Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download the blank PDF to print and fill in, the completed sample PDF, or the editable Excel file with formulas. The sample is a selective kitchen strip-out: ten cabinets, 200 sq ft of floor finish and one partition, totaling 2,090 USD before applicable tax.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
The templates provide business and customer details, eight priced rows, scope and exclusions notes, and subtotal and tax fields. Print the blank PDF to fill it in by hand, or edit the Excel workbook and let its formulas calculate the totals. The optional browser editor is separate from the downloaded files.
Write what is coming out and what is staying. The sample says ten cabinets, 200 sq ft of floor finish and one verified nonstructural partition. A customer should be able to read that box and know exactly what you've priced before they look at a single number.
Price the cost of protecting retained finishes and the agreed access route. The sample carries this as one 250 package covering setup labor and consumables. Name what you're protecting in the scope notes so the customer sees the work behind the line.
The sample has a 300 package for isolation of scheduled sink and electrical connections by a qualified trade, with no new installation. List which connections are in scope. Confirm the isolation scope before work, and keep new services off the estimate.
Match each row to the way you actually price it. Cabinets are 10 units at 35, which is 350. Floor finish is 200 sq ft at 1.25, which is 250. The partition is one package at 280, with both faces of the 10 ft by 8 ft wall included.
Split sorting and loading from the disposal fee. The sample has 6 person-hours at 55, a 220 disposal charge with no second loading charge, and 2 person-hours of cleanup at 55. Each line shows its own basis, so the customer can see what the waste handling covers.
Put the limits on the estimate itself. List the excluded work, note that partition status and isolation scope are confirmed before work, and add applicable tax as its own line. Don't leave these only in an email or a conversation.
From site visit to a clear figure
Print the blank PDF if you want to fill it in by hand on site or at the kitchen table. Open the Excel file if you'd rather edit and let the formulas do the totals. Both hold eight rows, so plan your line items to fit.
Fill in the scope box and the exclusions before any prices. Every row then has something to hang on, and the customer sees the limits up front. Use the sample wording as a starting point and change it to match your job.
Decide whether each line is a package, a unit price, an area rate or person-hours. Then enter your own quantities and rates. In the sample, the partition's 80 sq ft per face sits inside one partition price, so there's no wall rate multiplied by 160.
Add the rows and make sure overhead and profit show up once. Look for a second markup or for hourly labor stacked on top of a package that already includes it. Then add applicable tax separately, below the subtotal.
If you'd rather not fill in rows by hand, Construction Job Estimator can build the estimate from a job description, measurements you've taken and site photos. It brings labor, materials and costs like disposal into one estimate, and you can review and adjust quantities, labor time, rates and markup.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
The sample is a selective kitchen strip-out. It covers removing ten cabinets, 200 sq ft of floor finish and one verified nonstructural partition, with protection, specified service isolation and ordinary waste handling. Each row states its basis, whether that's a package, a unit count, an area or person-hours. These are sample prices in USD; use your own costs for your job.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and containmentProtect retained finishes and the agreed access route; setup labor and consumables.1 package × $250 | 1 package | $250 | $250 |
| Service isolation packageQualified-trade isolation of scheduled sink and electrical connections; no new installation.1 package × $300 | 1 package | $300 | $300 |
| Cabinet removal laborRemove ten existing cabinets; loading priced separately.10 units × $35 | 10 units | $35 | $350 |
| Floor finish removal laborRemove the agreed floor finish without assumed structural substrate removal.200 sq ft × $1.25 | 200 sq ft | $1.25 | $250 |
| Partition removal laborRemove one verified nonstructural 10 ft by 8 ft partition; both faces included.1 partition × $280 | 1 partition | $280 | $280 |
| Waste sorting and loadingSix person-hours to sort and load agreed ordinary waste.6 hours × $55 | 6 hours | $55 | $330 |
| Waste disposal feesIllustrative ordinary-waste disposal charge; no second loading charge.1 job × $220 | 1 job | $220 | $220 |
| Final cleanupClean the stripped work area for the next trade.2 hours × $55 | 2 hours | $55 | $110 |
| Subtotal before applicable tax (USD) | $2,090 | ||
Prices include overhead and profit once The amounts are illustrative selling prices, with overhead and profit already built in. Don't add a second markup on top. The 2,090 USD subtotal is before applicable tax, which goes on as a separate line. Your own rates will differ, so replace every number with your own.
Labor appears in two ways, never twice Waste sorting and loading is 6 person-hours at 55, which is 330. Final cleanup is 2 person-hours at 55, which is 110. The cabinet, floor and partition rows already carry their labor in the unit or package price. the scope notes says what it covers, so nothing gets counted twice.
The disposal charge and the exclusions The 220 disposal fee is a sample figure for ordinary assessed waste. It isn't a guaranteed skip size or a hazardous-waste fee. The subtotal leaves out structural demolition, hazardous materials, appliances, rebuilding, new services and hidden-condition repairs. Partition status and isolation scope must be confirmed before work starts.
Before you send it
A little clarity here can save a difficult conversation later.
The sample prices one whole partition at $280, including both faces. Do not multiply that package price by its 80 sq ft face area or 160 sq ft combined face area. If you prefer an area rate, use a matching quantity and explain exactly what that rate covers.
If a package or unit price already includes labor, don't add person-hours for the same work. The sample uses hourly labor only for waste sorting and loading and for cleanup. Write what each row covers so you and the customer can both check it.
Name the structural demolition, hazardous materials, appliances, rebuilding, new services and hidden-condition repairs you aren't pricing. Ordinary-waste pricing shouldn't read as covering hazardous waste or a guaranteed skip size. Unstated limits turn into arguments later.
The sample prices already include overhead and profit, so adding another percentage inflates the job. Watch for loading charged twice as well: the disposal row says there's no second loading charge. Keep every cost in one place.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
The sample already includes both faces, 80 sq ft each and 160 sq ft in total, in one package for a verified nonstructural 10 ft by 8 ft partition. If your partition is a different size, or you're only removing one face, change the description and your price.
No. It's an illustrative selling price built to show the structure. Use your own costs and rates for your job, with overhead and profit included once. Your scope, access and waste will all move the number.
Group related work into a clearly described package, or use the separate browser editor to add more line items. The Excel workbook has eight priced rows. Keep the full removal scope and exclusions clear when grouping tasks.
No. Applicable tax is added separately below the subtotal. Hidden-condition repairs are excluded in the sample, so if something turns up once work starts, talk to the customer about it before you go further.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.