A clear price. A professional first impression.

Free builder quotation templateMake the next job
look this good.

Give your customer a clear price for the work you have agreed. Download a free builder quotation template in PDF or Excel, with a completed UK example to help you put your own quote together.

PDF & Excel · No signup for templates · By Daniel

BUILDER QUOTATIONQUO-001

Your building business

Prepared for: Sample customer

Utility room floor and shelves12 m² floor · Two fitted shelves
Site setup and protection2 hours × £40
£80
Existing floor removal4 hours × £40
£160
Flooring materials7 packs × £60
£420
Floor installation8 hours × £40
£320
Shelves supplied and fitted2 shelves × £110
£220
Waste removal and handover1 job × £140
£140
Subtotal Before applicable tax£1,340GBP

VAT (20%): £268 · Total: £1,608. Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your builder quotation include?

Make it easy to see what you will supply, what you will do and what the customer will pay. Use the worksheet and add supporting specifications where the job needs more detail.

Site, dates and validity

Put the site address, the quote date and a valid-until date at the top. Add your customer's name too, so the quote can't be mixed up with another job.

Scope and starting assumptions

Say what the price relies on. In the example that means the customer clears the room, the subfloor is accessible, sound and ready after removal, and there are no services or structural changes.

Products, sizes and quantities

Name the floor system, the shelf size and the brackets, and show the quantity for each. If small fittings or threshold details are included in the flooring package, say so on the line.

Exclusions and provisional sums

List what you haven't priced, such as subfloor repairs or levelling, damp treatment, plumbing, electrics, decoration, structural work and moving furniture. A provisional sum is different. If you include one, state the amount and what it's based on.

Price breakdown, VAT and total

Show each line amount, the subtotal, any applicable VAT and the final total. Use consistent rates throughout, and make it clear whether the price includes VAT.

Payment, access, programme and acceptance

Set out the payment stages, when you need access and the programme you expect to work to. Leave space for the customer to accept in writing, with a date.

From site visit to a clear figure

How to write your builder quotation in five steps.

  1. Choose your format and fill in the details

    Download the blank PDF to write on, or the Excel file to type into. Enter the customer, site address, quote date and valid-until date before anything else.

  2. Write the scope before the prices

    Describe the work in plain terms, then add the assumptions it relies on. It's much easier to price a job you've already defined, and the customer can see what they're agreeing to.

  3. Measure and turn it into quantities

    Work from your own measurements, then convert them into what you'll buy or spend. For flooring, add your cutting allowance and round up to whole packs. For labour, count person-hours for each task. Check flooring quantities

  4. Price each row with your own rates

    Multiply quantity by your selling rate for each line. If your rate already includes overhead and profit, as the sample rates do, don't add them again on top. Keep removal, supply, fitting and waste on separate rows unless you've deliberately bundled them. Work out materials and labour costs

  5. Add tax, exclusions and acceptance, then send

    Set the VAT treatment that applies to your business and this job, and check the total. Fill in the exclusions, payment stages and access notes. Save a PDF copy for your records before it goes to the customer.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

Builder quotation, worked through.

This quotation covers a 12 m² utility room floor and two fitted shelves. The customer clears the room. After the old covering is removed, the example assumes a sound, ready subfloor with no services or structural changes. The sample selling rates include overhead and profit.

Illustrative selling prices in GBP. These are example inputs, not local market rates.

Utility room floor and shelves with quantities and illustrative GBP selling rates
Work / materialQuantityRateAmount
Site setup and protectionProtect access and adjacent finishes2 hours × £402 hours£40£80
Existing floor removalTake up covering from 12 m²; waste handling priced below4 hours × £404 hours£40£160
Flooring materials2 m² per pack; 12 m² + 10% allowance rounded up to 7 packs7 packs × £607 packs£60£420
Floor installation8 person-hours; agreed floor system on a ready subfloor8 hours × £408 hours£40£320
Shelves supplied and fittedTwo agreed-size prefinished shelves and brackets, including fitting2 shelves × £1102 shelves£110£220
Waste removal and handoverLoading, haulage, disposal and final tidy; removal labour above1 job × £1401 job£140£140
Subtotal before applicable tax (GBP)£1,340
VAT (20%)£268
Total including VAT (GBP)£1,608

Why the flooring is counted in whole packs The example adds a 10% cutting allowance to the measured floor, then rounds up to whole packs. At an assumed 2 m² per pack, that comes to 7 packs, or 14 m² bought. You can't buy half a pack, so the quote should show what you'll actually order. Pack sizes and layouts vary between products, so confirm the real figures before you send a price.

Keeping removal, fitting and waste on separate lines The removal line pays for taking up the old covering. Loading, haulage, disposal and the final tidy are in the waste line. Shelf supply and fitting are bundled together. The 14 person-hours shown cover setup, removal and floor installation only; shelf and waste work are already priced in their own lines.

VAT in the worked example This example assumes a VAT-registered business supplying standard-rated refurbishment directly to a homeowner: £1,340 plus £268 VAT gives £1,608. Most domestic building work is standard-rated, but exceptions apply. Confirm your registration and the treatment of your actual job. The blank Excel sheet starts at an editable 0%; that is an input, not a VAT recommendation.

Read the UK building quotation guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Quoting before the scope is fixed

If the floor system, shelf size or brackets aren't settled, the price is a guess. Confirm them first, or agree a clearly stated allowance, so the customer knows what the figure covers.

02

Counting the same work twice

A shelf price that includes fitting shouldn't also have fitting labour elsewhere. In the same way, removing old flooring and disposing of it are different costs. Keep them on separate lines and say what each one covers.

03

Mixing up provisional sums and exclusions

An exclusion is work you haven't priced. A provisional sum is money set aside for work that's genuinely uncertain, with the amount and basis written down. Don't use a vague allowance to cover something you really mean to leave out.

04

Leaving unexpected conditions open

Rot beneath the old covering or an uneven subfloor can change the job. Explain what your price assumes, then assess and agree a revised scope and price before carrying out extra work.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Builder quotation template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Is the template set up for a UK job?

The example and default currency are GBP. Enter your own rates and applicable VAT treatment. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

What's the difference between a builder quotation and an invoice?

A quotation sets out the work you propose to do and the price before you start. An invoice asks for payment for work that has been done or agreed. Both can use similar layouts, but they do different jobs, so keep the quote as your record of the agreed scope.

Can I use this template for an extension or a larger job?

You can use the layout, but replace the scope completely and split the price into trade packages. Don't reuse the price from a small room, because the work, access and sequencing won't match. This is a scope-and-price quotation, not a full project contract, so a bigger job may need more detail around it.

How do I quote before the customer has chosen the products?

Either get the products confirmed before you quote, or put in a clearly agreed allowance. State the allowance amount and what it's based on, such as a price per pack. Then say what happens if the final choice costs more or less.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6

Your entries stay in this page. Download a copy before closing; refreshing clears them.

VAT guidance: GOV.UK: VAT for builders · GOV.UK: charging VAT.