A clear price. A professional first impression.

Free hardwood floor refinishing estimate templateMake the next job
look this good.

Download a printable blank PDF, a completed sample PDF or an editable Excel file for pricing hardwood floor refinishing. The sample is a 400 sq ft occupied-home job with a $2,365 subtotal before applicable tax. Adapt it to the floor you've assessed.

PDF & Excel · No signup for templates · By Daniel

HARDWOOD FLOOR REFINISHING ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Occupied-home hardwood floor refinish400 sq ft · assessed sandable floor · natural finish
Protection and setup3 hours × $65
$195
Sanding labor400 sq ft × $1.80
$720
Equipment and abrasives1 package × $190
$190
Minor filling and preparation4 hours × $65
$260
Filler and coating materials1 package × $285
$285
Coating labor8 hours × $65
$520
Return setup and final cleanup3 hours × $65
$195
Subtotal Before applicable tax$2,365USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your hardwood floor refinishing estimate include?

Download a blank PDF to print and fill in, a completed example PDF, or an Excel workbook with formulas and eight editable line rows. Add your business and customer details, describe the scope and exclusions, then enter descriptions, quantities, units and rates. The separate browser editor on this page is another way to prepare your estimate.

State the scope in measurable terms

Write the floor area, the rooms and the assessed condition. Call the work refinishing, not a polish or maintenance recoat. The sample says 400 sq ft of assessed sandable hardwood, so the customer knows what you agreed to do.

List exclusions plainly

Name what the price doesn't cover. The sample leaves out new flooring, board replacement, extensive stains, structural repairs, furniture moving, stairs and color staining. Putting this on the page before the customer signs heads off arguments about extras.

Show protection, setup and furniture

Give protection and setup its own line and say who clears the room. The sample uses 3 hours for protecting adjacent areas and setting up equipment, and it states that the customer clears furniture before work starts.

Price sanding as its own line

Sanding goes in as a unit line, and equipment and abrasives sit on a separate line. That way the equipment cost isn't buried in the sanding rate. Your own job may split these differently, as long as each cost is counted once.

Tie materials and coating to the product system

Name the filler, sealer and finish you plan to use, then add filling, preparation and coating labor. Don't assume a coat count or drying time. The selected floor and product instructions set those, so check them before you commit.

Close with returns, cleanup, subtotal and tax

Show the agreed return visits and final cleanup, then the subtotal. Add a separate line or note that applicable tax is added on top. Your customer then sees exactly what the subtotal covers and what comes after it.

From site visit to a clear figure

How to write your hardwood floor refinishing estimate.

  1. Assess the floor before you price it

    Confirm the wear layer, the condition and product compatibility before you agree to sanding work. The selected floor and product instructions control what's possible. If the floor can't take sanding, don't fill in this template for it.

  2. Measure and write the scope to match

    Measure the floor area and list the rooms. Then write the scope and exclusions to match the work you'll do. Replace the sample's 400 sq ft and its exclusion list wherever your job differs, including who clears the furniture.

  3. Swap in your own costs

    Replace the sample hours, the $1.80 sanding rate and both package amounts with your own. Keep overhead and profit inside those prices once. Adding a markup line on top of prices that already include them would count it twice.

  4. Keep person-hours separate from sanding

    Work out the hours for protection, preparation, coating and returns, and price sanding on its own unit line. Don't let the hourly lines quietly cover sanding too. Add return visits only where you've agreed them with the customer.

  5. Review, add tax and send

    Check the subtotal, add applicable tax separately, then send the PDF or the Excel file. If you'd rather build the estimate from the job itself, Construction Job Estimator lets you describe it by voice or text with your measurements and photos. It brings in real-time material prices from local suppliers, and you review the labor, markup and line items before sending the quote to your customer.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked hardwood floor refinishing estimate example.

This occupied-home example refinishes 400 sq ft of assessed sandable hardwood with a natural finish. The customer clears the furniture. Sanding, preparation, coating, materials, equipment and two agreed return visits total $2,365 before applicable tax. These are illustrative selling prices in USD.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Occupied-home hardwood floor refinish with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and setupProtect adjacent areas and set up agreed equipment.3 hours × $653 hours$65$195
Sanding laborScheduled sanding and edging labor for assessed floor.400 sq ft × $1.80400 sq ft$1.80$720
Equipment and abrasivesAgreed hire and abrasives; not included in sanding labor rate.1 package × $1901 package$190$190
Minor filling and preparationScheduled minor filling and final preparation labor.4 hours × $654 hours$65$260
Filler and coating materialsSelected filler, sealer and finish system materials.1 package × $2851 package$285$285
Coating laborApply the agreed coating system; drying is not continuous labor.8 hours × $658 hours$65$520
Return setup and final cleanupHandling for agreed returns and final cleanup; coating time above.3 hours × $653 hours$65$195
Subtotal before applicable tax (USD)$2,365

Prices already include overhead and profit The amounts are illustrative prices to the customer, with overhead and profit included once. No second markup is added on top. They aren't live prices, typical rates or market averages, so replace each one with your own figure before you send anything.

Sanding and hourly work are separate Sanding is a unit labor line at $1.80 per sq ft. The 18 person-hours on the other lines (3 + 4 + 8 + 3) don't cover it. The sample counts sanding labor once, on its own line, and the hourly lines cover the rest of the work.

Know what the $2,365 leaves out The subtotal excludes new flooring, board replacement, extensive stains, structural repairs, furniture moving, stair work and color staining. Applicable tax is added separately. The two returns, the equipment package and the materials package are allowances specific to this sample, not standard amounts.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Quoting a polish or recoat as a refinish

A polish or maintenance recoat isn't sanding and refinishing, and the price shouldn't read like it is. Write the scope to match the work. If you plan to sand, confirm the floor can take it first.

02

Counting the hours as sanding labor

In the sample, the 18 person-hours cover protection, preparation, coating and returns only. Sanding labor is the $720 line at $1.80 per sq ft. If you count sanding in both places, your price is too high. If you count it in neither, you've underpriced the job.

03

Adding a second markup

Each line in the sample is already a price to the customer, with overhead and profit in it. Adding a markup line on top charges for them twice. Decide where your overhead and profit go, then apply them once.

04

Leaving out exclusions, tax or product limits

If the page doesn't say stairs, board replacement or color staining are excluded, expect questions later. Show tax as a separate addition. Don't assume a coat count or drying time. Follow the selected product instructions and write down what you agreed.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Hardwood floor refinishing estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Why is sanding per sq ft when other lines are hourly?

In this sample, sanding is a unit labor line, and the hourly lines cover protection, preparation, coating and returns. That's a layout choice, not a rule. Use whatever split fits your own job, but count each piece of labor only once.

Does the $2,365 include tax?

The example subtotal is before applicable tax. In the Excel workbook or browser editor, mark the taxable lines and enter the rate that applies to your job. Check the resulting tax and final total before sending.

How do I handle drying and returns?

Coating labor is the 8 hours of actual work, not waiting time. The sample's return line covers setup and cleanup for two agreed visits. Drying and reoccupation follow the selected product instructions, so confirm them for your floor and finish.

Can I use the Excel file for a different-size floor?

Yes. Change the area, the rates and the descriptions across the eight rows, and the subtotal recalculates. Then recheck your scope and exclusions against your site assessment, since the sample's wording fits only the sample floor.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7

Your entries stay in this page. Download a copy before closing; refreshing clears them.