Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a blank fence repair estimate to print and fill in by hand, a completed PDF, or an editable Excel file. The sample prices a 16 ft repair: two adjacent 8 ft panels and three posts. Amounts are illustrative selling prices, with overhead and profit included once.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Each version has a job reference, your business and customer details, a scope, and exclusions. Below that are line items with description, quantity, unit and rate, then a subtotal before applicable tax. The PDF is for printing and filling in by hand. The Excel file has eight rows with formulas and editable descriptions, and a browser editor is available if you want to customize it. The sample uses seven lines, so one row stays free for your own item.
Measure the run you're actually repairing and name the bays. Count posts from that layout. When two replaced bays sit side by side, they share a middle post, so the post count is one more than the panel count.
List posts, panels, rails and any retained components. In this sample the panel rate includes the rails, so rails aren't a separate line. If your supplier prices rails on their own, change the line to match.
Note how you'll reach the fence, what comes out, and which old footings are agreed for removal. Keep removal labor on its own line so the customer can see what's included.
Inspect how the neighboring bays attach before you price. Allow for safe support of those bays while the old parts come out. If they look weak, say so in writing.
Confirm the boundary and any buried services before work starts. Confirm the footing design that suits the job too. Put these checks in the estimate notes so the customer knows they happen.
Write down what's not included: gates, staining, boundary changes, underground service relocation and repairs beyond the listed bays. Don't assume storm damage matches from one job to the next. Scope each repair on its own.
From site visit to a clear figure
Name the bays you're replacing and the neighboring bays you're keeping. Then list the exclusions. With the scope fixed, the line items have clear edges and the customer knows what the price covers.
Give removal, panels, posts, footing and fixing, installation, delivery and disposal, and cleanup separate lines. Count labor in person-hours. Use the free Excel row for anything the sample doesn't cover.
Fill in each line with your own rates, which should already include overhead and profit. Apply them once. For a package line like the footing allowance, enter one package at your checked amount.
Total the lines to get your subtotal. Then add applicable tax separately on the final document so the customer sees both figures. In the sample, that subtotal is 1719 before tax.
If you'd rather not build each line by hand, Construction Job Estimator turns job details, measurements you took and site photos into a working estimate for iOS and Android. Materials, labor, delivery and disposal sit together, and you review quantities, labor time, rates and markup before sending a professional estimate. It's $19.99 per month.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This sample replaces two adjacent 8 ft panels and three supporting posts, while retaining the neighboring bays. The $1,719 subtotal includes removal of the old footings, materials, installation, delivery and disposal fees, and cleanup. Use your own inspected repair schedule and selling prices.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and removalRemove two panels, three posts and agreed old footings.6 hours × $60 | 6 hours | $60 | $360 |
| Replacement panel materialsSelected 8 ft panels; rails included in each panel.2 panels × $145 | 2 panels | $145 | $290 |
| Post materialsTwo end posts plus one shared middle post.3 posts × $38 | 3 posts | $38 | $114 |
| Footing and fixing materialsJob-specific concrete and fixings; quantities checked on site.1 package × $135 | 1 package | $135 | $135 |
| Installation laborSet posts, fit panels and reconnect retained neighboring bays.10 hours × $60 | 10 hours | $60 | $600 |
| Delivery and disposal feesSupplier delivery and disposal charges; removal labor is above.1 job × $160 | 1 job | $160 | $160 |
| Cleanup and handoverTidy the work area and inspect the completed repair.1 hour × $60 | 1 hour | $60 | $60 |
| Subtotal before applicable tax (USD) | $1,719 | ||
Three posts, and only 16 ft of fence The two bays share one middle post, so you replace two end posts plus that one shared post, not four. The estimate covers the 16 ft repair length. The neighboring bays are kept, so they aren't priced.
Panels, labor and fees stay separate The panel rate already includes the rails, so there's no rail line. Removal, installation, and delivery and disposal are separate lines. The disposal line is supplier charges, and removal labor sits in the first line. No second markup is added to the subtotal.
The footing package is a sample allowance The 135 footing and fixing package is specific to this sample, with quantities checked on site. It doesn't set a standard post depth or concrete amount for other jobs. Tax is added on top of the 1719 subtotal, never inside it.
Before you send it
A little clarity here can save a difficult conversation later.
A repair estimate covers the repair length, not the full run. Two adjacent bays use three posts because they share the middle one. Counting four overbuys materials and inflates the price you send.
If the panel price already covers its rails, a separate rail line charges the customer twice. Check what your supplier's panel price includes before you add anything beneath it.
Keep removal labor, installation labor and delivery and disposal fees on separate lines. Don't put a second markup on a subtotal that already has overhead and profit in it. Count labor in person-hours, not a duration promise.
Leave out the exclusions and the customer may assume gates, staining or extra bays are covered. The footing package is also specific to this sample. Check quantities on site for each job.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Yes. The Excel file has eight rows with formulas and editable descriptions, and a browser editor is available. The PDF is made for printing and filling in by hand, so use Excel when you want to change lines before sending.
No. It's the subtotal before applicable tax. Add tax separately on your final document, so the customer can see the work price and the tax as two figures.
No. They're illustrative selling prices, with overhead and profit included once. Replace them with your own costs and rates. The layout is what carries over to your job.
List extra work as a scope change or leave it as an exclusion. Inspect the connections to the retained bays, and allow for safe support while the old parts come out. Then update the estimate before you go further.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.