Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a blank PDF to fill in by hand, a completed PDF, or an editable Excel file for replacing one prehung exterior entry door. The sample totals 2,225 USD before applicable tax. Every amount is an illustrative selling price, so swap in your own.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Run your own estimate against this list before it goes to your customer. Each item matches a line or statement on the completed sample.
State one measured prehung exterior entry door in the existing assessed opening. Name what is included: the selected door unit, hardware, specified weathering materials, trim, fitting and finish work. Your customer should be able to read one sentence and know the job.
In this sample, the jamb and threshold come with the selected prehung unit, so the sample prices the assembly at 850 USD as a single line. Don't add jamb or threshold as separate purchases. Note that handing and dimensions need confirming against the selected door.
Give the hardware its own line, 120 USD in the sample, so your customer sees what was selected. Fitting labor sits inside installation labor, so you don't charge for it twice. Confirm the hardware is compatible with the chosen door.
List weathering and sealing materials (95 USD) and interior and exterior trim materials (125 USD) as lines tied to the actual opening. Spell out the flashing, sealants and insulation specified, rather than writing a vague sealant allowance.
Show hourly labor as person-hours times your rate: 3 hours for protection and removal and 8 for installation, at 70 USD. Finishing (180 USD) and cleanup with disposal (85 USD) are packages that carry their own labor, so don't add hours on top.
Write in what the subtotal leaves out: opening enlargement, structural work, concealed rot, siding replacement and specialist access. Add applicable tax as a separate line after the subtotal, using the rules that apply where you work.
From site visit to a clear figure
Check the opening, handing and dimensions before you price anything. Record the selected door system and keep its installation instructions with the job notes. Those instructions decide your weathering scope, so they belong in the estimate.
Adapt the sample wording to your assessed opening. Say what is replaced, what is included, and what is not. Writing exclusions now makes it easier to explain a repricing later if the opening hides damage.
Fill in the door assembly, hardware, weathering materials and trim with your own selling prices. The assembly line already covers jamb and threshold. Keep the scope notes specific, such as the actual flashing and sealants, so each amount can be traced.
Multiply person-hours by your hourly rate for removal and installation. Then add the finishing and cleanup packages as agreed amounts. Their labor is already in them, and overhead and profit should appear once, not again on top.
Add the lines, then add applicable tax separately. Reread the scope and exclusions against the numbers. With the printed PDF, you fill it in by hand and add up yourself. In Excel, the formulas recalculate as you edit.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This example replaces one prehung entry door in an assessed existing opening. The $2,225 subtotal includes the selected assembly, hardware, weathering materials, trim, installation, finishing and disposal before applicable tax. Opening alterations and concealed damage are excluded.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and removalProtect access and remove old assembly; waste fee separate.3 hours × $70 | 3 hours | $70 | $210 |
| Prehung door assemblySelected door, jamb and threshold assembly.1 unit × $850 | 1 unit | $850 | $850 |
| Lock and handle setSelected compatible hardware; fitting labor below.1 set × $120 | 1 set | $120 | $120 |
| Weathering and sealing materialsSpecified flashing, sealants and insulation for actual opening.1 package × $95 | 1 package | $95 | $95 |
| Interior and exterior trim materialsSelected replacement trim around this opening.1 package × $125 | 1 package | $125 | $125 |
| Installation laborFit assembly, hardware, weathering and trim; no structural alteration.8 hours × $70 | 8 hours | $70 | $560 |
| Finishing packageAgreed door/trim finish materials and labor.1 package × $180 | 1 package | $180 | $180 |
| Cleanup and disposalWaste charge and final cleanup; removal labor above.1 job × $85 | 1 job | $85 | $85 |
| Subtotal before applicable tax (USD) | $2,225 | ||
Separate the assembly from the extras The selected $850 assembly includes its jamb and threshold. Hardware, weathering materials and replacement trim are priced separately. Check what your supplier includes in the actual door unit before adding those components as extra purchases.
Where the money sits Hourly labor is 11 person-hours at 70 USD, or 770 USD. The door, hardware, weathering and trim lines come to 1,190 USD. The finishing and cleanup packages are 265 USD. Overhead and profit are already inside these selling prices, so nothing is marked up again.
Sample-specific amounts and weathering The package and allowance amounts belong to this one door and opening. Replace them with your own figures. Weathering is required scope for the actual opening, so name the specified materials and follow the selected manufacturer's instructions. If concealed damage turns up, reprice the job.
Before you send it
A little clarity here can save a difficult conversation later.
The prehung unit already includes both. If you add them as separate purchases next to the assembly line, you overcharge your customer or have to explain the extra lines. Price the unit once and describe it clearly.
Finishing and cleanup are packages that already include their labor. Adding hours on top double-counts it. Likewise, the sample lines already carry overhead and profit, so a second markup pushes the total above your intended price.
A line that just says sealant doesn't tell your customer what they're getting. Weathering is project-specific scope. Name the specified flashing, sealants and insulation for the actual opening, and follow the selected manufacturer's instructions.
If concealed rot, structural work or siding aren't written down, your customer may assume they're covered. When the old door comes out and the opening needs more, a written exclusion gives you a clear basis for repricing.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Stop and reprice from your written exclusions. The sample covers replacing one door in an assessed opening and excludes concealed rot, structural work and siding replacement. Show your customer the extra scope and price before you continue.
No. It's an illustrative selling price for the sample scope only. Use your own costs and rates, and add applicable tax separately. The point of the sample is to show how the lines and totals fit together.
Removal and installation are shown as person-hours, so the labor behind 210 USD and 560 USD is visible. Finishing and cleanup with disposal are agreed package amounts that include their own labor. That keeps the hours from being counted twice.
The Excel file has eight editable rows, with editable descriptions. A separate browser editor is available on this page. If you'd rather build an estimate from a described job, Construction Job Estimator lets you add measurements and photos, then review quantities, labor time, rates and markup. It runs on iOS and Android at 19.99 USD per month.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.