Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Print the blank PDF, edit the Excel file, or start with the completed sample: 120 linear ft of baseboard in two rooms, 17 eight-foot lengths bought, and a 1161 USD subtotal before applicable tax. Use your own costs and prices on your job.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
A baseboard estimate has to show what you fit, what you buy, who finishes it and what the price leaves out. The Excel template has eight rows. The sample uses seven, so one stays free for a line your job needs.
Check each wall run you measured. Confirm the 120 ft is net, with door openings left out, and that the number on the estimate matches your notes. Installation rows should use this measured figure.
Note the corners and joints before you price cutting and fitting. They change the effort, so agree the corner treatment with the customer. The sample fits to agreed corners.
Make sure the materials row uses lengths bought, not feet measured. In the sample that's 17 lengths at 18 each, or 306. Keep the 136 ft purchased figure out of the labor rows.
Write down the selected profile and the number of finish coats. Primed stock isn't the same as finish-painted. Say plainly whether you apply the finish, as the sample does.
List every exclusion in writing. Show disposal apart from the removal work. Write that applicable tax is added separately, so the subtotal isn't read as the final amount.
Check that overhead and profit appear once. Confirm that package lines like fixings and caulk carry no labor already priced on the labor rows. Nothing should be counted twice.
From site visit to a clear figure
Measure each run you'll fit and total the net length. Count corners and joints, and leave out door openings. Enter your measured total on the removal and fitting rows. The sample uses 120 linear ft; replace it with your own figure.
Write what you remove, supply, fit, fill, caulk and finish. Agree the profile and coat count with the customer. If stock arrives primed, say who applies the finish coats.
Add your allowance to the measured length, divide by the stock length, and round up. The sample runs 120 × 1.10 = 132, then 132 ÷ 8 = 16.5, so 17 lengths. Use your own allowance for your job.
Price work that follows the wall per linear ft, such as 120 × 2.50 = 300 for cutting and fitting. Price finishing in person-hours, such as 5 × 60 = 300. Drying isn't labor time. Fixings, paint and cleanup can be a package or job.
Total the rows, then list what the price excludes. Show applicable tax separately. Read the estimate once as your customer would, and ask whether anything could be taken as included.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
The sample replaces 120 measured linear ft of baseboard in two rooms for $1,161 before applicable tax. It includes selected primed stock, removal, fitting to agreed corners, filling, caulking and the specified finish. Materials are purchased as seventeen 8 ft lengths.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and old-trim removalRemove old baseboard and protect floors; disposal fee separate.120 linear ft × $0.75 | 120 linear ft | $0.75 | $90 |
| Baseboard materialsSeventeen 8 ft stock lengths give 136 linear ft purchased.17 lengths × $18 | 17 lengths | $18 | $306 |
| Fixings and caulkFasteners, filler and caulk; no labor.1 package × $45 | 1 package | $45 | $45 |
| Cutting and fitting laborFit 120 linear ft including agreed corner cuts.120 linear ft × $2.50 | 120 linear ft | $2.50 | $300 |
| Preparation and finishing laborFill, caulk and paint selected trim; drying is not labor time.5 hours × $60 | 5 hours | $60 | $300 |
| Paint materialsSpecified finish and application consumables.1 package × $55 | 1 package | $55 | $55 |
| Cleanup and disposalCollect cutoffs and dispose of old trim.1 job × $65 | 1 job | $65 | $65 |
| Subtotal before applicable tax (USD) | $1,161 | ||
Sample prices, overhead and profit These are sample prices in USD, written as customer selling prices. Overhead and profit are already included once, so don't add a second markup to the 1161 subtotal. Replace every rate with your own costs and prices.
Where the 17 lengths come from 120 ft × 1.10 = 132 ft. Divided by 8, that's 16.5, so you buy 17 eight-foot lengths, or 136 linear ft. The extra 16 ft is 13.33% of the measured run. It's a sample result, not a waste rule for your next job.
What the subtotal leaves out The sample excludes wall repairs, floor leveling, furniture moving, shoe molding and whole-wall painting. The length schedule leaves out door openings. Add applicable tax separately, outside the 1161 subtotal.
Before you send it
A little clarity here can save a difficult conversation later.
This sample fits 120 linear ft and buys 136 linear ft to allow for cuts and stock lengths. Its removal and fitting rates apply to 120 ft. Keep the quantity tied to the rate you agreed, with the full purchased stock counted in materials.
Primed stock still needs finish coats. If the estimate doesn't say who applies them, how many coats, and with what finish, the customer may assume it's covered. State it in the scope.
A package line should show what it contains. In the sample, fixings and caulk carry no labor, while the labor rows carry the work. If a package already includes labor, don't price that labor again.
Shoe molding, wall repairs, floor leveling and whole-wall painting can be assumed into the price. Write them as exclusions, or give an allowance with its amount. Keep disposal off the removal line and add tax separately.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
No. It's the sample's allowance, and it produced 17 lengths for 120 ft. Your allowance depends on the profile, corners, joints and how you cut. Set it for your job and round up to whole lengths.
Not in this sample: each rate already includes overhead and profit. When adapting the workbook, enter your customer selling rates so the formulas calculate the amount you intend to charge. The workbook does not have a separate markup calculator.
Add a separate row and price it for that scope. The Excel template has a spare row, and the descriptions are editable. Or leave the item excluded and say so. Don't let it sit unmentioned in the base price.
Use the template when a fixed sheet fits. If you want the estimate built from measurements you've already taken, Construction Job Estimator shows quantities, pack sizes, prices and labor behind each figure. You can edit them, and it's $19.99 USD per month. It doesn't measure the wall for you.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.