Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Download a blank shelving installation estimate as a printable PDF, or as an editable Excel file. A completed PDF is included too. It prices six 36 inch wall-mounted shelves, so you can check the layout and scope against your own jobs.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
Print the blank PDF to fill in by hand, or use the Excel workbook for eight editable rows and formula totals. Both include space for scope, exclusions, subtotal and tax. The separate browser editor lets you prepare an estimate on this page.
Check what the shelves will mount to before you accept a fixed installation. The wall can change the fixings, the labor and whether you should take the job as written.
Note which fixings suit the actual wall and support system, and what the customer plans to put on the shelves. Don't quote ratings or capacities unless you can back them up.
Write the number of shelves and each length, then total them. Six 36 inch shelves give 216 inches, or 18 linear feet. A clear total makes the board line easy to check.
Record how many brackets or supports you're pricing and where they go. The sample uses two per shelf, but your count should follow your system and your wall.
Enter hours for survey, installation and cleanup at a rate that already includes overhead and profit. Hours worked by each person are different from elapsed job time, so keep them apart.
Put the written scope and the exclusions on the page next to the price. Add applicable tax on its own line below the subtotal, not inside it.
From site visit to a clear figure
Name the items, the sizes and the agreed positions in one or two sentences. The sample reads: supply and install six selected 36 inch shelves with two specified brackets per shelf. Add your confirmation notes for the wall, fixings and intended use.
Put what you aren't pricing right next to what you are, so the customer sees the limits before the total. Name the real risks for your job, such as cabinet building, wall reconstruction, wiring relocation and concealed-service repairs.
Give each row a description, quantity, unit and rate, then multiply and total. The sample uses seven rows, so the eight-row Excel file leaves one spare. If a job needs more lines, group related items. When you want to build and adjust estimates faster, Construction Job Estimator lets you describe the job by voice or text with your measurements, review the quantities and labor behind each figure, and change markup or any line before you send it.
Replace the sample fixings, touchup and bracket numbers with ones that fit the actual wall and support system. If the wall isn't what you expected, change the price or the scope before the customer signs.
Total the rows to get your subtotal, then add applicable tax on its own line. Keep the subtotal clean so the customer can see both numbers. Send the estimate with the scope and exclusions on the same page.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
This sample supplies and installs six selected 36 inch shelves with twelve specified brackets. The $977 subtotal includes survey and layout, materials, fitting, minor touchups and cleanup before applicable tax. The shelf and fixing choices must suit the assessed wall and intended use.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Survey, layout and protectionConfirm dimensions, positions and assessed wall conditions.2 hours × $65 | 2 hours | $65 | $130 |
| Shelf boardsSix selected finished 36 inch shelves.6 shelves × $38 | 6 shelves | $38 | $228 |
| Support bracketsTwo selected brackets per shelf for this assessed example.12 brackets × $12 | 12 brackets | $12 | $144 |
| Specified fixings and consumablesFixings chosen for actual wall and support system.1 package × $45 | 1 package | $45 | $45 |
| Installation laborFit and align the six shelves to the agreed arrangement.5 hours × $65 | 5 hours | $65 | $325 |
| Minor touchupsLocal finishing around installation only; no whole-wall paint.1 package × $40 | 1 package | $40 | $40 |
| Cleanup and handoverClean work area and pass on selected product use information.1 hour × $65 | 1 hour | $65 | $65 |
| Subtotal before applicable tax (USD) | $977 | ||
Rates already include overhead and profit Every figure is a price you send the customer, with overhead and profit included once. That is why the labor rows carry no second markup. If your own labor rate is a cost figure, add your markup once and then leave the totals alone.
Eight person-hours, no duration promise The hourly rows total 8 person-hours: 2 for survey, 5 for installation and 1 for cleanup. The touchup package includes additional labor. Person-hours count work, not how long the job takes on site, so the estimate makes no promise about days or finish dates.
Allowances and exclusions belong to this sample The 45 for fixings and the 40 for touchups are allowances for this job only. Touchups cover local finishing around the installation, with no whole-wall paint. The 12 brackets are this job's count, not a spacing rule. Cabinet building, wall reconstruction, wiring relocation and concealed-service repairs are excluded, and the estimate promises no load rating.
Before you send it
A little clarity here can save a difficult conversation later.
If the scope only says install shelves, the customer can assume extra wall prep, patching or painting is included. Name the items, sizes and agreed positions so the price covers exactly that work.
A customer may read a shelving price as including cabinetry, wall repair or wiring changes. Spell out what's excluded, and state that the estimate promises no load rating.
If your labor rate already carries overhead and profit, marking it up again overstates the price. Count overhead and profit once, then total the rows.
The bracket count and the fixings and touchup allowances fit this sample only. Check them against the real wall and system. Also keep tax off the subtotal, so the figure you send stays clear.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
The subtotal is the sum of the seven line items. Applicable tax is added on its own line, so the customer can see the price of the work and the tax separately. Use the tax that applies to your job.
Use them as a pattern, not as fixed numbers. The 45 for fixings and the 40 for touchups were set for this sample. Confirm them against the actual wall and support system before you send the estimate.
The sample shows them as their own rows so the hours are easy to see. On a real job you can combine or split them to suit how you work. The important part is that every hour is counted once.
Pick the PDF for printing and handwritten entries, or Excel for editable descriptions and calculated totals. You can also use the separate browser editor on this page; it does not open or change your downloaded workbook.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.