Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
Make your base price easy to review against the requested scope. Download a free bid template with a separate place for alternates, or prepare the estimate behind your bid in the app.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample project team
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
A construction bid should identify the documents priced, show the base scope and keep optional additions or deductions separate from the submitted base amount.
Identify the project, recipient, drawing or specification revisions and any addenda included in your price.
Describe the required work in the same order as the requested scope where practical.
Show your quantities and selling rates or clearly described package amounts. Avoid duplicating subcontractor inclusions.
List each optional addition or deduction with its scope and separate price adjustment.
State boundaries, assumptions and unresolved requirements explicitly so the recipient can compare your offer.
Include the document date, validity, proposed programme assumptions and the requested response or acceptance details.
From site visit to a clear figure
Check the invitation, drawings, specification and addenda. Record the revision set used to prepare the price.
Break the base work into measurable tasks. Keep optional substitutions out of the base quantities unless the invitation requires them.
Check inclusions and exclusions against the requested package. Resolve overlaps and missing interfaces before adding their prices.
Build the base selling price first. For each alternate, describe the difference and its addition or deduction without changing the base total.
Reconcile the summary to the detailed scope. Add validity, exclusions and programme assumptions, then review any project-specific submission requirements.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
The base bid prices a small office refresh against a fictional scope schedule. An optional flooring upgrade is shown separately, so the recipient can compare the base amount without an unselected addition.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Site setup and protectionProtect the room and access route4 hours × $60 | 4 hours | $60 | $240 |
| Floor removalRemove existing covering within the base scope6 hours × $60 | 6 hours | $60 | $360 |
| Specified flooring supplyMaterial purchase quantity for the base finish220 sq ft × $5 | 220 sq ft | $5 | $1,100 |
| Floor installation labourInstall the specified base flooring16 hours × $60 | 16 hours | $60 | $960 |
| Trims supplied and fittedAll-in supply and fitting package1 package × $250 | 1 package | $250 | $250 |
| Waste removal and completionOrdinary waste disposal and handover1 job × $180 | 1 job | $180 | $180 |
| Base subtotal before applicable tax (USD) | $3,090 | ||
Alternates — excluded from the base bid. Alternate A: upgraded finish flooring, add USD 300 before applicable tax. Excluded from the base bid. Confirm selection before revising the submitted total.
Keep the alternate separate. The USD 300 flooring upgrade is a price adjustment outside the base total. If selected, revise the relevant base items and reissue the bid with the accepted specification.
Use the right document revision. The reference is an illustrative scope identifier. Replace it with the drawings, specifications and addenda actually used for your submission, and reconcile the quantities to that scope.
Before you send it
A little clarity here can save a difficult conversation later.
A recipient should be able to compare your required-scope price without backing out an optional upgrade.
Keep a record of the drawings and addenda priced. Review changes before issuing an updated bid.
Compare supplier and subcontractor inclusions so a material or installation task appears once in the total.
Put qualifications alongside the submission rather than relying on an omitted line to explain the boundary.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
No. The dedicated alternates note is outside the base calculation in the PDF, Excel workbook and browser editor. Revise the priced line items and issue an updated document after an alternate is selected.
Use it as a starting worksheet. Check the invitation for required forms, breakdowns and supporting documents; this template does not replace project-specific submission requirements.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.