A clear price. A professional first impression.

Free popcorn ceiling removal estimate templateMake the next job
look this good.

Download a blank printable PDF, a completed PDF for a 300 sq ft ceiling, or an editable Excel template. The price applies only after the ceiling material has been assessed separately. The sample subtotal is 2,135 USD before applicable tax, so swap in your own rates.

PDF & Excel · No signup for templates · By Daniel

POPCORN CEILING REMOVAL ESTIMATEEST-001

Daniel & Sons

Prepared for: Sample customer

Assessed ceiling texture removal and refinish300 sq ft ceiling · assessment completed separately
Protection and setup1 package × $250
$250
Assessed texture removal300 sq ft × $1.80
$540
Surface finishing300 sq ft × $2.20
$660
Primer and ceiling paint1 package × $145
$145
Priming and painting labor6 hours × $60
$360
Cleanup and ordinary disposal1 package × $180
$180
Subtotal Before applicable tax$2,135USD

Scope and exclusions included in the download.

Illustrative example. Use your own quantities and prices.

Choose your starting point

A useful template.
Yours to keep.

Download it now, add your business details and make the numbers your own.

EXCEL

Edit. Calculate. Save.

Enter your quantities and selling rates. Line amounts, selected-line tax and the total calculate for you.

Download Excel

Includes a blank template and a completed example.

The details that make it clear

What should your popcorn ceiling removal estimate include?

Download a blank PDF to print and fill in, a completed example PDF, or an Excel workbook with formulas and eight editable line rows. Add your business and customer details, describe the scope and exclusions, then enter descriptions, quantities, units and rates. The separate browser editor on this page is another way to prepare your estimate.

Assessment is confirmed

Make sure a suitable assessment is finished and ordinary removal is appropriate before the price applies. Appearance can't tell you whether a ceiling contains asbestos. If the material is suspect, don't disturb it while the assessment is unresolved. Arrange qualified assessment first. EPA guidance explains why appearance alone cannot identify asbestos.

Area is measured

Confirm the ceiling's square footage before you price. The sample uses 300 sq ft for both removal and finishing. Keep the unit the same across area-based rows so the quantities match the scope you wrote.

Scope names the finish

Write the finish you're pricing, the primer and paint, and the protection you agreed to. A customer should be able to read the scope and know what the smooth finish means on this ceiling.

Exclusions are written out

Start from the sample list: testing, hazardous-material abatement, structural repairs, board replacement, fixtures and concealed water damage. Then add anything specific to this ceiling. Put the list on the estimate, not just in a text message.

Labor is in person-hours

Show coating labor as hours at a rate, and keep it separate from the finishing package. Hours are total work hours by the people doing the job. They aren't a promise of how long the job will take on the calendar.

Tax sits below the subtotal

Show the subtotal first, then add applicable tax as its own line. Keep overhead and profit inside your rates once. The 2,135 USD sample subtotal doesn't include tax.

From site visit to a clear figure

How to write your popcorn ceiling removal estimate.

  1. Choose your file

    Print the blank PDF to fill it in by hand, or use the Excel workbook with eight editable line rows and formulas. You can also edit line items in the separate browser editor on this page.

  2. Enter the header and scope

    Add your business name, customer, reference number and a short scope. State the condition in the scope: the price applies only after a suitable assessment confirms ordinary removal is appropriate. Paste in your exclusions list below it.

  3. Build your rows

    For each line, enter a description, quantity, unit and rate. The sample uses packages, square feet and hours where those units fit. Use the units that fit your job. The Excel file uses six of its eight rows, so two stay open.

  4. Check the math

    Multiply each quantity by its rate and add the line amounts. The subtotal should equal that sum. Look for finishing labor counted twice, or a markup added to rows that already include overhead and profit.

  5. Add tax and send

    Add applicable tax as a separate line, then send the estimate. If you'd rather not build rows by hand, Construction Job Estimator lets you describe the job by voice or text, add site photos and your measurements, and review local supplier prices, labor and disposal together. Check the scope and figures, then send your customer a professional estimate.

Take the estimate with you

Job details in.
A clearer estimate out.

Bring the scope, materials and labour together in Construction Job Estimator. Review the breakdown and adjust it to suit the job, with your business details on the quote.

Create an estimate in the app
Illustration of a contractor reviewing a materials list on a tablet

See how the numbers fit

A worked popcorn ceiling removal estimate example.

After a suitable assessment confirms ordinary removal is appropriate, this sample prices removal and a smooth painted finish for a 300 sq ft ceiling. The $2,135 subtotal includes protection, removal, finishing, coating and ordinary cleanup. These are illustrative selling prices, before applicable tax.

Illustrative selling prices in USD. These are example inputs, not local market rates.

Assessed ceiling texture removal and refinish with quantities and illustrative USD selling rates
Work / materialQuantityRateAmount
Protection and setupAgreed ordinary-work protection and setup; not an abatement enclosure.1 package × $2501 package$250$250
Assessed texture removalOrdinary removal labor for the assessed ceiling; no hazardous-material work.300 sq ft × $1.80300 sq ft$1.80$540
Surface finishingSpecified smooth finish preparation, materials and labor.300 sq ft × $2.20300 sq ft$2.20$660
Primer and ceiling paintSelected coating materials for agreed finish.1 package × $1451 package$145$145
Priming and painting laborCoating labor for assessed ceiling.6 hours × $606 hours$60$360
Cleanup and ordinary disposalFinal cleanup and nonhazardous waste fees.1 package × $1801 package$180$180
Subtotal before applicable tax (USD)$2,135

Removal and finishing are separate tasks Both area-based rows use the same 300 sq ft ceiling. Removal is $540 and the all-in surface finishing package is $660. Primer and paint materials cost $145; their application labor is separate. Protection and ordinary cleanup complete the $2,135 subtotal.

Where double-counting creeps in Surface finishing is an all-in package for materials and labor, so don't add blanket finishing labor on top. Coating labor stays in its own row, counted as person-hours. The rates already carry overhead and profit, so don't put a second markup over the rows.

Allowances and exclusions in the sample Protection and setup and cleanup are sample-specific amounts, so change them for each job. Protection means ordinary-work protection, not an abatement enclosure. Disposal covers nonhazardous waste only. Excluded: testing, asbestos or other hazardous-material abatement, structural repairs, board replacement, fixtures and concealed water damage.

Read the full estimating guide

Before you send it

Four easy things to miss.

A little clarity here can save a difficult conversation later.

01

Pricing before the assessment is settled

If the material is suspect and nobody has assessed it, the estimate shouldn't read as a firm price. Keep it conditional, and don't imply the price covers suspect material. The customer should see that the price applies only after assessment.

02

Burying the exclusions

Leaving exclusions only in a text message makes the estimate harder to understand. List testing, abatement, structural repairs, board replacement, fixtures and concealed water damage beside the scope.

03

Counting the same cost twice

Don't add blanket labor to an all-in finishing package. Don't mark up rows that already include overhead and profit. Either mistake pushes the total up and makes the rows harder to defend when the customer asks questions.

04

Copying the sample numbers

The 250 and 180 allowances, the per-square-foot rates and the 60 hourly rate are sample figures. Replace them with your own. Also keep tax out of the subtotal so the customer can see both amounts clearly.

Choose what fits your next job

A template for a starting point.
An app for the whole estimate.

Use the free template

Useful when you want a familiar worksheet and already know the quantities and prices.

  • Print a PDF or edit the Excel file
  • Use your own materials and labour rates
  • Keep and organise the files yourself
Choose a download

Use Construction Job Estimator

Bring job details, measurements and site photos into your estimating workflow on your phone.

  • Review materials, quantities and labour together
  • Adjust the breakdown for the actual job
  • Prepare a quote with your business details

A few helpful answers

Popcorn ceiling removal estimate template FAQs.

Is this template free?

Yes. Download the blank PDF, completed PDF example and Excel workbook without an account or app installation.

Which format should I choose?

Use the PDF to print and fill in by hand. Choose Excel to edit quantities and selling rates with calculated line amounts, selected-line tax and totals. The workbook includes a separate completed example.

Can I use the workbook in Google Sheets?

Upload the .xlsx file to Google Drive and open it in Google Sheets. Check the layout and calculations after importing. This is an Excel file, not a hosted Google Sheets copy link.

Can I use this in the USA or Canada?

Yes. Enter your own USD or CAD prices and applicable tax treatment. The example is in USD. Changing the currency label does not convert prices or choose a tax rate.

Are the example prices recommended rates?

No. These are illustrative inputs for a fictional job, used to show the document structure and arithmetic. Replace them with inspected quantities and your own selling prices.

Can I send this before the assessment is done?

Only as a conditional draft. The price applies after a suitable assessment confirms ordinary removal is appropriate. Until then, don't disturb suspect material. Say so in the scope so the customer knows the number depends on that result.

Why is coating labor a separate row?

Surface finishing is an all-in package for materials and labor. Priming and painting labor is a different task, so the sample prices it on its own: 6 hours at 60, or 360. Treat those hours as person-hours, not a schedule promise.

What if the ceiling has water stains or needs board work?

The sample excludes concealed water damage and board replacement. If you find either, agree on a separate line or a change order with the customer. Price it from your own costs once the scope is clear.

Do I add tax to the 2,135 USD?

The example subtotal is before applicable tax. In the Excel workbook or browser editor, mark the taxable lines and enter the rate that applies to your job. Check the resulting tax and final total before sending.

Can I edit this in the browser?

Yes. Open the optional browser editor below. Download or print a copy before leaving: the editor does not save entries after a refresh.

Prefer to fill it in here?Open the free browser editor.

Make it your own.

Add your job details and review the totals.

Enter your applicable tax rate. Tax applies only to marked lines.

Enter selling rates, including any overhead and profit you intend to charge. Currency changes the label, not the amounts.

Line 1
Line 2
Line 3
Line 4
Line 5
Line 6

Your entries stay in this page. Download a copy before closing; refreshing clears them.