Electrical estimate example: office lighting replacement
Follow a sample lighting replacement from $985 in job costs to a $1,182 customer estimate, with every allowance explained.

Before you start
- Define the fixtures, access and scope before pricing.
- Include testing, documentation, equipment and delivery in the estimate.
- Keep direct costs and customer prices separate, with markup applied once.
In this example, swapping eight existing office lights for electrician-selected, compatible LED panels comes to $1,182 before tax. The job is one weekday visit in an empty office, with the fixtures going back in the existing positions.
The figures are illustrative USD costs, not live supplier prices or local averages. Use the breakdown to see how an estimate comes together, then replace the inputs with your own.
What this sample job includes and leaves out
The scope covers eight existing fixtures replaced at their existing positions, in one agreed weekday visit. You've confirmed that the existing circuits and supports can be reused. The office has a 9-foot suspended ceiling and is empty during the work.
It leaves out new circuits, panel work, repairs and out-of-hours visits. The customer arranges recycling of the old lamps and fixtures. Before you use this scope, confirm any permit or inspection requirements with your local authority. The sample assumes no separate fees after that check.
You choose the fixtures, the installation method and how you meet code. The estimate only prices those decisions after you've made them.
Each exclusion matches a cost that would change the price if it came into play. If the customer later asks for a new circuit or an evening visit, you can point to the written scope and price the change on its own.
See the cost breakdown and customer estimate
See a complete electrical estimate in Construction Job Estimator
Explore a sample estimate for replacing eight office lights. Switch between Materials, Labour and Other costs, then see the matching customer estimate. These are example costs you can replace with your own.
Eight office light replacements
Materials (3)
$430.00- Specified compatible LED panels8 panels × $50.00$400.00
- Compatible connectors1 pack × $10.00$10.00
- Fixings and consumables1 allowance × $20.00$20.00
Labour (5)
$450.00- Setup and isolation1 person-hour × $60.00$60.00
- Remove existing fixtures2 person-hours × $60.00$120.00
- Fit replacement fixtures3 person-hours × $60.00$180.00
- Testing and documentation1 person-hour × $60.00$60.00
- Cleanup0.5 person-hours × $60.00$30.00
Other costs (3)
$105.00- Delivery1 allowance × $30.00$30.00
- Access equipment hire1 allowance × $60.00$60.00
- Packaging disposal1 allowance × $15.00$15.00
How this estimate adds up
- Direct job costs
- $985.00
- Markup (20%)
- $197.00
- Total before tax
- $1,182.00
Illustrative estimate in USD. All prices, allowances and labor rates are sample figures, not live supplier quotes or local averages.
The estimate your customer receives
Eight office light replacements
Existing positions · One weekday visit · USD
Replace eight existing office lights with electrician-selected compatible LED panels at the same positions. Includes setup, removal, fitting, testing, documentation and cleanup, plus delivery, access equipment hire and packaging disposal. Assumes an empty office with a 9-foot suspended ceiling and existing circuits and supports confirmed suitable for reuse by the electrician.
- Specified compatible LED panels
- $480.00
- Compatible connectors
- $12.00
- Fixings and consumables
- $24.00
- Setup and isolation
- $72.00
- Remove existing fixtures
- $144.00
- Fit replacement fixtures
- $216.00
- Testing and documentation
- $72.00
- Cleanup
- $36.00
- Delivery
- $36.00
- Access equipment hire
- $72.00
- Packaging disposal
- $18.00
Customer prices include 20% markup once. Customer arranges old lamps and fixture recycling. Excludes new circuits, panel work, repairs, out-of-hours visits and tax. This fictional scope assumes no separate permit or inspection fees; confirm requirements and add any fees for your actual job.
Create an estimate like this for your next job
Describe your job, review the costs and prepare a professional estimate for your customer. Download Construction Job Estimator below and try it free for seven days.
How the costs are grouped: materials, labour and other costs
Materials come to $430. That's eight LED panels at $50 ($400), one compatible connector pack ($10) and a $20 allowance for fixing and consumables. The panel count matches the eight fixtures being replaced. The allowance is a stated dollar amount, so it can't slip through as an unpriced item.
Labour comes to $450. That's 7.5 person-hours at $60 per hour, which is the sample direct labour cost including employment costs. The hours break down like this:
- Setup and isolation: 1 hour
- Removing the old fixtures: 2 hours
- Fitting the replacements: 3 hours
- Testing and documentation: 1 hour
- Cleanup: 0.5 hours
Person-hours aren't the same as elapsed time. The job is one agreed weekday visit, but 7.5 hours is the labour allowance for the work. If two people are on site, their hours add together. These hours are an estimating input for this fictional job, not a productivity benchmark.
Other costs come to $105. Delivery is $30, access equipment hire is $60 and packaging disposal is $15. Giving these their own group keeps them from disappearing into materials or labour. Setup appears once, in labour, and disposal appears once, in other costs. The $15 is for the packaging from the new panels. The old lamps stay the customer's responsibility.
Together, that makes $985 in direct costs. Direct costs are what the job costs you before any markup.
How the 20% markup turns $985 into $1,182
Markup is a percentage added on top of your cost. Here it's 20% of all direct costs: $985 × 20% = $197. Add that to $985 and the price is $1,182.00, shown as $1,182 before tax.
In this fictional business, the markup is what covers overhead and profit, so there's no separate overhead line. Other businesses may set that up differently. If yours does, decide which approach you're using and apply it once.
The customer estimate includes 20% markup once in each line. Grouping those lines gives:
| Group | Your direct cost (USD) | Customer row (USD) |
|---|---|---|
| Materials | 430 | 516 |
| Labour | 450 | 540 |
| Other costs | 105 | 126 |
| Total before tax | 985 | 1,182 |
Each group is its direct cost times 1.2, and the groups add back to $1,182. The markup is applied once. If you added 20% to each row and then another 20% to the total, you'd overcharge. If you added an overhead line on top of this markup, you'd count overhead twice.
A 20% markup is not a 20% margin. The $197 is about 16.7% of the $1,182 price. To leave 20% of the selling price above these direct costs, the price would have to be $985 ÷ 0.8 = $1,231.25. Pick one method, and don't mix the two.
Cost and price stay separate too. The $60 an hour is what an hour of labour costs you. The $540 labour row is part of the price your customer sees. This sample customer document shows selling prices; your internal cost breakdown stays separate.
Build your own version from this sample
Start by replacing the example's inputs with yours: your panel price, your labour cost per hour, your delivery, hire and disposal charges, and your own hours for your own job. Then check the purchased quantities against the fixture you've chosen. A different fixture, panel count, connector or fixing changes those lines.
Several scope changes would move the price. For each one, decide whether to price it or exclude it in writing:
- New circuits, repairs or panel work
- An out-of-hours visit
- A different ceiling height or harder access
- An occupied office instead of an empty one
- You taking on the old-lamp recycling
Then choose what your markup is meant to cover and apply it once, to all direct costs. Keep the assumptions with the estimate, so your customer can see what was included and what wasn't.
If you'd rather start from a blank layout, the electrical estimate template gives you one. For the broader method behind a job like this, see how to estimate electrical work.
Putting the same estimate together in Construction Job Estimator
You can build an estimate like this in Construction Job Estimator. Describe the job by voice or text, add the measurements you've taken and site photos, and the app puts materials, labour and other costs such as delivery, equipment hire and disposal into one estimate.
You can see the quantities, pack sizes, prices and labour behind each figure. Quantities, products, labour time, rates and markup are all editable. Material prices come in real time from local suppliers, and you can compare options, pick your supplier or type in a price you already have. When the estimate looks right, you send a professional estimate to your customer. If they accept, you can convert it to an invoice.
The electrical decisions stay with you. You specify the fixtures and assess the installation. The app doesn't do blueprint takeoff, circuit design or code and safety approval. It organises the pricing once you've made those calls.
Android is available now, and iOS is awaiting release. There's a seven-day free trial if you want to rebuild this sample with your own numbers.