How to create contractor estimates from voice notes

Say what needs doing while the visit is fresh. Then check your job details, review the costs and turn the work into a clear customer estimate.

3D contractor speaking into a phone with a microphone waveform while describing a living-room repaint

Before you start

  • Describe the work, measurements, preparation and exclusions in your own words.
  • Check the written note and confirm missing details before relying on the price.
  • Review materials and labor, then prepare a professional estimate for your customer.

To create contractor estimates from voice notes, talk through the work while the site visit is fresh. Check the written description, confirm any missing details, then review the costs before sending your price. In Construction Job Estimator, you can speak directly into your job description and edit it before building the estimate.

You don't need to speak like you're writing a proposal. Start with what you'd tell someone helping you price the work.

1. Describe the job in your own words

Here's an example note for a living-room repaint:

I've got a living room to repaint. It's twelve feet by ten, with eight-foot walls. Walls only, two finish coats. Leave the ceiling, doors and trim. There are a few picture-hook holes to fill. The customer will clear the furniture before we arrive. Include floor protection and cleanup. They haven't picked the paint finish yet.

That gives you a useful starting point: the work, measurements, preparation, exclusions and one decision still to make. Say the details that would change your price. Carrying materials up two flights of stairs matters; so does finding out you're expected to move all the furniture.

In the mobile app, start a new estimate and tap the microphone under Describe your job. Sign in and allow microphone access if prompted. Talk through the work, then tap to stop and let the last words appear in Job details.

Add site photos where they help explain a condition or an awkward area. Keep measurements in the description too, so you're working from recorded dimensions rather than guessing from a picture. If you need a reminder of what to capture before leaving, use the estimating site visit checklist.

2. Check the text and settle the missing details

Read the written note once before moving on. A mistaken number can change the whole estimate, so check dimensions, units and quantities carefully. Make sure "don't paint the ceiling" hasn't lost the word "don't."

For the repaint example, check that the description says 12 by 10 feet, 8-foot walls and two finish coats. Then fill in the gaps that affect the price.

Record openings separately. The room has 120 square feet of floor, but you're pricing walls. The gross wall area is 2 × (12 + 10) × 8 = 352 square feet before doors and windows. Measure those openings and use the paint calculator if you want help working through the surface area and paint quantity.

Be specific about preparation. Filling a few picture-hook holes is different from repairing a damaged wall. Add any further prep or primer the surfaces and selected paint need, then allow time and materials for that work.

Confirm the paint choice. In the note, the customer hasn't picked a finish. Once they've chosen the product, finish and color, add those details. If you're quoting with an agreed paint allowance instead, state what that allowance covers so the customer can see what may change.

Keep the job location with your details too. Your supplier options, travel and delivery costs need to reflect where you'll be working.

You can make these corrections directly in the text. There's no need to repeat the whole description because one measurement or finish has changed.

3. Review the materials, labor and other costs

The app turns your job details into a working estimate with materials, labor and other costs, using real-time material prices from local suppliers. Now check whether the breakdown matches the job you visited.

For this room, look at the paint quantities and pack sizes first. Confirm the selected product and supplier price, or enter a price you already have. Make sure the quantities relate to the walls you're painting, rather than the floor area or surfaces you've excluded.

Then review the labor. Protection, filling holes, preparing surfaces, applying paint and cleaning up all take time. Check the hours against how you'll do the work, including any agreed return visit. If two people are working, count the hours for both people rather than treating a crew-hour as one person's hour.

Before settling the price, check these items:

  • Furniture: the customer clears it in this example. If you'll do it instead, include that work.
  • Preparation: the time and materials should match the repairs you've actually agreed to.
  • Other costs: include delivery, equipment hire or disposal where the job needs them.
  • Overhead and markup: check what's already included in your rates and line items so you don't add the same cost or markup twice.

You can edit quantities, products, labor rates, markup and individual items in the app. Use that control to put your supplier quotes and knowledge of the site into the price.

4. Turn the note into a clear customer estimate

Your spoken description helps you remember the job. The customer needs a clear statement of what their price includes.

For our room example, the main scope could read:

Living-room wall repaint

Protect floors, fill picture-hook holes and sand the patched areas. Apply two finish coats of the selected wall paint to the living-room walls. Remove protection and clean up on completion.

Not included: painting the ceiling, doors or trim, or moving furniture. The customer will clear the furniture before work starts.

Put the agreed paint product, finish and color beside that scope. Add any further preparation or primer you've agreed to include, and check that it's covered in the price. The note's unfinished choices should now be clear selections or stated allowances.

Check the customer's details and read the finished estimate the way your customer will see it before you send it. For an example with itemized prices and a total, see what to send in a construction estimate.

Can you use a voice note you've already recorded?

If your phone or recording tool provides a text transcript, copy it into the app's job description and edit it there. Check the numbers and scope just as you would after dictating directly.

The steps above use the app's microphone to enter the description. For an existing recording, use its transcript text rather than assuming you can attach the audio file.

Describe the job before you leave the site

The details that change your price are easiest to recall right after the visit. Describe the work then, add photos of awkward areas, and use Construction Job Estimator to review the quantities, prices and labor behind each figure before you send the estimate.

← Back to all guides

Construction Job Estimator

Your next estimate.
Ready in minutes.

Tell us what needs doing. Get real-time material prices from local suppliers, bring your labour and other costs together, and send your customer a professional estimate.

Take the next job from description to estimate.

★★★★★ Used by 10k+ contractors