A clear price. A professional first impression.

Free composite deck installation estimate templateMake the next job
look this good.

Print the blank PDF, open the completed sample, or edit the eight-row Excel file. The sample is a composite deck surface replacement on an assessed existing frame, not a full new-deck price. You can see how a finished estimate reads before you fill in your own.

PDF & Excel · No signup for templates · By Daniel

COMPOSITE DECK INSTALLATION ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Composite decking on an assessed existing frame12 by 16 ft deck · 192 sq ft · frame retained
Old deck surface removal192 sq ft × $1.50
$288
Composite deck boards27 boards × $65
$1,755
Fascia boards4 boards × $85
$340
Fasteners and edge details1 package × $240
$240
Decking installation labor24 hours × $65
$1,560
Fascia and detail labor6 hours × $65
$390
Cleanup and disposal1 job × $180
$180
Subtotal Before applicable tax$4,753USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your composite deck installation estimate include?

Download a blank PDF to print and fill in, a completed example PDF, or an Excel workbook with formulas and eight editable line rows. Add your business and customer details, describe the scope and exclusions, then enter descriptions, quantities, units and rates. The separate browser editor on this page is another way to prepare your estimate.

Frame assessed as suitable

Confirm the existing frame suits the chosen decking system before you price it. The sample only works on an assessed frame. Never write the estimate as if a retained frame is a given.

Deck size and exposed edges

Record your measured size and which edges need fascia. In the sample, 12 × 16 gives 192 sq ft, and one side against the house leaves 40 ft exposed. Your deck will differ.

Board schedule and spare

Write out the cut schedule you will buy, including any spare. The quantity on the row should match the schedule, not a rough area guess.

Fascia, fasteners and edge items

Match fascia and fastening components to your selected system. Include stock lengths and purchase quantities in the descriptions or scope notes so you can check the takeoff.

Labor in person-hours

Enter hours worked by each person added together, at your own hourly rate. The sample uses 24 plus 6, or 30 person-hours. Don't add a second markup on top of a rate that already includes overhead and profit.

Scope, exclusions and reprice conditions

State what is included and what isn't. Write the condition for repricing if inspection or removal shows unsuitable framing. Keep tax, if it applies, on its own line after the subtotal.

From site visit to a clear figure

How to write your composite deck installation estimate.

  1. Write the scope and exclusions first

    Describe the surface work you're pricing, then list what is left out. In the sample, footings, framing replacement, structural design, stairs, guardrails and concealed frame repairs are excluded. Add your reprice condition here too.

  2. Take your measurements and set quantities

    Measure the deck and exposed edges, then prepare a cut schedule for the selected system. Enter the purchase quantities, units and selling rates. Record important stock lengths and assumptions in the descriptions or scope notes.

  3. Add removal, fasteners and cleanup

    Price old surface removal by the unit that suits your job. Add your fasteners and edge details and your cleanup and disposal. If you'd rather not build these rows by hand, Construction Job Estimator turns your spoken or typed job details, your measurements and site photos into a working estimate in minutes. It brings in local supplier prices. You review and adjust quantities, labor and markup, and you still check the scope.

  4. Enter labor as person-hours

    Split labor into decking and fascia or detail work if that helps your customer follow it. Use your own hourly rate. If that rate already carries overhead and profit, don't mark it up again.

  5. Review the subtotal and add tax separately

    Read every row as quantity times rate, then check the subtotal against your job costs. Add applicable tax as its own line. Print the PDF or save the Excel file once the scope and exclusions read the way you want.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked composite deck installation estimate example.

This is a surface replacement on a 12 by 16 ft deck: 192 sq ft, with an existing frame already assessed as suitable. Old boards are removed, composite decking and fascia installed, and ordinary waste cleared. The illustrative selling price is $4,753 before applicable tax; new framing, stairs and guardrails are excluded.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Composite decking on an assessed existing frame with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Old deck surface removalRemove existing surface boards; frame retained.192 sq ft × $1.50192 sq ft$1.50$288
Composite deck boardsApproved cut schedule: 26 installed 16 ft boards plus one spare.27 boards × $6527 boards$65$1,755
Fascia boardsFour 12 ft stock boards for 40 ft exposed perimeter.4 boards × $854 boards$85$340
Fasteners and edge detailsSelected system’s specified clips, screws and edge accessories.1 package × $2401 package$240$240
Decking installation laborFit the approved board schedule to assessed frame.24 hours × $6524 hours$65$1,560
Fascia and detail laborFit agreed perimeter fascia and finish details.6 hours × $656 hours$65$390
Cleanup and disposalOrdinary old-board disposal and final cleanup.1 job × $1801 job$180$180
Subtotal before applicable tax (USD)$4,753

The 26-board schedule belongs to this deck The 27 purchased boards are 26 installed 16 ft boards plus one spare. That is an assumed cut schedule for this sample, not an area-to-board formula. Board widths, gaps and edges vary, so build your own schedule from your selected system and your measurements.

Why fascia is bought at 48 ft for a 40 ft edge The exposed perimeter is 12 + 16 + 12 = 40 ft, because the fourth 16 ft side sits against the house. Four 12 ft fascia boards buy 48 ft. The extra length covers cuts and waste, and the row detail says so.

The fasteners package is sample-specific The $240 package covers the clips, screws and edge accessories for the system chosen in this sample. It is a lump sum for this job. Follow your own system's installation guidance when you set yours. Add applicable tax as a separate line after the subtotal.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Pricing the frame as a given

A surface replacement price only holds if the frame is suitable. Without an assessment and a reprice condition, a bad frame becomes your cost. Put the condition in the scope before the numbers.

02

Copying the 26-board schedule

That schedule fits one 12 by 16 ft deck and one cut plan. Using it as a formula for another job can leave you short or over-bought. Build the schedule from your own measurements.

03

Counting labor twice or marking up twice

The sample's amounts are selling prices with overhead and profit included once. Adding a markup on top of a finished selling price, or listing the same labor again in a package, inflates the price and muddies the estimate.

04

Leaving out the exclusions

If stairs, guardrails and structural work aren't written down as excluded, your customer may assume they're covered. List them above the price, in plain words.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Composite deck installation estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Can I use the sample prices on my own quote?

No. They're illustrative selling prices for a sample job. Keep the layout and the row logic, then enter your own costs, rates and quantities.

What if the frame isn't suitable when we open it up?

Reprice. The sample's scope says to reprice if inspection or removal shows unsuitable framing. Tell your customer that before work starts, and write it into your own estimate.

How do I add stairs or railings?

They're outside this sample's scope. Add them as separate agreed lines, or write a separate estimate. Keep them out of the surface replacement price so the scope stays clear.

Should I use the PDF or the Excel file?

Print the blank PDF and fill it in by hand if you want a paper estimate. Use the Excel file if you want formulas and eight editable rows. The browser editor also supports customization.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7

Your entries stay in this page. Download a copy before closing; refreshing clears them.