How to price tiling work in the UK: a measured quotation

Build a tiling quotation using square metres, whole-box tile quantities, preparation, adhesive, grout and person-hours, with an illustrative GBP example.

3D contractor planning a kitchen tile layout beside tile boxes, adhesive and grout tools

Before you start

  • Separate installed square metres from whole boxes purchased.
  • Price substrate preparation and wet-area scope explicitly.
  • Use product-specific adhesive and grout coverage and your applicable VAT treatment.

A tiling quotation should make the surface, product and preparation clear before it gives the customer a total. Two rooms with the same floor area can need different preparation, cuts, edge details and time.

Use the tile material calculator with metric units, then adapt the tile estimate template to GBP and your project. The template’s completed example is USD; changing its currency label does not convert its prices.

Define the tiling scope

Record the rooms, surfaces, tile size, pattern and finish. Distinguish walls from floors and identify thresholds, edges, trims and changes in level. State whether removal, disposal, substrate preparation, waterproofing or underfloor heating is included.

Confirm the substrate and the system appropriate to the work. An area-based quantity calculation does not establish that a surface is suitable for tiling or select a waterproofing detail. Follow the project specification and the chosen products’ instructions.

Measure the installed area

For a rectangular room 4 m long and 3 m wide, the installed floor area is 12 m². Split irregular rooms into measured rectangles and avoid counting overlapping sections twice.

Deduct only areas that will not be tiled. Small cut-outs may not reduce the number of boxes purchased. Keep the room measurements with the quotation so the quantity has an understandable basis.

Round the tile order to boxes

Suppose the checked layout uses an illustrative 10% cutting allowance. Twelve square metres becomes 13.2 m². If the selected box covers 1.2 m², order 11 boxes.

At an illustrative supplier cost of £36 per box, the tile material cost is £396. Use the coverage on the selected box. Different tile formats and mixed patterns can have different purchasing units.

The installed area remains 12 m². Do not automatically charge a square-metre installation rate against the 13.2 m² purchasing allowance unless that is how the quoted rate is explicitly defined.

How much extra tile should you order?

Set the allowance from the job, not from a fixed rule. A diagonal layout, herringbone or matching pattern can need more cuts than a simple grid. Large tiles can waste more at the edges, and fragile or hard-to-cut tile raises the risk of breakage. Walk through the layout, count the awkward cuts, and choose a percentage you can explain to your customer.

The 10% used above is illustrative; your layout may need more or less. Add the allowance first, divide by box coverage, then round up to the next whole box if the answer isn't exact.

Decide future repair spares separately. Daltile recommends keeping spare tile for future repairs. Those spares are for later repairs, separate from tiles used up in cuts or breakage. If you and the customer agree on spare boxes, put them on the quote. If you plan to keep leftover tile from your allowance as the spares, count it once.

Before you order, ask your supplier whether the full quantity is available from one batch, since tile from different batches can vary. Check the return terms for unopened boxes too.

Price the other materials and work stages

Adhesive, grout, primers, trims and movement-joint materials need their own quantities. Coverage depends on the selected product, application and surface. Use the manufacturer’s information rather than assuming one bag always covers a fixed number of rooms.

Build person-hours for preparation, setting out, cutting, fixing, grouting and cleanup. Drying or curing intervals can affect the programme and return visits without being continuous labour hours. Record the visits and access assumptions you have priced.

Tile, adhesive, grout, trims and labour usually come from different places, so it's easy to lose track of which figure rests on what. Construction Job Estimator puts materials, labour and other job costs in one estimate and can bring in real-time material prices from local suppliers. You can see the quantities, prices and labour behind each figure, then change any of them to match the tile and adhesive you've specified. You can also describe the job by voice or text and add site photos to get a working estimate, then check it against your own measured areas and box counts.

Check a GBP example

Combine tile at £396, adhesive, grout and trims at £140, preparation labour of 4 hours at £30 for £120, fixing labour of 16 hours at £30 for £480, and disposal at £60.

Direct cost is £1,196. An illustrative 10% overhead allowance adds £119.60, giving £1,315.60. A 20% markup produces £1,578.72 before any applicable VAT.

These are fictional costs to show the calculation, not recommended UK rates. Enter your actual costs and the VAT treatment applicable to your business and work. Check whether supplier amounts include VAT before combining them into your cost basis.

Make the quotation reviewable

Name the tile, pattern, preparation and finish, and state what is excluded. Identify provisional repairs or selections that could change the price. Add validity, programme assumptions, payment arrangements and the acceptance process.

For a wider building project, use the UK builder quotation template.

Once your tiling figures are settled, Construction Job Estimator can prepare a professional estimate or quote to send to your customer. If the job goes ahead, you can convert that estimate into an invoice.

← Back to all guides

Construction Job Estimator

Your next estimate.
Ready in minutes.

Tell us what needs doing. Get real-time material prices from local suppliers, bring your labour and other costs together, and send your customer a professional estimate.

Take the next job from description to estimate.

★★★★★ Used by 10k+ contractors