A clear price. A professional first impression.

Free exterior door replacement estimate templateMake the next job
look this good.

Download a blank PDF to fill in by hand, a completed PDF, or an editable Excel file for replacing one prehung exterior entry door. The sample totals 2,225 USD before applicable tax. Every amount is an illustrative selling price, so swap in your own.

PDF & Excel · No signup for templates · By Daniel

EXTERIOR DOOR REPLACEMENT ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

One prehung entry door replaced1 door assembly · existing opening retained
Protection and removal3 hours × $70
$210
Prehung door assembly1 unit × $850
$850
Lock and handle set1 set × $120
$120
Weathering and sealing materials1 package × $95
$95
Interior and exterior trim materials1 package × $125
$125
Installation labor8 hours × $70
$560
Finishing package1 package × $180
$180
Cleanup and disposal1 job × $85
$85
Subtotal Before applicable tax$2,225USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your exterior door replacement estimate include?

Run your own estimate against this list before it goes to your customer. Each item matches a line or statement on the completed sample.

Scope sentence

State one measured prehung exterior entry door in the existing assessed opening. Name what is included: the selected door unit, hardware, specified weathering materials, trim, fitting and finish work. Your customer should be able to read one sentence and know the job.

Door assembly as one line

In this sample, the jamb and threshold come with the selected prehung unit, so the sample prices the assembly at 850 USD as a single line. Don't add jamb or threshold as separate purchases. Note that handing and dimensions need confirming against the selected door.

Lock and handle set

Give the hardware its own line, 120 USD in the sample, so your customer sees what was selected. Fitting labor sits inside installation labor, so you don't charge for it twice. Confirm the hardware is compatible with the chosen door.

Weathering and trim materials

List weathering and sealing materials (95 USD) and interior and exterior trim materials (125 USD) as lines tied to the actual opening. Spell out the flashing, sealants and insulation specified, rather than writing a vague sealant allowance.

Labor and packages

Show hourly labor as person-hours times your rate: 3 hours for protection and removal and 8 for installation, at 70 USD. Finishing (180 USD) and cleanup with disposal (85 USD) are packages that carry their own labor, so don't add hours on top.

Exclusions and tax

Write in what the subtotal leaves out: opening enlargement, structural work, concealed rot, siding replacement and specialist access. Add applicable tax as a separate line after the subtotal, using the rules that apply where you work.

From site visit to a clear figure

How to write your exterior door replacement estimate.

  1. Confirm the opening and door system

    Check the opening, handing and dimensions before you price anything. Record the selected door system and keep its installation instructions with the job notes. Those instructions decide your weathering scope, so they belong in the estimate.

  2. Write scope and exclusions first

    Adapt the sample wording to your assessed opening. Say what is replaced, what is included, and what is not. Writing exclusions now makes it easier to explain a repricing later if the opening hides damage.

  3. Enter materials at your own prices

    Fill in the door assembly, hardware, weathering materials and trim with your own selling prices. The assembly line already covers jamb and threshold. Keep the scope notes specific, such as the actual flashing and sealants, so each amount can be traced.

  4. Price labor without doubling up

    Multiply person-hours by your hourly rate for removal and installation. Then add the finishing and cleanup packages as agreed amounts. Their labor is already in them, and overhead and profit should appear once, not again on top.

  5. Total, add tax, and check before sending

    Add the lines, then add applicable tax separately. Reread the scope and exclusions against the numbers. With the printed PDF, you fill it in by hand and add up yourself. In Excel, the formulas recalculate as you edit.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked exterior door replacement estimate example.

This example replaces one prehung entry door in an assessed existing opening. The $2,225 subtotal includes the selected assembly, hardware, weathering materials, trim, installation, finishing and disposal before applicable tax. Opening alterations and concealed damage are excluded.

Illustrative selling prices in USD. These are example inputs, not local market rates.

One prehung entry door replaced with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and removalProtect access and remove old assembly; waste fee separate.3 hours × $703 hours$70$210
Prehung door assemblySelected door, jamb and threshold assembly.1 unit × $8501 unit$850$850
Lock and handle setSelected compatible hardware; fitting labor below.1 set × $1201 set$120$120
Weathering and sealing materialsSpecified flashing, sealants and insulation for actual opening.1 package × $951 package$95$95
Interior and exterior trim materialsSelected replacement trim around this opening.1 package × $1251 package$125$125
Installation laborFit assembly, hardware, weathering and trim; no structural alteration.8 hours × $708 hours$70$560
Finishing packageAgreed door/trim finish materials and labor.1 package × $1801 package$180$180
Cleanup and disposalWaste charge and final cleanup; removal labor above.1 job × $851 job$85$85
Subtotal before applicable tax (USD)$2,225

Separate the assembly from the extras The selected $850 assembly includes its jamb and threshold. Hardware, weathering materials and replacement trim are priced separately. Check what your supplier includes in the actual door unit before adding those components as extra purchases.

Where the money sits Hourly labor is 11 person-hours at 70 USD, or 770 USD. The door, hardware, weathering and trim lines come to 1,190 USD. The finishing and cleanup packages are 265 USD. Overhead and profit are already inside these selling prices, so nothing is marked up again.

Sample-specific amounts and weathering The package and allowance amounts belong to this one door and opening. Replace them with your own figures. Weathering is required scope for the actual opening, so name the specified materials and follow the selected manufacturer's instructions. If concealed damage turns up, reprice the job.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Pricing jamb and threshold twice

The prehung unit already includes both. If you add them as separate purchases next to the assembly line, you overcharge your customer or have to explain the extra lines. Price the unit once and describe it clearly.

02

Counting labor or markup twice

Finishing and cleanup are packages that already include their labor. Adding hours on top double-counts it. Likewise, the sample lines already carry overhead and profit, so a second markup pushes the total above your intended price.

03

Leaving weathering vague

A line that just says sealant doesn't tell your customer what they're getting. Weathering is project-specific scope. Name the specified flashing, sealants and insulation for the actual opening, and follow the selected manufacturer's instructions.

04

Omitting the exclusions

If concealed rot, structural work or siding aren't written down, your customer may assume they're covered. When the old door comes out and the opening needs more, a written exclusion gives you a clear basis for repricing.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Exterior door replacement estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

What should I do if I find rot or damage when the old door comes out?

Stop and reprice from your written exclusions. The sample covers replacing one door in an assessed opening and excludes concealed rot, structural work and siding replacement. Show your customer the extra scope and price before you continue.

Is the 2,225 USD a price I should quote?

No. It's an illustrative selling price for the sample scope only. Use your own costs and rates, and add applicable tax separately. The point of the sample is to show how the lines and totals fit together.

Why are some lines hours and others packages?

Removal and installation are shown as person-hours, so the labor behind 210 USD and 560 USD is visible. Finishing and cleanup with disposal are agreed package amounts that include their own labor. That keeps the hours from being counted twice.

Can I change the Excel rows, and when would I need more than a template?

The Excel file has eight editable rows, with editable descriptions. A separate browser editor is available on this page. If you'd rather build an estimate from a described job, Construction Job Estimator lets you add measurements and photos, then review quantities, labor time, rates and markup. It runs on iOS and Android at 19.99 USD per month.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7
Line 8

Your entries stay in this page. Download a copy before closing; refreshing clears them.