How to quote a building job in the UK
Turn site notes and checked costs into a clear quotation, with an illustrative GBP example.

Before you start
- Define inclusions and exclusions before pricing.
- Separate internal costs from customer selling-price lines.
- Confirm the VAT treatment for the actual work.
A clear building quotation begins with a defined result: what you will do, where you will do it and what is included in the price. Build the cost calculation from that scope, then prepare a customer document that is easy to check.
The pricing method works wherever you build: define the work, cost it, allow for overhead and profit, then write the customer quotation. The example below uses GBP; the VAT section applies to UK work.
The UK builder quotation template gives you editable GBP line items, notes and a printable copy. The currency selection does not decide your VAT treatment.
Inspect the work before assigning quantities
Use a site visit checklist to record measurements, condition, access, protection and waste removal. Identify decisions still needed from the customer, such as material selections or finish requirements.
If concealed conditions or unresolved details affect the work, record the assumption. Do not turn an uninspected condition into a confidently stated quantity just to complete the document.
Write a scope that can be priced
For each area, state the task and the finished result. Identify the material or specification, the preparation included and who is responsible for adjacent work.
“Replace damaged skirting in the living room, including removal and making good; decoration excluded” is more useful for estimating than “living room repairs”. The wording connects measured length and labour to a defined task without silently including every related activity.
Use the scope of work worksheet to organise inclusions, exclusions, customer-supplied items and open decisions.
Build an internal cost breakdown
Separate materials, deliveries, labour and other direct costs. Use person-hours for labour: a two-person team working a 12-hour total programme contributes 24 person-hours if both people work throughout those hours. Do not confuse elapsed time with total labour.
Keep preparation, protection and cleanup visible. If a finish needs drying between visits, allow for the actual work and return visits rather than automatically pricing every elapsed hour as labour.
Pricing materials, working out labour and pulling it all into one sheet is the slow part of this step. With Construction Job Estimator, you describe the job by voice or text and add site photos, and it turns those details into a working estimate. Materials, labour and other job costs sit in the same estimate, and material prices come from local suppliers in real time. You can open each figure to see the quantities, prices and labour behind it, then change anything that doesn't match your own rates. Your overhead, markup and VAT treatment are still your decisions, covered below.
A worked quotation calculation
This example uses hypothetical quantities and rates to illustrate the method. It is not a UK price benchmark.
| Cost item | Example calculation | Amount |
|---|---|---|
| Materials | Entered cost | £600 |
| Labour | 24 person-hours × £30 | £720 |
| Disposal | Entered cost | £80 |
| Direct cost | Sum above | £1,400 |
| Overhead allowance | Illustrative 10% of direct cost | £140 |
| Cost basis | Direct cost plus overhead | £1,540 |
| Markup | Illustrative 20% of cost basis | £308 |
| Selling price before tax | Cost basis plus markup | £1,848 |
Check which overheads are already included in your rates before adding another allowance. Use the markup calculator to check the difference between markup and margin.
These calculations belong in your internal working. Your customer quotation can show the agreed work at selling prices without revealing every internal cost or margin assumption.
Identify provisional items and exclusions
Where a selection or quantity is unresolved, describe it clearly and state the amount included. Explain what needs confirming before you can finalise that part of the price. Avoid a single vague “extras” allowance that hides several unrelated decisions.
Exclusions should describe the boundary of your offer: for example, an adjacent finish or work by another trade. A missing line item is not a clear explanation of an exclusion.
Show the relevant tax treatment
Establish the tax treatment applicable to your business and the work before completing the quotation. In the template, enter the rate you have established and select the lines to which it applies. Do not treat the default zero as a decision that no VAT is due.
For official information, start with GOV.UK guidance on charging, reclaiming and recording VAT. The worksheet does not determine registration, rates, exemptions or special construction arrangements, and it is not a VAT invoice.
Review the customer copy
Include the customer and site details, document reference, date, specific scope, selling-price breakdown, allowances, exclusions and tax presentation. Add the validity, programme assumptions and payment arrangements for this job.
Read the quotation against your original notes. Check that access equipment, waste removal and making good are either included or explicitly excluded. Where a later change affects the scope, keep the revised document identifiable and update the underlying calculation.
For decorating work, use the more specific painting and decorating quote template, which separates preparation, coating materials, walls, ceilings and woodwork.