Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a free electrical estimate template in PDF or Excel. Price your materials, labour, testing and access costs, then give your customer a clear breakdown of the work.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Describe the work around the fixture count, including access, testing, documentation and the conditions your price assumes.
Record the exact fixture model, quantity and customer approval. Check mounting and control compatibility, availability and the supplier lead time before promising a date.
Record the conditions your price relies on and what needs further investigation. Agree how any remedial work outside the replacement scope will be priced.
Note ceiling heights, access restrictions and equipment needed. Check the hire period and whether delivery and collection are included.
Find out when the office lets you work and for how long. If you have to stage the job around occupied areas, you may set up and pack down more than once, and the hours should show it.
Agree whether removed fixtures stay with the customer or need disposal or recycling. Price any fees separately from the labour to remove and handle them.
Confirm required permits, inspections and fees before committing the price. State who handles them and whether they are included, alongside any other scope exclusions.
From site visit to a clear figure
State the fixture count, where they go and what you're replacing. Add the customer's approved fixture and the work you're leaving out, like new circuits, panel changes, rewiring and building repairs.
Obtain supplier prices for fixtures and consumables, plus equipment hire and disposal quotes. Keep these in your costing notes before converting them into the selling rates you enter in the template.
Allow time for preparation, removal, installation, testing, documentation and cleanup. Price each crew member at their own cost and allow for repeat visits where needed. Check your material and labour costs.
Turn each cost into the price you charge before you type it in. The worksheet uses selling rates and doesn't add markup automatically. In the sample, labour is $68.75 an hour and each other direct cost is multiplied by 1.25 once. Calculate your selling price.
Check the total, applicable tax, scope and exclusions. Add your business and customer details, project address, validity, timing and payment arrangements before saving the version you send.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This example replaces eight specified fixtures at existing positions in an office. It allows 16 person-hours and access equipment hire, with a subtotal of $2,162.50 before applicable tax. The USD figures are illustrative; replace them with your own prices.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Specified light fixturesCustomer-approved model; verify compatibility8 fixtures × $93.75 | 8 fixtures | $93.75 | $750 |
| Fixings and consumablesConnectors and fixing supplies1 allowance × $75 | 1 allowance | $75 | $75 |
| Preparation and replacementSetup, coordination, removal and installation11 hours × $68.75 | 11 hours | $68.75 | $756.25 |
| Testing and documentationChecks and records for the agreed scope3 hours × $68.75 | 3 hours | $68.75 | $206.25 |
| Cleanup and loadingClear the work area and load removed fittings2 hours × $68.75 | 2 hours | $68.75 | $137.50 |
| Access equipment hireIncludes equipment delivery and collection1 job × $187.50 | 1 job | $187.50 | $187.50 |
| Disposal feesDisposal charge; handling included in labour1 job × $50 | 1 job | $50 | $50 |
| Subtotal before applicable tax (USD) | $2,162.50 | ||
How the price is built. Your costs: 16 labour hours at $45 cost $720. Add $850 of other costs for $1,570 of direct costs. The $160 of overhead is spread across the 16 labour hours, which is $10 an hour. The selling labour rate is ($45 + $10) × 1.25 = $68.75 an hour, so labour is 16 × $68.75 = $1,100. The $850 of other costs, marked up 25%, becomes $1,062.50. The total price is $2,162.50. Overhead is recovered through the labour rate only, and the 25% markup is already in these selling figures, so don't add either one again.
Confirm the existing conditions. The example assumes suitable existing circuits and controls. Assess them before committing to the scope, then price any required repairs, permits or third-party inspections separately.
Before you send it
A little clarity here can save a difficult conversation later.
A fixture count leaves out access, shutdown windows and repeated setup. Check those conditions on site and include the time they require.
If your labour rate already carries overhead and profit, don't add them again at the bottom. Pick one place to apply markup and check the total against your cost base.
Testing and documentation take real time, 3 person-hours in the sample. If you expect to come back for a delivery or a second shutdown window, put that time in the estimate.
Leaving permit and inspection fees off the sheet doesn't make them go away. Say who confirms the requirements, who pays the fees and whether they're in your price.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Record the issue and explain how it changes the agreed scope. The example excludes unplanned remedial work; agree the added work and revised price before carrying it out.
No. It records your scope, quantities and prices. Confirm the fixture specification, existing conditions and job requirements as part of your electrical assessment.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.