Put your plastering scope, materials and labour into a clear quote. Download a blank PDF or an editable Excel workbook, with a completed room-skim example to guide you.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Tell your customer which surfaces you will finish, what preparation is included and what the price covers. Add your business details, the customer and job address, a quote reference and date.
Say which surfaces you're plastering and what the finish is. "Skim walls and ceiling" tells the customer far more than "plastering".
Show your working so the customer can follow it. In the example, walls of 33.6m² less 4m² of openings gives 29.6m². Adding the 12m² ceiling gives 41.6m².
Describe what you're plastering onto and what you've assumed. The example assumes sound, suitable, previously installed standard plasterboard, with reveals already finished and no new bead work.
List joint preparation, protecting the room, the skim finish and cleanup if you're pricing them. The customer then sees what the price covers beyond the plaster.
Name what's out. The example excludes boarding, backing plaster, removal, damp repairs, decorating and electrical work. If the job needs any of those, adapt the rows and price that scope separately.
Show VAT separately from the subtotal. Add how long the quote stands, your payment terms and your likely start, using your own terms.
From site visit to a clear figure
Use the blank PDF if you'd rather write the quote by hand. Use the Excel workbook if you want it to do the sums. The PDF is printable only, not an interactive form. If eight slots aren't enough, the browser editor allows extra rows.
Give each slot a clear description and unit: m², hours, bags, lots or jobs. Keep materials, labour, vehicle and hire on separate lines so the customer can see where the money goes.
Use rates that already include overhead and profit, because the template does not calculate markup. If you would rather not build every line by hand, Construction Job Estimator can turn your job description, measurements and site photos into a working estimate, with real-time material prices from local suppliers and costs you can review and adjust. Work out your markup and selling price.
Choose GBP, USD or CAD. This only labels the figures and doesn't convert them. Mark the lines that carry VAT and enter the rate that applies to your job. The example's 0% is a placeholder, not an exemption or advice.
Check the line amounts, subtotal, VAT and total against the scope. Add your terms and save a copy for the job. Send the completed quotation, keeping the sample sheet out of the customer copy.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This example covers skimming the walls and ceiling of a cleared 4 m × 3 m room, 2.4 m high. After openings, the finish area is 41.6 m². The £1,000 subtotal matches the pricing guide, with overhead and profit included in the selling rates.
Illustrative selling prices in GBP. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Plaster materialsIllustrative purchase; check product coverage5 bags × £15 | 5 bags | £15 | £75 |
| Joint preparation suppliesAllowance for agreed background preparation1 lot × £56.25 | 1 lot | £56.25 | £56.25 |
| Protection and consumablesRoom protection and job consumables1 lot × £31.25 | 1 lot | £31.25 | £31.25 |
| Protection and preparation labourProtect room and prepare joints/background5 hours × £37.50 | 5 hours | £37.50 | £187.50 |
| Mixing, application and finishingSkim the agreed walls and ceiling10 hours × £37.50 | 10 hours | £37.50 | £375 |
| Measuring, travel and cleanupIncludes planning, collection and handover5 hours × £37.50 | 5 hours | £37.50 | £187.50 |
| Vehicle travelVehicle costs only; wages included above1 job × £50 | 1 job | £50 | £50 |
| Equipment hireJob-specific hire allowance1 job × £37.50 | 1 job | £37.50 | £37.50 |
| Subtotal before applicable tax (GBP) | £1,000 | ||
How the £1,000 is built. The guide starts with £800 of costs, including £100 of overhead, then adds 25% markup. For this document, overhead is spread across 20 person-hours: £5 per hour. The labour selling rate is (£25 + £5) × 1.25 = £37.50. Materials, vehicle and hire carry the same 25% markup. Do not add overhead or profit again.
Read the scope and hours. The 20 person-hours include measuring, planning, collection, travel, preparation, finishing and cleanup. The vehicle row excludes wages. Five bags are an illustrative purchase quantity; check actual product coverage and the background on your job.
Before you send it
A little clarity here can save a difficult conversation later.
The template adds no overhead or profit. If you type in what the work costs you, the total comes out low.
Check the treatment that applies to your job, then set the VAT lines to match. The sample figure won't be right for every quote.
Write "skim walls and ceiling, 41.6m²" rather than "plastering room". Then list what you haven't priced, so a request for boarding or damp repairs later is clearly extra work.
Boarding, backing plaster and repairs are different jobs with different labour and materials. Price them from your own figures on their own rows.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
The example and default currency are GBP. Enter your own rates and applicable VAT treatment. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Yes. Change the row descriptions and units, then price that work from your own figures. Use the browser editor if you need more than eight rows, and don't reuse your skim rates without checking them.
Show materials by purchase unit, such as bags, and labour in person-hours. The example allows five bags for 41.6 m² using the selected product’s coverage and a waste allowance. Check your own product and surface. Its 20 person-hours cover the whole job, not a promised completion time.
In the example, wage time for travel sits in the combined row for planning, collection, travel and cleanup. The vehicle line excludes wages, so the same time isn't counted twice.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.