Download a blank chain-link fence installation estimate to print and fill in, a completed sample PDF, or a formula-based Excel file you can edit. The sample prices a straight 100 ft boundary with one 4 ft gate opening, so you can see a finished estimate first.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Download a blank PDF to print and fill in, a completed example PDF, or an Excel workbook with formulas and eight editable line rows. Add your business and customer details, describe the scope and exclusions, then enter descriptions, quantities, units and rates. The separate browser editor on this page is another way to prepare your estimate.
Describe your actual boundary, fence height, gate opening and removal scope. The sample has a straight 100 ft boundary with a 4 ft gate opening and no old fence removal. Price any removal separately if your job needs it.
Count fabric in rolls and the gate with its hardware as a set. Explain what is included in post, rail and footing packages in your descriptions or scope notes, so your customer can follow the price.
Layout and post installation is 16 hours and fabric and gate installation is 10, both at 65 an hour. That's 26 person-hours of work. It isn't a schedule, because elapsed time depends on crew size and site, so don't promise days from it. Cleanup labor is in its separate package, outside those 26 hours.
One job row, 100, covers ordinary spoil handling and final cleanup. Keep that wording in the description so the line doesn't quietly stretch to cover heavy spoil or extra haul-away that you haven't priced.
List surveying, permits, utility relocation, rock excavation, retaining work and unusual access as excluded. Then state that the boundary, underground services and system-specific layout get confirmed before work starts. Your customer reads this before they sign.
The sample subtotal is 3200, an illustrative customer selling price with overhead and profit included once. Show applicable tax as its own line below it. Keep it out of the row amounts so the subtotal stays clean.
From site visit to a clear figure
Measure the straight run and the gate opening, then subtract the opening from the boundary to get your fabric length. Round up to whole rolls, since you buy them whole. In the sample, 96 ft of fabric means two 50 ft rolls with 4 ft left over.
Take counts from your selected fence system's documentation and the actual site, not from a rule of thumb. The sample's four terminal and eight line posts are just its supplied schedule. Describe any footing allowance in the row, including what it covers.
Split the work into the phases you'll actually do, such as layout and post work, then fabric and gate fitting. Multiply each phase's person-hours by your billing rate. Keep those hours separate from calendar time, because crew size changes how long the job runs.
Use plain words: what's being installed, what you're using, what isn't included. Name site risks like underground services or rock excavation. If a line is an allowance, say what it covers so nobody assumes it's a fixed, complete price.
Add the eight rows, then put applicable tax on its own line. If rebuilding quantities and prices by hand is the slow part, Construction Job Estimator lets you describe the job by voice or text with your measurements and photos. You then review the quantities, labor and local supplier prices, and prepare a professional estimate or quote in minutes.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This is estimate EST-001: a 100 ft boundary, 96 ft of fabric and a 4 ft gate opening. These are sample prices in USD, shown as illustrative customer selling prices. Use your own costs for your job.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Chain-link fabricTwo 50 ft rolls purchased; 96 ft installed at specified height and mesh.2 rolls × $150 | 2 rolls | $150 | $300 |
| Posts and capsApproved schedule: four terminal posts and eight line posts with caps.1 package × $420 | 1 package | $420 | $420 |
| Rails and fittingsSpecified rail lengths, ties, tension components and connectors.1 package × $310 | 1 package | $310 | $310 |
| Concrete and footing materialsMaterials allowance for approved footing schedule; no universal footing size.1 package × $160 | 1 package | $160 | $160 |
| Gate and hardwareSelected 4 ft gate assembly and hardware.1 set × $220 | 1 set | $220 | $220 |
| Layout and post installationPerson-hours for agreed layout, excavation and post work.16 hours × $65 | 16 hours | $65 | $1,040 |
| Fabric and gate installationFit fabric, rails, fittings and gate to selected system.10 hours × $65 | 10 hours | $65 | $650 |
| Cleanup and disposalOrdinary spoil handling and final cleanup.1 job × $100 | 1 job | $100 | $100 |
| Subtotal before applicable tax (USD) | $3,200 | ||
Where the 96 ft of fabric comes from The 100 ft boundary minus the 4 ft gate opening leaves 96 ft of fabric. Two 50 ft rolls buy 100 ft, so 4 ft remains. The fabric row is 2 rolls at 150, which is 300.
Keep installed quantities and labor clear The example buys 100 ft of fabric for a 96 ft installed run. Layout and post work takes 16 person-hours and fabric and gate fitting takes 10: 26 hourly person-hours in total. The $100 cleanup package is separate. The $3,200 subtotal includes overhead and profit once.
Counts and allowances belong to this sample The four terminal posts and eight line posts are a supplied design schedule for this sample, not a recommended spacing. The concrete and footing row is a sample-specific materials allowance. Real footing quantities and suitability need your actual design and site inputs.
Before you send it
A little clarity here can save a difficult conversation later.
Using 100 ft of fabric on a job with a 4 ft gate overstates the run. Forgetting that rolls come whole causes the opposite problem. Work out the net length first, then round up to rolls, as the sample does with two rolls for 96 ft.
If your package prices already include overhead and profit, adding another percentage on top inflates the total. The same goes for all-in package labor. Don't count it again as hourly labor. Decide where overhead and profit sit, and include them once.
A line like 'site conditions extra' invites arguments. Name the items: surveying, permits, utility relocation, rock excavation, retaining work and unusual access. Then your customer knows what the 3200 doesn't cover before work starts.
Four terminal posts, eight line posts and a 160 footing allowance fit this sample only. Another boundary, soil or fence system can change all three. Build each estimate from the actual design and site, not from the last job.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Yes. It's formula-based with eight rows, so totals recalculate when you change quantities or rates. Descriptions are editable, and a browser editor is available if you'd rather customize the template there.
Use the blank PDF when you want to print it and fill it in by hand. Use the completed PDF to see the layout with illustrative quantities and prices. Use the Excel file when you want to edit and recalculate.
Use the separate browser editor to add more line items, or adapt the workbook carefully and check its formulas. Keep additional work such as fence removal clearly described and priced; the sample excludes it.
The example subtotal is before applicable tax. In the Excel workbook or browser editor, mark the taxable lines and enter the rate that applies to your job. Check the resulting tax and final total before sending.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.