Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download the blank PDF, the completed PDF or the Excel file, then compare your job against the three-slab sample. It covers slabs fitted in retained jambs. The amounts are illustrative USD prices you send the customer, so swap in your own.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Pick the file that fits how you work. Each one uses the same layout, so you can start with the sample and move to your own numbers.
Look at every opening before you price it, and note anything that could change the work. Nobody can promise a slab will fit a retained jamb until it's checked. Put anything you didn't inspect or don't cover into the exclusions.
Measure each opening and write the slab size beside it. Don't assume all three doors match. The sample confirms door sizes for each opening, so the customer sees exactly what you're supplying.
Note the handing of each door and where the hinges and handle sets go. Confirm these before ordering, because a wrong-hand slab turns into a change to your price. List one complete hardware set per door.
State plainly whether you're replacing slabs in the existing jambs or supplying prehung assemblies. They are different jobs with different lines. Don't set a universal trimming allowance. Price what each opening needs.
Choose the finish for the new slabs, and say whether finishing materials and labor are in your price. If the jambs are staying as they are, say that repainting them is excluded.
Decide how the old slabs leave the site and who pays any disposal fee. Keep per-door protection and removal separate from the job-level disposal and cleanup line, so removal labor isn't priced twice.
From site visit to a clear figure
Start with one sentence on what you'll do, then list what you won't. Name prehung frames, casing, opening changes, fire-rated assemblies and major jamb repairs if they apply. The line items are easier to build once the boundary is fixed.
Add removal, slabs and hardware as separate lines, with quantities that match the door count. In the sample, three doors give 3 x 45, 3 x 110 and 3 x 42. Use your own rates and the product you've chosen.
Estimate the hours people will work, then apply your selling rate to them. The sample uses 9 hours for fitting and 4 for finishing. If you use an all-in labor price, don't add separate labor lines on top.
Add finishing materials, finishing labor, and disposal and cleanup when the job needs them. Keep each line's detail short, such as new slabs only, so the customer can see where your price starts and stops.
Add up the lines, then add applicable tax separately. Print the PDF or save the Excel file. If you'd rather not keep templates up by hand, Construction Job Estimator lets you describe the job by voice or text, including measurements you've taken. You can review quantities, labor and markup, prepare an estimate or quote, and convert it to an invoice later. It runs on iOS and Android at $19.99 per month.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This example replaces three measured interior door slabs in inspected retained jambs. Its $1,606 subtotal includes the slabs, hardware, fitting, finishing and disposal before applicable tax. New frames, casing, opening changes and major jamb repairs are excluded.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and removalProtect floors and remove three old slabs; disposal fee separate.3 doors × $45 | 3 doors | $45 | $135 |
| Door slab materialsThree selected matching-size interior slabs.3 slabs × $110 | 3 slabs | $110 | $330 |
| Hinges and handle setsOne complete selected hardware set per door.3 sets × $42 | 3 sets | $42 | $126 |
| Fitting and adjustment laborNine person-hours across three doors; includes hardware fitting.9 hours × $65 | 9 hours | $65 | $585 |
| Finishing materialsCompatible preparation and finishing consumables for new slabs.1 package × $75 | 1 package | $75 | $75 |
| Finishing laborPrepare and finish new slabs only; retained jamb repaint excluded.4 hours × $65 | 4 hours | $65 | $260 |
| Disposal and cleanupOld slab disposal and final cleanup; no duplicate removal labor.1 job × $95 | 1 job | $95 | $95 |
| Subtotal before applicable tax (USD) | $1,606 | ||
Overhead and profit are already in the prices Each line is a price you send the customer, with overhead and profit counted once. Don't add a second markup on top of the 1,606 subtotal. Add applicable tax separately, after the subtotal, based on your own situation.
Labor is counted in person-hours The two hourly labor rows total 13 person-hours: 9 for fitting and 4 for finishing. That's hours worked by people, not a promise of how long the job takes on site. Removal is priced per door, and the 95 line covers old slab disposal and final cleanup, so nothing is counted twice.
Allowances belong to this sample The 75 finishing materials package and the 95 disposal and cleanup line fit this scope only. Replace them with your own costs for the product you choose. Three slabs are not three prehung assemblies, so don't use this sample to price frame work.
Before you send it
A little clarity here can save a difficult conversation later.
A slab-only job has no frame to supply, and a prehung job does. If you leave the scope unstated, the customer may assume either one. Say which you're pricing and exclude the other.
If your labor price already covers a package, adding extra labor lines doubles it. The sample prices also include overhead and profit, so adding markup to the 1,606 subtotal counts them twice. Pick one method and use it once.
Don't hope the customer assumes casing, opening changes, fire-rated assemblies or major jamb repairs are out. Write them down. Also state that retained jamb repainting is excluded if you aren't pricing it.
The 45, 110, 42 and 65 rates and the 75 and 95 packages are sample-specific. They aren't your costs and they aren't market prices. Rebuild each line from your own suppliers, labor rate and overhead.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Only if you rewrite the scope, lines and exclusions. The sample covers slabs in retained jambs and doesn't price frame work. You'd need lines for the assemblies and for any casing or jamb work you take on.
No. The sample line prices already include overhead and profit once. Adding markup on top would count them twice. If you rebuild the lines from your own costs, set your markup as you build them.
The Excel file has eight editable rows, and the sample uses seven. Combine related items into one line or adjust the description wording. You can also edit descriptions in the browser editor to match your job.
No. The 1,606 USD is the subtotal before applicable tax. Add tax as its own line after the subtotal, using the treatment that applies to your own jobs.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.