Print and fill it in
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleA clear price. A professional first impression.
This free deck repair estimate template is built for a limited board-replacement job. Download a printable PDF or an editable Excel file, then compare it with a completed example: EST-001, eight boards, existing frame retained, $1,174 before applicable tax.
PDF & Excel · No signup for templates · By Daniel
Prepared for: Sample customer
Scope and exclusions included in the download.
Choose your starting point
Download it now, add your business details and make the numbers your own.
A clean, one-page worksheet with task-specific line items and space for scope, exclusions and payment notes.
Download blank PDF Get the completed exampleEnter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.
Download ExcelIncludes a blank template and a completed example.
The details that make it clear
The blank PDF is printed, then filled in by hand. The completed PDF shows EST-001 so you can see a finished document. The Excel file is editable and uses formulas for line totals and the subtotal. It has eight rows, and the sample uses seven, so one is open for a job-specific item. Descriptions are editable, and the browser editor helps you change the wording. Fields cover business, customer, reference, scope, exclusions, line items with quantity, unit and rate, the subtotal, and a separate line for applicable tax.
Name the eight boards and note how you and the customer agreed on them, such as marked during your visit. A clear count and location keep the job limited and make it easy to confirm when you hand over.
The sample buys eight 12 ft boards, which is 96 linear feet. That isn't 96 square feet and it isn't the full deck area. Board size, support and fixings must match the actual product and the structure you inspected.
Show hours and your rate for each task, such as setup, removal, fitting and cleanup. Keeping labor on its own lines lets the customer and you see what the hours cover, apart from materials and fees.
List compatible fixings and cut-end treatment as their own line. Put delivery and waste charges in a separate fee line. That way the customer can see what the materials cost and what the fees cost.
State that the existing frame is retained subject to inspection. You're quoting only the inspected, limited scope. Replacing surface boards doesn't make a damaged structure safe, so don't word the estimate as if it does.
List what you're not pricing: joists, beams, posts, footings, ledger, stairs, guardrails and whole-deck finishing. Add a line saying hidden framing defects need reassessment. Show applicable tax as its own line after the subtotal.
From site visit to a clear figure
Use one or two sentences: the boards, the count and the retained frame. If you'd rather not build the line items by hand, Construction Job Estimator can turn your voice or text description, your measurements and site photos into a working estimate. Materials, labor and other costs sit together, and you adjust quantities, hours, rates and supplier prices. It doesn't measure the deck or check structure. It's $19.99 per month.
Give each task its own row, such as setup, removal, fitting and cleanup. Enter person-hours and your rate. Use the same rate logic across rows so the totals are easy to check, and don't layer another markup over it.
Enter boards by purchased quantity and unit. Add fasteners and cut-end treatment as a package, then delivery and disposal fees. Keep removal labor out of the disposal line, since you already priced it in the removal row.
Put the excluded items and the reassessment wording on the document itself. Do this before the customer sees a price, so the limited scope is clear from the start. Don't imply the estimate certifies the deck.
Confirm each line equals quantity times rate and that the lines add up to the subtotal. Then add applicable tax separately. Print the PDF or send the Excel or PDF file to your customer.
Take the estimate with you
Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.
Create an estimate in the app
See how the numbers fit
EST-001 replaces eight identified deck boards with eight selected 12 ft boards. It includes careful removal, compatible fasteners, fitting and disposal, and keeps the existing framing subject to inspection. The document excludes joists, beams, posts, footings, ledger, stairs, guardrails and whole-deck finishing. The subtotal is $1,174 before applicable tax. These are sample prices in USD; use your own costs and rates for your job.
Illustrative selling prices in USD. These are example inputs, not local market rates.
| Work / material | Quantity | Rate | Amount |
|---|---|---|---|
| Setup and protectionProtect access and mark the eight boards agreed for replacement.2 hours × $65 | 2 hours | $65 | $130 |
| Board removalRemove specified boards without treating retained framing as confirmed sound.3 hours × $65 | 3 hours | $65 | $195 |
| Replacement board materialsEight selected 12 ft boards; 96 linear ft purchased.8 boards × $28 | 8 boards | $28 | $224 |
| Fasteners and consumablesCompatible fixings and required cut-end treatment.1 package × $75 | 1 package | $75 | $75 |
| Board fitting laborCut and fit replacement boards to the verified support arrangement.6 hours × $65 | 6 hours | $65 | $390 |
| Delivery and disposal feesDelivery and waste charges; removal labor priced above.1 job × $95 | 1 job | $95 | $95 |
| Cleanup and handoverTidy and document completed board repairs.1 hour × $65 | 1 hour | $65 | $65 |
| Subtotal before applicable tax (USD) | $1,174 | ||
Purchased length is different from deck area Eight 12 ft boards give 96 linear ft of purchased timber. Their $224 price is eight boards at $28. The actual repair covers the identified boards, not the whole deck. Check board dimensions and the retained support before confirming your scope.
Overhead and profit are already in Every amount is a customer selling price, with overhead and profit included once. Don't add a second markup on top. These numbers are illustrations of one sample job, not live prices, typical rates or market averages.
Labor, materials and fees stay separate The labor lines total 12 person-hours at 65 an hour, or 780. Boards, fixings and fees total 394. Removal labor sits in its own line, and the 95 line covers delivery and waste charges only, so no labor is counted twice. Add applicable tax after the subtotal.
Before you send it
A little clarity here can save a difficult conversation later.
Eight 12 ft boards is 96 linear feet. Square footage describes area, and that's a different number. Writing it wrong can confuse the customer and your supplier order, so label the unit as linear feet.
The sample rates already carry overhead and profit once. If you add a percentage on top of those amounts, the price goes up in a way the line items don't explain. Enter your own selling rates and stop there.
In this sample, removal labor is in its own row and the delivery/disposal line covers fees only. If your waste package also includes handling labor, check that the same work has not already been included in removal.
If the estimate starts to mention framing, stairs or guardrails, it no longer matches the inspected, limited job. Keep those items in the exclusions, and don't word the estimate as though the deck is certified sound.
Choose what fits your next job
Useful when you want a familiar worksheet and already know the quantities and prices.
Bring job details, measurements and site photos into your estimating workflow on your phone.
A few helpful answers
Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.
Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.
Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.
Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.
No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.
Stop and reassess before you continue. The sample excludes framing and says hidden defects need reassessment, so the original price doesn't cover repairs you haven't inspected. Write up the new scope and price it separately for your customer.
The file has eight rows, and the sample uses seven. The spare row is there for a real extra item. Descriptions are editable, and the browser editor can help if you need to change the wording.
Add applicable tax separately after the subtotal. In the sample, that means after $1,174. Keep it on its own line so the customer can see the price of the work and the tax separately.
No. The sample splits the work so each line is easy to check. On your own job you can group or split lines to suit it. Just don't count the same labor in two places.
Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.
Add your job details and review the totals.
Your entries stay in this page. Download a copy before closing; refreshing clears them.