A clear price. A professional first impression.

Free fence repair estimate templateMake the next job
look this good.

Download a blank fence repair estimate to print and fill in by hand, a completed PDF, or an editable Excel file. The sample prices a 16 ft repair: two adjacent 8 ft panels and three posts. Amounts are illustrative selling prices, with overhead and profit included once.

PDF & Excel · No signup for templates · By Daniel

FENCE REPAIR ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Two adjacent fence bays repairedTwo 8 ft panels · three posts · 16 ft repaired
Protection and removal6 hours × $60
$360
Replacement panel materials2 panels × $145
$290
Post materials3 posts × $38
$114
Footing and fixing materials1 package × $135
$135
Installation labor10 hours × $60
$600
Delivery and disposal fees1 job × $160
$160
Cleanup and handover1 hour × $60
$60
Subtotal Before applicable tax$1,719USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your fence repair estimate include?

Each version has a job reference, your business and customer details, a scope, and exclusions. Below that are line items with description, quantity, unit and rate, then a subtotal before applicable tax. The PDF is for printing and filling in by hand. The Excel file has eight rows with formulas and editable descriptions, and a browser editor is available if you want to customize it. The sample uses seven lines, so one row stays free for your own item.

Repair length and bays replaced

Measure the run you're actually repairing and name the bays. Count posts from that layout. When two replaced bays sit side by side, they share a middle post, so the post count is one more than the panel count.

Parts you're replacing and keeping

List posts, panels, rails and any retained components. In this sample the panel rate includes the rails, so rails aren't a separate line. If your supplier prices rails on their own, change the line to match.

Access and removal

Note how you'll reach the fence, what comes out, and which old footings are agreed for removal. Keep removal labor on its own line so the customer can see what's included.

Connections to retained bays

Inspect how the neighboring bays attach before you price. Allow for safe support of those bays while the old parts come out. If they look weak, say so in writing.

Boundary, buried services and footing design

Confirm the boundary and any buried services before work starts. Confirm the footing design that suits the job too. Put these checks in the estimate notes so the customer knows they happen.

Exclusions in writing

Write down what's not included: gates, staining, boundary changes, underground service relocation and repairs beyond the listed bays. Don't assume storm damage matches from one job to the next. Scope each repair on its own.

From site visit to a clear figure

How to write your fence repair estimate.

  1. Write the scope and exclusions first

    Name the bays you're replacing and the neighboring bays you're keeping. Then list the exclusions. With the scope fixed, the line items have clear edges and the customer knows what the price covers.

  2. List each cost on its own line

    Give removal, panels, posts, footing and fixing, installation, delivery and disposal, and cleanup separate lines. Count labor in person-hours. Use the free Excel row for anything the sample doesn't cover.

  3. Enter quantity, unit and rate

    Fill in each line with your own rates, which should already include overhead and profit. Apply them once. For a package line like the footing allowance, enter one package at your checked amount.

  4. Add the subtotal, then tax

    Total the lines to get your subtotal. Then add applicable tax separately on the final document so the customer sees both figures. In the sample, that subtotal is 1719 before tax.

  5. Or start from your job details

    If you'd rather not build each line by hand, Construction Job Estimator turns job details, measurements you took and site photos into a working estimate for iOS and Android. Materials, labor, delivery and disposal sit together, and you review quantities, labor time, rates and markup before sending a professional estimate. It's $19.99 per month.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked fence repair estimate example.

This sample replaces two adjacent 8 ft panels and three supporting posts, while retaining the neighboring bays. The $1,719 subtotal includes removal of the old footings, materials, installation, delivery and disposal fees, and cleanup. Use your own inspected repair schedule and selling prices.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Two adjacent fence bays repaired with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and removalRemove two panels, three posts and agreed old footings.6 hours × $606 hours$60$360
Replacement panel materialsSelected 8 ft panels; rails included in each panel.2 panels × $1452 panels$145$290
Post materialsTwo end posts plus one shared middle post.3 posts × $383 posts$38$114
Footing and fixing materialsJob-specific concrete and fixings; quantities checked on site.1 package × $1351 package$135$135
Installation laborSet posts, fit panels and reconnect retained neighboring bays.10 hours × $6010 hours$60$600
Delivery and disposal feesSupplier delivery and disposal charges; removal labor is above.1 job × $1601 job$160$160
Cleanup and handoverTidy the work area and inspect the completed repair.1 hour × $601 hour$60$60
Subtotal before applicable tax (USD)$1,719

Three posts, and only 16 ft of fence The two bays share one middle post, so you replace two end posts plus that one shared post, not four. The estimate covers the 16 ft repair length. The neighboring bays are kept, so they aren't priced.

Panels, labor and fees stay separate The panel rate already includes the rails, so there's no rail line. Removal, installation, and delivery and disposal are separate lines. The disposal line is supplier charges, and removal labor sits in the first line. No second markup is added to the subtotal.

The footing package is a sample allowance The 135 footing and fixing package is specific to this sample, with quantities checked on site. It doesn't set a standard post depth or concrete amount for other jobs. Tax is added on top of the 1719 subtotal, never inside it.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Pricing the whole fence or counting four posts

A repair estimate covers the repair length, not the full run. Two adjacent bays use three posts because they share the middle one. Counting four overbuys materials and inflates the price you send.

02

Adding rails on top of a panel rate that includes them

If the panel price already covers its rails, a separate rail line charges the customer twice. Check what your supplier's panel price includes before you add anything beneath it.

03

Mixing labor, fees and markup

Keep removal labor, installation labor and delivery and disposal fees on separate lines. Don't put a second markup on a subtotal that already has overhead and profit in it. Count labor in person-hours, not a duration promise.

04

Skipping exclusions or reusing the footing allowance

Leave out the exclusions and the customer may assume gates, staining or extra bays are covered. The footing package is also specific to this sample. Check quantities on site for each job.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Fence repair estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Can I change the rows and descriptions?

Yes. The Excel file has eight rows with formulas and editable descriptions, and a browser editor is available. The PDF is made for printing and filling in by hand, so use Excel when you want to change lines before sending.

Does the 1719 include tax?

No. It's the subtotal before applicable tax. Add tax separately on your final document, so the customer can see the work price and the tax as two figures.

Are these the rates I should charge?

No. They're illustrative selling prices, with overhead and profit included once. Replace them with your own costs and rates. The layout is what carries over to your job.

What if the neighboring bays are weak or the repair grows?

List extra work as a scope change or leave it as an exclusion. Inspect the connections to the retained bays, and allow for safe support while the old parts come out. Then update the estimate before you go further.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7

Your entries stay in this page. Download a copy before closing; refreshing clears them.