How to price plastering jobs in the UK
Work out what to charge from the surfaces you’ll finish and the time the whole job takes. See a measured-room example, material quantities and a practical day-rate calculation.

Before you start
- Measure walls, ceilings and reveals separately; floor area does not tell you the plastering area.
- Count preparation, collection, travel and cleanup alongside time spent skimming.
- Build your day rate from your own costs and billable days, rather than copying a generic rate.
To price a plastering job, measure the wall and ceiling area you'll actually finish, check the background condition, add up every cost including your own time, and then add markup. The sample below prices a small room that way, and ends at £1,000 before any applicable VAT. These are sample prices in GBP; use your own costs for your job.
Start with the surface area you'll actually finish
Floor area won't price a skim. Measure the walls (length times height), deduct the openings, then add the ceiling.
Take a cleared room, 4m by 3m and 2.4m high, with 4m² of openings:
- Gross walls: 14m of perimeter × 2.4m = 33.6m²
- Openings: 4m²
- Net walls: 29.6m²
- Ceiling: 12m²
- Finish area: 41.6m²
This figure has no reveals in it. In the sample they're already finished, so they're left out. If your job has reveals to do, measure them separately and allow time for the corners and edges. Deducting an opening and then forgetting its reveal is an easy way to lose money.
Area is only half the story. The sample room is clear, with no projecting corners and no new bead work. Tight access, furniture you have to protect around, and awkward angles all add time without adding a single square metre. Note them at the site visit while you're measuring. The site visit checklist covers access, parking and condition notes.
Check the background before you decide what you're pricing
Not every skim goes onto new board. Before you price, work out which of these you're actually quoting:
- Reskimming existing plaster that's suitable to skim over
- Boarding and skimming
- Backing plaster plus a finish coat
- Repair work
Each one has different materials, preparation and time. Price them as separate lines rather than one blended m² rate, so a change in one doesn't wreck the whole quote.
The sample is skim only, onto sound, suitable, previously installed standard plasterboard. It allows for joint preparation, protection, skimming and cleanup. It leaves out boarding, backing plaster, removal, damp repairs, decorating and electrical work.
Preparation also depends on the background. The manufacturer's instructions differ from one surface to the next, so check the product data for the surface in front of you instead of working from a blanket primer or PVA rule.
If you can't know the condition at quote stage, say so. List the unknown work as excluded, or as priced separately once it's exposed. Don't bury a guess inside the main price. If you see signs of damp, structural movement or suspected asbestos, flag them for the right specialist rather than diagnosing them in your quote.
Work out materials from coverage, with an allowance
British Gypsum’s Thistle MultiFinish data lists a 25kg bag as covering 10m² at 2mm on walls and ceilings. That 2mm is the total finished thickness. Two applications build up to it, so the coverage isn't per coat and you shouldn't double it. It's also specific to that product, so check the data for whatever finish you use.
For the sample:
- 41.6m² plus an assumed 10% allowance is 45.76m²
- At 10m² a bag, that's 4.576 bags, so 5 bags
- At an assumed £12 a bag, plaster costs £60
The 10% is an assumption. Replace it with your own waste record. The £12 is a placeholder too, so use your merchant's current price.
Plaster isn't the only material. The sample adds a £45 joint preparation allowance and £25 for protection and consumables, which brings materials to £130.
If you’d rather put the quote together without building a materials list from scratch, you can describe the job to Construction Job Estimator. We bring real-time material prices from local suppliers into your estimate, with quantities and pack sizes you can review. You can also enter a price you already have from your merchant.
Count every person-hour, including yours
Price from the total effort on the job, not from how long plaster is on the wall. The sample uses person-hours: one person working one hour. Two people working five hours each is ten person-hours.
| Task | Person-hours |
|---|---|
| Measure, plan, collect and travel | 3 |
| Protect room and prepare joints/background | 5 |
| Mix, apply and finish walls and ceiling | 10 |
| Clean and hand over | 2 |
| Total | 20 |
Those 20 hours are total job effort. They aren't 20 uninterrupted hours of skimming, and they aren't a standard programme. Treat each task time as an assumption and replace it with times you've logged on your own jobs.
Count your own time. The sample uses an assumed labour cost of £25 an hour, which gives £500. That's what an hour of labour costs the business, not what you charge. If you work the job yourself, you still cost your hours.
Wages for travel and collection are already inside the 3 hours in the first row. So the £40 vehicle allowance covers running costs only. Adding wages again there would count them twice.
Drying time is elapsed time, not automatically billable labour. What you price is the attendance you actually need, such as a return visit to check or finish. For more on building labour inputs, see how to estimate labour costs.
Add hire and overhead, then markup
The last direct costs are £30 of equipment hire and the £40 vehicle allowance. Overhead for the sample is £100. That's a separate allocation that doesn't include the materials, labour, vehicle or hire already listed. Count it once.
| Cost (GBP, before any applicable VAT) | Amount |
|---|---|
| Materials | £130 |
| Labour (20 person-hours × £25) | £500 |
| Vehicle, excluding wages | £40 |
| Equipment hire | £30 |
| Allocated overhead | £100 |
| Total cost | £800 |
| Markup at 25% | £200 |
| Price before any applicable VAT | £1,000 |
Markup and margin aren't the same thing. Markup is added on top of your cost, so 25% of £800 is £200. Margin is the profit as a share of your selling price, and £200 out of £1,000 is 20%. If you're swapping between the two, the contractor markup calculator does the conversion.
As a sense-check, £1,000 over 41.6m² is about £24.04 per finished square metre. Compare that with your own past jobs. It's a check on this sample, not a rate to quote.
The same build also prices a change. Say the customer adds work that needs 4 more person-hours at £25 and £30 more materials. That's £130 of extra cost. At the same 25% markup you add £162.50, so the revised quote is £1,162.50 before any applicable VAT, assuming nothing else moves. That covers extra agreed work, not putting right defective workmanship.
When a customer changes the scope, you don’t have to rebuild the quote from scratch. In Construction Job Estimator, you can adjust quantities, labour time, rates and markup, then prepare a professional quote with your materials, labour and other costs together.
How much should a plasterer charge a day?
Work it out from your own budget. A figure from a forum or a price list doesn't know your overhead or your target profit.
Here's a separate example. It isn't part of the room quote above. Suppose you budget for a year:
- £36,000 for your own labour
- £12,000 for overhead
- £6,000 as a profit target
That's £54,000. Divide by 180 billable days and you get £300 a day.
The 180 is an assumption. It leaves room for time you can't bill, like quoting, travelling between jobs and admin. It isn't a recommendation, so use your own diary to find your number.
That £300 covers your labour, overhead and target profit, and nothing else. Job materials, helpers and other direct costs are priced on top. Don't drop it into the £1,000 room quote, because that quote already carries overhead and markup and you'd count them twice.
Day work and fixed price suit different jobs. A fixed price fits work you've inspected and can define, like the sample room. Day work can suit work where the scope is uncertain, but only if you agree the length of a day, what's included, how many attendances you expect, and when you'll review costs. An open-ended day rate doesn't protect you on its own.
How many rooms can a plasterer skim in a day?
There isn’t one reliable room count for every job. A clear room with sound backgrounds is different from an occupied room needing repairs and a ceiling skim. Time depends on:
- Room size
- Whether it's walls only or walls and ceiling
- The background and the preparation it needs
- Access and protection
- Reveals and corners
Measured scope is more reliable than a room count. On each finished job, log your time for each task (protect, prepare, apply, finish, clean) against the area you finished. Those records give you a better starting point for the next similar job.
The sample shows how to read the numbers. It has 20 person-hours across 41.6m² of finish area, which includes travel, preparation and cleanup. That's an assumption to replace, not a benchmark to quote from.
Drying also confuses room counts. Waiting for plaster to dry extends the calendar time without necessarily adding labour. If you need a return visit, include the extra travel and working time.
Make the quote clear before you send it
Use the free plastering quotation template to put the figures into a customer document. It includes a blank PDF, an Excel workbook and the same £1,000 example, with overhead and profit already included in the selling rates.
Your customer should be able to see what they're paying for. State the room, the measured walls and ceiling, the preparation and finish, and what protection and cleanup are included. Then list what's excluded, such as boarding, damp repairs or decorating. Give the price with your actual VAT treatment, since the £1,000 here is before any applicable VAT.
Agree the practical points too: access, timing, payment terms, and how extra work will be priced. The extra-work example above shows how to calculate that change.
Before you send it, check the quote against your site measurements, the background you found, and the costs you've chosen. Use your own records to check allowances and task times, and identify anything you still need to confirm with the customer.