Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download this kitchen backsplash installation estimate template as a blank PDF, a completed PDF or an editable Excel file. The sample prices a 40 sq ft job with 48 sq ft of tile bought: 1,813 USD before tax. Use your own rates.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Each file has a scope statement, line items with quantity, unit and rate, an exclusions block and a subtotal. Tax goes on separately. Pick the format that matches how you quote.
Use your own measurements of the wall area you'll tile, not a guess from the cabinet run. This number drives the tile boxes and the per-square-foot setting labor, so confirm it before you price anything else.
Count the outlets and note where each cut falls. Also note whether any device needs to move. In the sample, cutouts are part of setting labor, while relocating devices is excluded and handled as separate electrical work.
Measure the linear feet of exposed edge that need trim. The sample prices 12 linear ft at 5 per foot, with fitting covered in setting labor. Your trim choice and cost will differ, so enter your own.
Confirm the tile you'll install, how many square feet each box covers and what a box costs you. The sample uses 8 sq ft per box at 48 per box. Pack size decides how many boxes you actually buy.
Decide what local preparation the walls need and put it in writing. The sample uses a $180 package for localized work, not full wall replacement. Your chosen tile, adhesive and substrate instructions set the real requirements, so follow those.
List the hours each person will work on protection, layout, grouting and cleanup, and your hourly rate. Use person-hours, not elapsed days. Drying time isn't hands-on labor, so it doesn't belong in an hours line.
From site visit to a clear figure
Describe the work in plain sentences before you enter a price: tile area, cutouts, edges, preparation, setting materials, grouting and cleanup. Put exclusions beside it. Naming old tile removal, concealed damage and electrical changes up front saves arguments later.
Start from installed area, add your own planning allowance, then divide by the box coverage. Round up to whole boxes. The sample uses 10% and lands on 6 boxes. Label the allowance as your choice for this job, not a fixed rule.
Use hourly lines for work like protection and layout or grouting and cleanup, and a per-square-foot line for setting. Bill setting on installed area. Keep hours as person-hours so the line shows work, not a schedule promise.
Enter agreed lump sums for items like substrate preparation, setting and grout materials, and trim. If a package already includes labor, don't price that labor again on an hourly line. The sample's setting and grout package is materials only, so no labor is hiding in it.
Add the lines for your subtotal, then apply any tax that applies to your job as its own line. If you'd rather not build this by hand, Construction Job Estimator can turn your measurements, quantities, labor time, rates and markup into a professional estimate or quote. You can review and adjust each line.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
Here's the finished sample for a straight-layout backsplash. Check your own lines against it: quantity, unit, rate and the scope text that tells the customer what's covered.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Protection and layoutProtect counters and confirm straight tile layout and cutout positions.3 hours × $65 | 3 hours | $65 | $195 |
| Local substrate preparationAgreed localized preparation labor and materials; not full wall replacement.1 package × $180 | 1 package | $180 | $180 |
| Tile materials8 sq ft per box:48 sq ft bought for 40 sq ft installed.6 boxes × $48 | 6 boxes | $48 | $288 |
| Setting and grout materialsSelected compatible adhesive, grout and sealant; no labor included.1 package × $110 | 1 package | $110 | $110 |
| Edge trim materialsSelected exposed-edge trim; fitting included in setting labor.12 linear ft × $5 | 12 linear ft | $5 | $60 |
| Tile setting laborStraight layout, four outlet cutouts and edge fitting included.40 sq ft × $18 | 40 sq ft | $18 | $720 |
| Grouting and cleanupGrout, finish agreed junctions and clean; drying is not hands-on labor.4 hours × $65 | 4 hours | $65 | $260 |
| Subtotal before applicable tax (USD) | $1,813 | ||
Selling prices, with overhead and profit counted once These are sample prices in USD, written as what you'd send the customer. Overhead and profit are already inside them, so don't add a second markup to the 1,813 USD subtotal. Swap in your own rates and costs.
Tile quantity is sample-specific The sample takes 40 sq ft installed times 1.10 for a 44 sq ft planning amount. At 8 sq ft per box, 44 divided by 8 is 5.5, so it rounds up to 6 boxes, or 48 sq ft. The 8 sq ft excess is 20% of installed area here only. It isn't a waste rule.
Labor follows installed area Tile setting labor is billed on the 40 sq ft installed, not the 48 sq ft bought. That line includes four outlet cutouts and edge fitting. Moving electrical devices isn't included and is arranged separately where required.
Before you send it
A little clarity here can save a difficult conversation later.
In this example, setting labor is priced on the 40 sq ft installed. Using the 48 sq ft purchased would change that line from $720 to $864. Keep the purchased quantity in the material calculation and use the agreed installed-area basis for this labor rate.
If your rates already carry overhead and profit, the subtotal is a selling price. Adding markup on top counts it twice and can push you above what you meant to quote. Decide where markup lives and apply it once.
When a package already covers labor, a separate hourly line for the same work doubles it. Check what each package includes before you total. Pricing each package separately is a choice for the job, not a requirement.
A line that says cutouts are included doesn't tell the customer that moving devices isn't. Name old tile removal, full wall replacement, countertop work, electrical changes, patterned layouts and concealed damage so everyone knows what the price covers.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Boxes come in whole units. At 8 sq ft per box, 44 sq ft is 5.5 boxes, so you round up to 6. That leaves 8 sq ft extra, or 20% of the installed area in this sample. Use your own allowance for your job.
The customer is paying for 40 sq ft of installed tile. The extra 8 sq ft is purchased stock, not work you set. Tile cost covers all 48 sq ft, while setting labor covers only the area you install.
It's before applicable tax. It also excludes old tile removal, full wall replacement, electrical device alterations, countertop work, patterned layouts and concealed damage. Those items sit in the exclusions block so the customer sees them before approving.
Add it as its own line using the spare eighth row in Excel, or edit the descriptions in the browser editor. If you won't do the work, list it as an exclusion. Either way, say it in writing before the customer signs.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.