lot with underlayment, edge details, flashing and fasteners. That lot suits this simple job only. Build yours from your roof spec or supplier quote, and measure ridges, edges, valleys and penetrations separately. Round pack purchases up to whole packs.
Estimate person-hours for each stage: two people working eight hours contribute 16 person-hours. This example includes removal time in the tear-off package, then prices 16 installation hours and two cleanup hours separately. Allow for the working time, return visits and equipment costs in your actual weather plan.
Add your exclusions, the customer's product choices, access details, tax, validity, timing, payment terms and change approval. Check each line against the measured work. Then send the quote with the subtotal and tax shown clearly.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This small detached outbuilding has a simple gable roof: 600 sq ft already measured along the slope, including overhangs, with no valleys or penetrations. The example removes one covering and assumes a sound deck, subject to inspection. The selling prices below include overhead and profit.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Tear-off and disposalOne layer; removal labor, loading, haulage and disposal fees6 squares × $90 | 6 squares | $90 | $540 |
| Shingle materials600 sq ft + 10% allowance; example coverage 33.3 sq ft/bundle, rounded up20 bundles × $45 | 20 bundles | $45 | $900 |
| Underlayment and accessoriesUnderlayment, starter/ridge material, flashing and fasteners; supply only1 lot × $280 | 1 lot | $280 | $280 |
| Installation labor16 person-hours for covering and accessory installation16 hours × $60 | 16 hours | $60 | $960 |
| Access and protectionAgreed access arrangement1 job × $180 | 1 job | $180 | $180 |
| Cleanup and handoverFinal site tidying and handover; disposal already included above2 hours × $60 | 2 hours | $60 | $120 |
| Subtotal before applicable tax (USD) | $2,980 | ||
Every line is a selling price These are selling rates, with overhead and profit included. The tear-off row covers removal labor, loading, haulage and disposal fees. Keep those costs out of installation and final cleanup, and avoid adding markup a second time.
Check the accessory package. The 20 bundles are field shingles only. The accessory lot separately includes underlayment, starter and ridge material, edge details, flashing and fasteners for this simple roof. Build your own list from the specification and supplier quote.
Hidden damage needs its own agreement Listing hidden damage as an exclusion doesn't mean you'll absorb it, and it isn't permission to carry on when you find it. If damage turns up, assess it, price it separately and get your customer's agreement before any extra work starts. Put that approval step in the customer document so it's agreed before the job begins.
Before you send it
A little clarity here can save a difficult conversation later.
If the 600 sq ft already follows the slope, multiplying by pitch again inflates every quantity that depends on area. Note on the quote which type of measurement you used so you can check it later.
Tear-off and disposal in the sample already includes removal labor and the loading, haulage and disposal fees. A separate dump fee or removal labor row on top would double count. If you want to show disposal separately on a real job, split that row so each cost appears once.
The sample rates already include overhead and profit. If you start with supplier costs or direct labor costs instead, calculate your selling rates first. Recover each allowance once.
The 33.3 sq ft per bundle, the 10% allowance and the accessory lot belong to this one sample roof. A different product has a different label, and a roof with valleys or penetrations needs more accessory material. Pull your quantities from the actual spec and supplier quote.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
It adds a 10% allowance to 600 sq ft, which makes 660 sq ft. It divides that by an assumed 33.3 sq ft of coverage per bundle and rounds 19.82 up to 20. Starter and ridge material is counted in the accessory lot, not in those bundles. Change the allowance and coverage to match your product and roof.
The sample assumes a sound deck, pending inspection. If you find damage, price the repair as its own line and get your customer's agreement before you do the work. Don't fold it into the original price unless you've already agreed that scope.
Yes. Replace the shingle rows with the materials, installation and accessories needed for your repair or metal-roof scope. The example quantities and prices are specific to this shingle job.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.